Quality Management and Statistical Analysis (MGMT 580)

Slides:



Advertisements
Similar presentations
Service Tips April COOLING SYSTEM To check and/or fill the cooling system it is necessary to remove the rear fender, the fuel tank (photo 1) and.
Advertisements

Total Productive Maintenance
Ice. Pure and Simple ™ Welcome to the Ice-O-Matic ® on-line training modules.
Technical support provided by: Highly Pathogenic Avian Influenza Control Programme SOP Use and Maintenance of High Pressure Washer Machine Market chain.
The pumps should be tightened about once a month. If a new pump is installed, the pump should be initially tightened and then re-torqued one week later.
MGMT580 – Quality Management & Statistical Analysis Final Project Josh Murphy.
WP Inc: spray nozzle blues
If you use your computer more than a few hours per day, we suggest you not to turn off your computer at the end of the day. Instead turn off only the.
AUTOMATIC PARTS WASHER: PROBLEM ANALYSIS BEN BROXTERMAN MBA STUDENT SOUTHWESTERN COLLEGE MGMT 580, SUMMER 2012 WP Inc.
© Goodheart-Willcox Co., Inc.  Cooling system diagnosis  Cooling system problems  Thermostat service  Cooling system hose service  Radiator and.
WP Inc. Case STUDY 3.1 Problem Solving Jonathan Stanley & Kari Eddings
Lisa M. Cochran MGMT580PA Quality Management & Statistical Analysis Southwestern College Dr. Michael Corriere 13 June 2012.
Aquariums in the Classroom Developed by the Harbor Branch ACTED staff.
AIR COMPRESSORS & STEAM CLEANERS. Pressurized air is produced by an air compressor. Air compressors are used daily in automotive shops. They are used.
Hydraulics For The Long Term
Accessories Planned Maintenance. Types l Humidifiers l Air Cleaners l Heat Recovery Ventilators l Condensate Pumps.
No Metal Standard diffuse light Salt mixtures Higher than 85 degrees.
No Metal; All Glass aquarium Do not use tap water because it could have metal in it. “ Universal solvent” holds salts in solution chlorine can evaporate.
Case Study 3.1: WP Inc. Problem-Solving
Water and Solubility Write a definition for these words: Solute: Solvent: Solution: Atmospheric water vapour Run-off Transpiration Atmospheric water vapour.
MGMT 580 By Samuel & Adrienne 18 December The problem at hand is the spray nozzles, which frequently clog with particles, causing the parts washer.
Final Project Case Study 3.1 MGMT 580
Domina PLUS B WORKING DIAGRAMS TROUBLESHOOTING INTERNAL VIEWS WIRING DIAGRAMS INSTALLATION 03 PREVIOUS MODEL.
How to make “Touch Free” washing clean better. RYKO Manufacturing Company.
Maintenance of Machine tools
By Ruby Amey Southwestern College of Professional Studies Quality Management & Statistics Dr. Mohamed Elaoudiy March 30, 2013.
WP, Inc. Automatic Parts Washer Brought to you by Candace Hunt, Drew Siebert, Laura Anstine MGMT 580-Quality Management & Statistical Analysis October.
Robert Eickleberry MGMT 580 – Quality Management and Statistical Analysis Date June 14, 2012 Dr. Corriere Southwestern College Professional.
SETA Water treatment plant maintenance
C3 2.3 Water Treatment.
MARINE AQUARIUM TANK BASICS
What tests are necessary to make sure your kegs are being cleaned, sanitized and filled correctly By Andrew J. Brewer
Kirk Baringer Sabrina Hoffman Hanna Spicer. Problem-Solving Steps  Plan 1.Recognize a problem exists 2.Form a quality improvement team 3.Develop performance.
Objectives: Different methods of sanitizing and how to make sure they are effective How and when to clean and sanitize surfaces How to wash items in a.
Engine Performance BASIC MAINTENANCE AND LIGHT REPAIR.
Automotive Heating and Air Conditioning, Fifth Edition By Tom Birch © 2010 Pearson Higher Education, Inc. Pearson Prentice Hall - Upper Saddle River, NJ.
Group 4 MGMT 580 Case Study 3.1 Shawndra Janne. Problem Statement The spray nozzles located in the parts washer are clogging, causing the parts washer.
WP Inc.: Automatic Parts Washer Process Improvement Final Project Summer D. Leifer MGMT580 – Quality Management and Statistical Analysis March 25, 2013.
Case Study 3.1 WP Inc MGMT 580 – Quality Management and Statistics Group 3: Cody Groves, Bruce Kastner, & Heather Moore.
Discover the Dosmatic Difference Trouble Shooting your Dosmatic injector for years of service.
Discover the Dosmatic Difference Maintaining your Dosmatic injector for years of service.
Today… Functions, Cont.: –Designing functions. –Functional Decomposition –Importing our own module –A demo: Functional solution to assignment 2. Winter.
The C.I. Engines Fuel System  The C.I. engine demands that the fuel supplied is –  Timed to inject when the piston is near the end of the compression.
Danielle Gooch MGMT580 – Quality Management & Statistical Analysis January 19, 2012 Dr. Michael Corriere Southwestern College Professional Studies Final.
Control Charts Definition:
“Optimizing Collection System Program Performance
TROUBLESHOOTING GUIDE FOR GAS HOT WATER HEATER
Robot Construction Repairing the Robot.
GROUND SERVICING OF VARIOUS SUB SYSTEMS
MARINE AQUARIUM TANK BASICS
14 Refrigerant Recovery, Recycling, and Recharging.
Instructor Notes Once you have designed a sanitary facility, it is important to keep it that way. If you do not keep the facility and equipment clean and.
Cleaners Only use cleaners that are: Stable Noncorrosive Safe to use
Case sample of a CT option
The Best Way to Keep Your Roof Clean
Make Your Espresso Machine A Better Functioning One
Car Engines Maintenance. 10 tips to keep your car's engine in perfect working order He gets into the car, starts the engine and starts driving where he.
Be Your Own First Customer Fountain
Why Changing The Air Filter Of Your Car Is Very Important?
More About Espresso Machine Repair
Student CD for Commercial Refrigeration for A/C Technicians Chapter 12 Ice Machines.
Diesel Automotive Engines
Instructor Notes Play the “Cleaning and Sanitizing” section from the Facilities, Cleaning and Sanitizing, and Pest Management DVD
Troubleshooting 11/14/2018 Water King Service Seminar.
Service Tips April 2005.
CISC101 Reminders Assn 3 due Friday, this week. Quiz 3 next week.
Changing Oil and an Oil Filter
WP Inc.: Faulty Spray Nozzles
Presentation transcript:

Quality Management and Statistical Analysis (MGMT 580) By Daren Krier February 15, 2015

Case Study 3.1 Introduction WP Inc. manufactures small metal parts Create tools, stamps, bends, and forms based on customer design Deburr parts Wash parts Ship product to customer WP Inc. manufactures small metal parts for their customers based on a design given to them by their customer. The process is made up of four major steps. First, creating tools necessary to manufacture the product, which is the value added process WP Inc. wants to outperform their competition. The next step WP Inc. does to their product is deburr the parts. The third step is washing the parts to remove the oil, dirt, and metal pieces. The last process done at WP Inc. is shipping the product to the customer. Of all the processes completed at WP. Inc, the part washer has been the most troublesome. The nozzles in the part washer are becoming clogged up during part washing, causing a lengthy delay in the process, and potentially causing WP Inc. to miss deliveries to customers.

Process Flow Chart Customer Order Received Creation of tools/necessary components to make product ordered by customer Customer Parts Manufactured Tooling/Components designed to manufacture product The process flow charts shows the sequence of actions necessary to fulfill a customer requirement. Once a customer purchase order is received, the engineers develop tools and other components necessary to manufacture the product. Once that step is completed, the tooling is used on the machines to manufacture the product, followed by the parts being deburred, and then moving to be part washed and shipped to the customer. Parts are deburred Parts washed in part washer/shipped to customer

Problem Statement The part washer sprayers are being plugged up with a substance, causing parts to not be fully cleaned when ran in the part washer. Due to the parts not being washed completely the first time through the process, time is wasted unplugging the part washer sprayers and running the parts through the process a second time.

Brainstorming Employee variance Water temperature Chemical Reactions Sprayers need replaced Too big of pump, therefore pulling debris into the pipes Parts debris (metal shavings) are too big, so part may need rinsed before being placed in washer. Soap substance reacting incorrectly with water Paint chips FOD (foreign object debris) Above are brainstorming ideas of what may be causing the sprayers to be plugged.

Quality Improvement Steps (DMAIC) Plan The problem within the process is the part washer sprayers are plugged with a substance, causing the parts to not be cleaned appropriately each time the part washer is used. Quality improvement team will consist of an engineer, part washer operator, mechanic, and an outside observer within front office (i.e. Program Manager). The improvement plan should decrease the number of times the part washer tank is emptied and cleaned, as well as prevent the sprayers from being plugged.

Quality Improvement Steps (DMAIC) Continued.. Plan (cont.) Sprayers inside the part washer are becoming plugged, causing parts to not be washed correctly. Possible Causes Hard-water buildup Calcium Chips from the parts Paint chips Soap flakes Something caused by a chemical reaction Miscellaneous gravel or dirt (FOD) The possible causes of the sprayers being clogged allow the quality team to develop a plan to study each one of those categories. Hard-water buildup is caused by “high levels of calcium, magnesium, and other alkaline minerals” are found in the water (Howell, 2013). Calcium within the nozzles will more than likely come from the hard-water as well. Chips from the parts may be the cause due to small metal shavings remaining on the part after the machine and deburr. Although paint chips seems unlikely, it is still a possible candidate the group will need to review. Soap flakes are possible due to the multiple times the tank is being emptied and refilled. A chemical reaction may be occurring when the water is heated, causing the soap to create small particles that plug the sprayers. Last, the quality team will check to see if FOD getting into the tank, causing the sprayers to be plugged.

Quality Improvement Steps (DMAIC) Continued (Current Process Flow Map) New soap and water added to tank Water is emptied Yes No Is water dirty? Coils Heat Water No Above is the current process for the part washing machine (Summers, 2010, p. 100). It helps draw a picture to show where certain areas for corrective action can take place in the future. Are parts clean? Part washer turned on Dirty parts placed in machine Parts Run Move to next step Yes Evaporation occurs; water and soap are added

Quality Improvement Steps (DMAIC) Continued.. Do After review of all possible causes, it was determined the nozzles were being plugged with small particles of soap. The tank is filled with soap particles on the bottom of the tank Soap best dissolves at a high temperature No filter system currently exist in system After review of the potential causes, it was determined the substance inside the sprayers is small soap particles. When the water inside the tank is replaced, the bottom of the tank is not cleaned, and when new water is placed in the tank, the soap particles on the bottom of the tank are recycled through the tank. When the soap particles are floating through the tank, the pump is taking in the particles and plugging up the sprayers, causing parts to not be cleaned appropriately.

Quality Improvement Steps (DMAIC) Continued.. Do (Cont.) WP Inc. will begin recording the temperature of water before part washer is ran, confirming water temperature is correct. When the tank is drained, the bottom of the tank will be cleaned to remove soap debris once per week. A filter system will be placed on the pump to remove debris from reaching the sprayers. Preventative maintenance books will be used to record number of cleanings, which sprayers are plugged in the system, how much soap is used when refilling tank, and number of times part washer was used between each tank cleaning, etc. The above actions will take place to help understand the processes necessary to make sure the sprayers do not plug up in the future. First, the temperature of the water will be recorded daily, and the parts will not be run until the temperature reaches the desired degree. Second, when the part washer tank is cleaned, the bottom of the tank will be cleaned once per week. Next, a filter system will be placed on the pump to prevent small debris from entering the pipes/hoses leading to the sprayers. Last, a preventative maintenance book will be placed near the machine to record all maintenance taking place on the machine. The book will record how often the machine is drained and refilled, how often the bottom is cleaned, how much soap is placed in the machine, when/which sprayers were plugged (hopefully sprayers will not be plugged due to corrective actions, but if they are plugged, it will be important to understand which sprayers are plugged), how often the new filter is replaced, and any other maintenance records necessary to keep the part washer running correctly.

Quality Improvement Steps (DMAIC) Continued.. Study and Act The solution to the problem is to record water temperature, record maintenance issues in a preventative maintenance log, train employees, place filter on the pump, and clean the bottom of the tank on a regular basis. The maintenance logs will need reviewed on a regular basis to make sure data is being recorded. To ensure quality of the product, a follow up meeting will be set 1 week from incorporation, and another follow up meeting 1 month after incorporation. If the new process is not working, the reevaluation process will restart and another new process developed By capturing the data associated with the part washer maintenance, continuously improving the process will be easier because a history of the process will be recorded. Based on the history, WP Inc. can decide if they are cleaning the tank too often, not often enough, changing the filter too often, etc.

Hard-Water Buildup/Calcium Cause and Effect Chart Soap Flakes Chemical Reaction Gravel/Dirt (FOD) Too much soap Water too cold? Operator FOD? Hot water reduces reaction Build up on bottom of tank Plugged Sprayer When first starting to develop a cause and effect chart for the reason of plugged sprayers, it was determined six issues may be causing the sprayers to be plugged. As shown above, the six issues each have a chance to get into the pump and cause issues with the sprayer. Other debris on part No water softener Metal Shavings Paint off part washer peeling Hard-Water Buildup/Calcium Chips from parts Paint Chips

Force Field Analysis Driving Forces Restraining Forces Run Product through part washer only once Currently, no filters exist for pump Increase # of cycles before part washer needs cleaned Tools necessary to clean bottom of tank Improve part quality after first run Unfamiliar with new process Actions Record temperature of water when placing parts in washer Install filter on pump to reduce debris in pipes Clean bottom of tank weekly to remove excess soap Record data in preventative maintenance logs Employee training The driving forces for improving the part washing machine is to improve the efficiency of the process. The goal is to run a part through the machine only once, increase the number of cycles before the part washer needs cleaned, and improve quality of the part being cleaned. The restraining forces are limited in this process because most of the necessary adjustments can easily be fixed, it just required training and data. The first restraining force is no filters currently exist for the pump, so a new pump with a filter may be necessary. Second, the employees may need new cleaning tools to clean the bottom of the tank. Last, employees are unfamiliar with the new process, so training will be necessary. The actions necessary to make the process more lean is recording the temperature of the water when the parts run in the machine, install a filter on the pump, clean the bottom of the tank on a regular basis, create a preventative maintenance log book, and employee training on the new process.

Management Summary Record date/time New soap and water added to tank Water is emptied Yes, check filter records/replace Record amount of soap added/Clean bottom of tank 1/week No Is water dirty? Coils Heat Water No, review maintenance log The new process flow map shows the new steps necessary to understand the why the sprayers are being plugged up. By recording data in a preventative maintenance log book, WP Inc. can break down the necessary maintenance into daily, weekly, monthly, and yearly procedures. By understanding this data, it can be determined if different maintenance procedures need to take place more/less often. For example, with a new filter installed, it may not be necessary to change the water once per day, but maybe once per week. The bottom of the tank may not need cleaned once per week, but instead, once per month, therefore saving time and cost associated with cleaning the tank. The important part of the book is it will record all information for the part washer, allowing past data to be reviewed to continuously improve the process. Are parts clean? Part washer turned on Dirty parts placed in machine Parts Run Move to next step Check temp. of water Yes, record data in log Evaporation occurs; water and soap are added

References Howell, E. (2013, March 25). What Makes Water Hard? Retrieved from http://www.livescience.com/34462-water-hard-ph.html. Summer, D. (2010). Quality (5th ed.). Upper Saddle River: Pearson Education, publishing as Prentice Hall.