Consideration of issues raised by UNC Modification Proposal 0244

Slides:



Advertisements
Similar presentations
Funding UKLink Process changes (User Pays). 2 Purpose of Presentation  Review of User Pays  Principles  Application to date  National Grid NTS observations.
Advertisements

Review of industry code governance 26 March 2010.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
A regulatory framework for gas quality treatment facilities: recap and update.
UNC Modification Proposal Revised Timescales for LDZ Shrinkage Arrangements Simon Trivella – 25 th September 2008 Distribution Workstream.
UNC Urgent Modification Proposal 0275 Timeline.  Day 1  User raises APP Conquest Query with requested loads (BSSOQ, SOQ, SHQ) and provides warrant from.
UNC Urgent Modification Proposal 0275 Supplemental Analysis and Timeline.
Mod for Discussion on 7 th January 2011 Draft Outline of Potential Refinements to the User Pays Modification Process Action RG Based on discussions.
Mod 0445 – Amendment to the Arrangements for Daily Metered Supply Point Capacity Ofgem Direction to Provide Further Evidence National Grid Distribution.
ADD PRESENTATION TITLE HERE (GO TO: VIEW / MASTER / SLIDE MASTER TO AMEND) ADD PRESENTER’S NAME HERE / ADD DATE HERE © Copyright EDF Energy. All rights.
Code Administrators Working Group Introduction 28 August 2008.
Code Governance Review UNC Modification Proposals Chris Shanley - National Grid NTS.
UNC Modification 0213 – User Pays Governance Arrangements Simon Trivella – 19 th June 2008 Governance Workstream.
Revision of the UNC Post-Emergency Arrangements draft proposal July 2009.
Discretionary Release of Non Obligated NTS System Entry Capacity Transmission Workstream 1st May 2008.
UNC Proposal 329 – Review of Industry Charging & Contractual Arrangements - DM SHQs and DM SOQs Joel Martin – 21/09/10.
DN Interruption Reform Distribution Workstream 23 rd July 2009.
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
Industry data quality, ownership and governance Meeting with UNC 17 July 2014.
11 User Pays User Committee 14th September Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
Code Governance Review UNC Modification Proposals Beverley Viney - National Grid NTS.
Agency Charging Statement Overview of Consultation 11 th February 2008.
1 Review Group 264 Rules & Options Analysis for BSSOQ Methodology Changes Post MOD th September 2009.
Energy Market Issues for Biomethane Projects Workshop - 31 October 2011 RIIO-GD1 Environmental Incentives.
Datalogger / DMV Modification Proposals - Summary Simon Trivella – 26 th August 2010 Distribution Workstream - Elexon U P D A T E.
IGT and Shipper Workgroup meeting 28 th February 2011.
Stuart Forrest, Network Planning Manager, Scotia Gas Networks 19 th October 2010 MOD Review of Industry Charging & Contractual Arrangements in Relation.
Distribution workstream 29th January 2009
Presentation to the BSC Panel
Supply Point Enquiry Service
Transmission Workstream February 2009
Consideration of issues raised by UNC Modification Proposal 0244
Modification Proposal 0283 Update
Presentation to the BSC Panel
Distribution Workgroup 24/11/16
Datalogger / DMV Modification Proposals - Summary
Review of UNC Section Q “Emergencies”
Code Governance Review UNC Modification Proposals
UNC Trader User – Licence obligations
0350 – Combining the NTS entry capacity and exit capacity credit checks Chris Shanley.
UNC Modification – Non Effective Days
NTS Entry Charging Review Update
Modification th July 2008.
Reduction of Exit Capacity at DM Supply Points
Exit Capacity Substitution and Revision
The Necessary Criteria for a UNC Modification Proposal
Consideration of issues raised by UNC Modification Proposal 0244
Chris Warner UNC Modification Panel 21 December 2017
0350 – Combining the NTS entry capacity and exit capacity credit checks Chris Shanley.
Transmission Workgroup 6th March 2014
Mod 0621 Amendments to Gas Transmission Charging Regime
Datalogger / DMV Modification Proposals - Summary
Proposed Transitional Gas Exit Arrangements
Transmission Workstream 2nd December 2010
Revised Tender Timescale for DN Interruption Arrangements
Richard Fairholme Transmission Workstream 4th September 2008
Mark Freeman 29th January 2007
Options for the Development of a Demand Side Response Mechanism
Ofgem presentation to Gas Transmission Workstream
DN Interruption Phase II
195AV “Future work” – system flexibility
Commercial Arrangements For Gas Quality Service – Introduction
Transmission Workstream, 1 Mar 07
Revised Tender Timescale for DN Interruption Arrangements
UIG Task Force Progress Report
UIG Task Force Progress Report
KVI Analysis for period 1st May 2018 to 31st March 2019
Gas Customer Forum 28 July 2008
KVI Analysis for period 1st May 2018 to 31st March 2019
Capacity Access Review
Presentation transcript:

Consideration of issues raised by UNC Modification Proposal 0244 23 July 2009

Background Reduced demand at DM Supply Points as a consequence of economic downturn Mothballed plant Reduced / curtailed production Current UNC rules limit opportunities for the reduction of Registered DM Capacity Concerns raised by Consumers at Gas Customer Forum UNC Modification Proposal 0244 (and 2 alternates) sought changes to UNC regime governing reduction of the Ofgem rejected all three proposals in May 2009 Decision letter “…it may be appropriate for GDNs to consider whether some form of transitional relief is appropriate…”, “…The industry may wish to consider whether…they wish to consider developing further proposals…”, “…We therefore consider that the GDNs should consider alternative solutions to target the potential problem identified…”

Proposed Approach xoserve ‘Rules and Options Analysis’ in progress Raise UNC Review Proposal – Convene Review Group Involves all UNC parties in consideration of whether change is necessary Requires participation of Users and consumers to accurately identify the scale and significance of the issue Opportunity to identify and collate evidence Ofgem identified that there was a lack of analysis in respect of the 0244 Mods Priority given to discussion and development of short term measures Xoserve’s analysis used as necessary Feedback welcome in respect of the scope of work: possible ‘transitional relief’ (short term). Focus on charging regime? UNC or other e.g. supply contract remedy? possible changes to the BSSOQ / ratchet regimes (long term) In respect of any solutions identified mitigation measures to prevent inappropriate behaviours likely impact of any changes on consumers affected likely impact of changes on other consumers charges (i.e. costs that are recovered from the rest of the GDN consumer base) the impact on investment decisions Raise UNC Modification Proposal if necessary (can be during course of group discussion)

Proposed timetable of events xoserve ‘Rules and Options Analysis’ request raised Publish proposed timetable to UNC Distribution Workstream Gas Customer Forum Raise Review Proposal at UNC Modification Panel. Identify and agree Terms of Reference (to include a requirement to Identify possible short and long term solutions). Convene group Review Report to UNC Modification Panel Raise UNC Modification Proposal (if required) Develop and implement process and systems solutions (if required) onwards 1st June 2009 23rd July 2009 27th July 2009 6th August 2009 December 2009 January 2010 Short term measures pursued as a priority (eg: UNC Mod)