Bedpan Management System Team: Neal Thomas Faulkner Project Advisor: Dr. John LaCourse Project Completion: May 2013
Purpose Why is this important?
Current Technology Method of Employment Roll patient onto their side Place bedpan underneath Raise patient to a sitting position Wait Roll patient back onto their side Carefully remove bedpan to avoid spills http://www.mountainside-medical.com/product_images/v/184/bariatric-bedpan-steel1__46963_zoom.jpg
Problems with the current system Time Intensive Manpower Intensive Risk of Infection
Time Intensive Requires patient to wait for assistance Procedure takes longer with patients who are injured Hospital staff availability
Manpower Intensive Requires hospital staff at every incident Hospital staff must be present throughout procedure Bedpans need specialized cleaning care Bedpans must be sterilized before each use
Potential Risks for Infection Inadequate cleaning and sterilization Potential contact with waste material for hospital staff Potential contact with waste material for patients Possibility for spills to occur during process
What it is, and how it works. Form and Function What it is, and how it works.
Form Mechanized hospital bed Motor controlled access Alert system Saftey controls triggered by sensor input Input panel for staff use
Software Controls for: Goals: Software Controls for: Patient driven initiation Logic design and timing control Safety control structure and override Hospital staff notification settings Staff input commands to assist in care
Patient Driven Input can be modified to fit requirements Ruduces patient wait time Does not require hospital staff to be availible at the beginning
Logic and Timing Determination for when each action should be taken and in what order Allows for data collection for staff use
Safety Motor resistance Excessive idle time Patient controlled stop function
Notification Automatically on Emergency Events Staff can choose to be notified imediately on system start Options for other further notification will be stored as variables
Staff options Notification settings Data Collection Filtration option Hold option
Project Timeline
Questions?