Cost Estimating Best Practices

Slides:



Advertisements
Similar presentations
Presented by: Waymon Lofton & Jerry Coppo Practical Risk Analysis 2007 AACEI Conference.
Advertisements

Process and Procedure Documentation. Agenda Why document processes and procedures? What is process and procedure documentation? Who creates and uses this.
Best Practices for an Owner Estimating Organization
CON 4003 CVE 4073/5073 The Estimating Process Prof. Ralph V. Locurcio, PE.
Introduction to Project Management Avneet Mathur
COMMERCIAL “SOLE SOURCE” PROPOSAL ANALYSIS ROADMAP 1. Is information available within the Government? Step 1 – Information within the Government If Yes.
IIBA Denver | may 20, 2015 | Kym Byron , MBA, CBAP, PMP, CSM, CSPO
Project Plan Development
Hartley, Project Management: Integrating Strategy, Operations and Change, 3e Tilde Publishing Chapter 12 Integration Management Practising a common, coordinated.
Development and Quality Plans
Pre-Project Planning Lessons from the Construction Industry Institute Construction Industry Institute Michael Davis, P. Eng, PMP Ontario Power Generation.
Advanced Project Management Project Plan Templates
Project Management: Madness or Mayhem
S/W Project Management
Project Risk and Cost Management. IS the future certain? The future is uncertain, but it is certain that there are two questions will be asked about our.
From Research Prototype to Production
Michael Dermody September 2010  Capability Maturity Model Integration ◦ Is a Trademark owned by the Software Engineering Institute (SEI) of Carnegie.
Federal Agency Update - A Public Real Estate Symposium Las Vegas, Nevada January 26, 2010 Procedures Guide for Right of Way Cost Estimation and Cost Management.
Topic: Cost Estimating, Contract Pricing, & Sources of Risk By: Gregory A. Garrett, CPCM, C.P.M, PMP Managing Director April 28, 2009.
Construction Cost Estimating Class #2: The Estimating Process Prof. Ralph V. Locurcio, PE.
Week 2 Seminar: Project Scope Management
Strong9 Consulting Services, LLC 1 PMI - SVC I-80 Breakfast Roundtable Monthly Meeting Thursday, October 12, :00 am – 9:00 am.
The views expressed in this presentation do not necessarily reflect those of the Federal Reserve Bank of New York or the Federal Reserve System Association.
CON 4003 CVE 4073/5073 Construction Cost Estimating Class #2: The Estimating Process Prof. Ralph V. Locurcio, PE.
In the name of Allah the Most Gracious the Most Merciful.
July 14, Rural Electric Cooperatives Procurement/Contracting Guidance Roger Jones Region VIII Disaster Assistance Division.
Chapter 14 Pricing and Estimating. Pricing and Estimating Many managers regard pricing as an art ! Many managers regard pricing as an art ! Information.
Data Quality Improvement This material was developed by Johns Hopkins University, funded by the Department of Health and Human Services, Office of the.
2006 CMBG Conference Keith A. Reinsmith PPL Susquehanna 2006 CMBG Conference June 11-14, 2006 Richmond, VA Configuration Management Awareness Training.
Evaluate Phase Pertemuan Matakuliah: A0774/Information Technology Capital Budgeting Tahun: 2009.
What is project management?
Project Planning Goal 1 - Estimates are documented for use in tracking and planning project. Goal 2 - Project Activities and commitments planned and documented.
Pertemuan 14 Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
6/6/ SOFTWARE LIFE CYCLE OVERVIEW Professor Ron Kenett Tel Aviv University School of Engineering.
Implementing an IT Project Oversight Discipline in Government Cindy Blehm, PMP ® Maisha Dottery, PMP ® September 23, 2009.
1. 2 Cost & Price Analysis Breakout Session # 312 Beverly Arviso, CPA, Fellow, CPCM, CFCM, Arviso, Inc. Melanie Burgess, CPA, CFCM, Burgess Consulting,
ISO Certification For Laboratory Accreditation ISO Certification For Laboratory Accreditation.
University of Palestine Faculty of Applied Engineering & Urban Planning Civil Engineering Department Engineering Project Management Chapter 1 Introduction.
Chapter 3: Cost Estimation Techniques
Project Management 6e..
Project Cost Management
Cost Estimating Investment Planning and Project Management
Chapter 3: Cost Estimation Techniques
ISA 201 Intermediate Information Systems Acquisition
7.3 Determine Budget The process of aggregating the estimated costs of individual activities or work packages in order to establish an authorised cost.
Establishing and Managing a Schedule Baseline
12.2 Conduct Procurements The process of obtaining seller responses, selecting a seller and awarding the contract The team applies selection criteria.
Identify the Risk of Not Doing BA
Project Integration Management
TechStambha PMP Certification Training
ISA 201 Intermediate Information Systems Acquisition
(Additional materials)
Chapter 5: Project Scope Management
Project Management.
Introduction to Project Management Avneet Mathur
Sample Problems in Government Procurements
Chapter 3: Cost Estimation Techniques
CIVL 493 CONSTRUCTION MANAGEMENT
Created by Katy Koenen © Microsoft Corporation
Chapter 3: Cost Estimation Techniques
Benchmarking GEOP 4316.
What is Project Cost Management?
Importance of Project Schedules
Software Testing Lifecycle Practice
Chapter 3: Project Integration Management
Assumptions INFS 4810.
Executive Project Kickoff
Process and Procedure Documentation
Chapter 3: Cost Estimation Techniques
TOTAL COST CONTROL ON CONSTRUCTION PROJECTS
Presentation transcript:

Cost Estimating Best Practices SAME Tulsa Post Cost Engineering Workshop Mark A Childs CCP, PMP 19 March 2019 Tulsa, OK

Michael Baker – Fast Facts

What is a Cost Estimate? A cost estimate is the prediction of the cost of a program, project or operations. GAO defines it as “the summation of individual cost elements, using established methods and valid data, to estimate the future costs of a program, based on what is known today”. What is the purpose of a cost estimate? Cost estimates are used to make decisions and manage risk. The cost estimate along with the project scope and schedule is the foundation of cost management of the project.

AACE 17R-97 Cost Estimate Classifications

High Quality Cost Estimates* Credible Well-Documented Accurate Comprehensive Define Purpose Develop Plan Define Characteristics Determine Structure Conduct Sensitivity Analysis Develop Point Estimate Obtain Data ID Ground Rules & Exceptions Risk & Uncertainty Analysis Document Estimate Present for Management Approval Update to Reflect Actuals * GAO Guidance

Characteristics of a Credible Cost Estimate Estimating Methodology based on the intended use of the estimate Contracting Strategy and Risk Management are considered The cost estimate is based upon a project schedule Develop quantity take off to extent possible to avoid the use of allowances Prepare the direct cost estimate using appropriate material, labor, equipment, and subcontract pricing (including taxes, shipping, etc.) Prepare a detailed estimate of indirect cost (home office, OH, etc.) Include escalation as a separate line item Allow time for an Independent Review & QC Compare the estimate against known benchmarks Prepare cost and schedule risk analysis – Include contingency Provide a supporting narrative explaining the estimating approach used, major assumptions, and limitations of the cost estimate.

Insufficient time allowance (waiting until the last minute) Erroneous or optimistic assumptions about the project Inexperienced cost estimator(s) Failure to consider key factors that can impact cost and schedule Failure to understand the scope and specifications Failure to recognize local practices and cost impacts (market conditions) Inaccurate cost basis for labor, material, and equipment Lack of review cycle by knowledgeable, independent cost estimators Poor quality control Misapplication of markups Quantity and/or pricing errors Common Problems

Best Practices for Cost Estimating Organizations Establish Cost Estimating Processes & Procedures Use AACE International, USACE, or similar Standards Develop and use a Cost Estimating Manual Develop and use a Quality Control Manual Invest in Cost Estimator training and resources Invest in modern “Tools” (software, pricing services, etc.) Use an Independent Consultant for non-routine (large, complex scope, etc.) projects Benchmark and Analyze Results

Best Practices – Cost Estimating Techniques 1 Develop a Work Plan for the Estimate 2 Hold a Kick-Off Meeting with the Team 3 Use a Standard WBS 4 Use the technique appropriate for the cost estimate class 5 Document all Assumptions 6 Use quotes where practical – use a market survey if possible 7 Develop a project schedule 8 Develop a Risk Assessment 9 Perform a Peer/Quality Control/Quality Assurance Review that is documented 10 Document benchmarks and lessons learned

Wrap Up – Take Aways Cost Estimates are Predictions Estimating Techniques should be based on scope maturity, contracting strategy, risk management, and intended use of the estimate Cost estimates include assumptions, a schedule, risk assessment Have a process and follow it. Estimating departments need written procedures and guidelines Allow time for the independent QC step & document the results Benchmark and analyze results Know your limitations and hire an independent consultant when you need one