Liaison from 802.15 to 802.18 Date: 18 January 2018 January 2018 Name Affiliation Address Phone email Jay Holcomb, Vice-Chair 802.18 Itron, Inc. Liberty Lake, WA +1-509-891-3281 jay.holcomb@itron.com Notice: This document has been prepared to assist IEEE 802.18. It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Jay Holcomb (Itron)
January 2018 Overview This document summarizes the activities of the IEEE 802.15 Working Group for IEEE 802.18 RR-TAG during the January 2018 IEEE 802 Interim Meeting at the Hotel Irvine, Newport Beach, CA, USA. Jay Holcomb (Itron)
Task Group Status (1/2) January 2018 Task Group Closing Reports: CLOSING REPORT: TG3f 60GE (60GHZ EXTENSION) - ROLFE done CLOSING REPORT: TG4s SRU (SPECTRUM RESOURCE UTILIZATION) - KITAZAWA done CLOSING REPORT: TG4md 15.4 REVISION - STUEBING’Heile 15-18/____ CLOSING REPORT: TG7m (7r1) OWC (OPTICAL WIRELESS COMMS) - JANG 15-18/0041r01 CLOSING REPORT: TG8 PAC (PEER AWARE COMMUNICATIONS) - LEE done CLOSING REPORT: TG10a ROUTING MODE ADDITIONS (RMA) - POWELL 15-18/0045r00 CLOSING REPORT: TG12 ULI (UPPER LAYER INTERFACE) - KINNEY 15-18/0012r01 CLOSING REPORT: TG13 MGOWC (MULTI-GIGBIT OWC) - JUNGNICKEL 15-18/0065r00 Jay Holcomb (Itron)
Study & Interest Group Status January 2018 Study & Interest Group Status SGs CLOSING REPORT: SG15.4w LPWA ROBERT 15-18/0058r01 CLOSING REPORT: SG15.4x FANE GILMORE 15-18/0049r00 CLOSING REPORT: SG SECN (SECURITY NEXT GENERATION) STUREK 15-18/0052r04 IGs CLOSING REPORT: IG VAT (VEH. ASSIT TECH.) - JANG 15-18/0044r00 CLOSING REPORT: IG HRRC (HIGH RATE RAIL) - KIM not meeting CLOSING REPORT: IG DEP (DEPENDABILITY - KOHNO not meeting CLOSING REPORT: IG THZ - KURNER not meeting CLOSING REPORT: IG ELR (ENHANCED LOW RATE) – HARRINGTON 15-18/0023r01 SCs CLOSING REPORT: IETF/RULES/SC-M/15.4-2015 COR1 - KINNEY 15-18/0014r00 CLOSING REPORT: WNG - KINNEY “ (same as above) Jay Holcomb (Itron)
Other Group Status Liaison Reports Other: January 2018 802.11 LIAISON REPORT - Petrick 15-18/0060r01 802.18 LIAISON REPORT - Holcomb 15-18/0056r00 802.24 LIAISON REPORT - Rolf verbal Other: Jay Holcomb (Itron)
802.15 Meeting Close The 802.15 WG adjourned Thursday evening January 2018 802.15 Meeting Close The 802.15 WG adjourned Thursday evening The next face to face meeting of the WG 802.15 will be the Plenary March 4-9, 2018, Hyatt Regency O’Hare, Rosemont, Illinois, USA Jay Holcomb (Itron)