01 February 2019 Erdenes Mongol Group CEO Gankhuu Purevjav.

Slides:



Advertisements
Similar presentations
HOUSING FOR MIDDLE-LOW J.Aldarjavkhlan. CEO of Mongolian Housing Finance Corporation 2011 INCOME FAMILIES.
Advertisements

MONGOLIA MINING ISSUES SEPTEMBER OYU TOLGOI COPPER\GOLD & SILVER DEPOSIT Location – Gobi Desert, South Gobi province, 100 km from border with China.
Adapting to a Changing Energy Environment Russ Girling, President and CEO, TransCanada Corporation May 15, 2012 STRIKING A BALANCE IN THE MIDST OF CHANGE.
Subsidised Studies – BOOTs and All Mark Berger – Director E+PC Engineering & Projects Company Limited South Africa Canada – South Africa Chamber of Business.
MINERAL SECTOR OF MONGOLIA
Public Private Partnerships in Mongolia
ERDENES TAVAN TOLGOI POWER PLANT PROJECT
Investment Opportunities: Balancing Act Presented by: Dawie Roodt 6 March 2008.
Slide 1 Role of the Auditor General in Extractive Industry Presented By: Anna O. Chifungula.
Sustainable Energy Development-Mongolian Energy Policy and Goals
Regulatory framework in the Energy Sector Chairman Ph.D. Tserenpurev Tudev Energy Regulatory Commission of Mongolia Energy Mongolia-2012 Ulaanbaatar Mongolia.
1 Fiscal Federalism in Iraq: OIL and GAS. The oil situation: a snapshot.
Key Policies Improving Business and Investment Climate Presenter: Governor CBBH: Kemal Kozarić, MA.
Russia in global energy context Remarks at the 11th Annual Global Energy Forum by Yevgeny Zvedre, Science & Technology Attaché Embassy of the Russian Federation.
Coal Jason Zhong Ron Huang. Introduction Coal is a nonrenewable energy source. It’s a combustible black or brownish-black rock composed mostly of carbon.
THE CURRENT STATE OF ENERGY SECTOR IN MONGOLIA, DEVELOPMENT TRENDS
The Nautilus Institute
GOVERNMENT OF MONGOLIA
1 Georgian National Energy and Water Supply Regulatory Commission Tariff Regulation Gocha Shonia Department of Methodology and informational provision.
ACTIVITIES OF SUPPORTING SMES DEVELOPMENT IN VIETNAM
China's banking system has undergone significant changes in the last two decades Banks in china are now functioning more like banks than before China's.
“Support of anti-crisis program of Uzbekistan government to financial sector: In focus leasing market of Uzbekistan ” Mustafaev Z.B. General Director of.
KHOTGOR Rare Earth Elements project South Gobi, Mongolia
E.ON on the Romanian Energy Market ZF Power Summit Bucharest, February 27, 2013 Frank Hajdinjak CEO E.ON România.
INVESTMENT POTENTIAL of the Kemerovo Region KazanSummit 2015 Evgeny Vostrikov, Head of the Kemerovo Region State Public Institution «Investment Raising.
Recent and important work on Trade and Human Development G.Ganjargal – Officer, Trade and Economic Cooperation Department Ministry of Foreign Affairs and.
IAEA, Vienna November 2007 SOME PROSPECTS FOR IMPROVING FINANCING OF DEVELOPMENT OF NUCLEAR POWER INFRASTRUCTURE TECHNICAL WORKSHOP ON THE ISSUES FOR THE.
“Coal Sector Policy Support Programme” This project is funded by the European Union Implemented by Human Dynamics Consortium EU-funded Project: Coal Sector.
Romania - Top Destination for Investments DEPARTMENT FOR INFRASTRUCTURE PROJECTS AND FOREIGN INVESTMENTS.
March, 2008 W.J. Chung Korea Energy Economics Institute North Korea’s Mineral Resources and Inter-Korean Cooperation.
GOVERNMENT of Kazakhstan Mining assets of Samruk-Kazyna
MONGOLIAN MINING SECTOR
Логотип Embassy of the Republic of Kazakhstan Prague
Influence of foreign direct investment on macroeconomic stability Presenter: Governor CBBH: Kemal Kozarić.
Queensland - Overview Population – 4.56 million Land – million square kilometres (just over 3x size of France!) GSP – $A258 billion Capital City.
Natural Resource Partners L.P. A Successful Growth Story UBS Investor Meetings Las Vegas, Nevada September 18, 2007.
1 Pavlodar Region The region is located in the north of the country. As of January 1, 2012, the area is thousand square kilometers, the region's.
Ministry of Mineral Resources and Energy, Fuel Policy Department Director A.Erdenepurev Ulaanbaatar city 2012.
1 LUGANSK REGION, UKRAINE. 2 Луганск Total area – sq.km 4,4% of the territory of Ukraine The border – 776 km land : 642 km water : 134 km Geographical.
THE LONG-TERM ENERGY SUPPLY AND DEMAND OUTLOOK IN TAIWAN ENERGY COMMISSION MINISTRY OF ECONOMIC AFFAIRS AUGUST 2001 MOEA -15-
Public Sector Enterprises In india
Map of Kazakhstan Territory: Territory: 2,7 mln. sq. km. 2,7 mln. sq. km. Population: Population: 16 mln. 16 mln. Religions: Religions: 65%- Muslims, 30%-
Japan and Brazil Economic Outlook Brazilian Development Prospects
MINING AND INFRASTRUCTURE INDABA 2015 ZPC PRESENTATION Presented by: N.F. Gwariro (MD)
Development Bank of Mongolia
Developing Infrastructure to Support the Mining Sector in Mongolia Sustainable Development Week January 25, 2010.
Energy Strategy of Russia for the Year 2030 Oil & Gas Outlook Russia 2009 December, 8, 2009 Moscow Alexey Gromov PhD in Economic Geography Deputy General.
Mr. P. Khurelkhuu, Senior Officer, Ministry of mining, Mongolia Dr. M. Badarch, Director of Mongolian Nature and Environment Consortium B. Ochirsukh, Mongolian.
COAL MINE PROJECT OPPORTUNITY NALAIKH MINE POWER GENERATION AND HEATING PROJECT TSAGAAN SHONKOR HOLDING COMPANY NALAIKH DISTRICT, MONGOLIA OVERVIEW OF.
STATE OF THE HOUSING INDUSTRY PRESENTATION - SOUTH AFRICA J. Mahachi NHBRC February, 2016 IHA Secretariat.
Mongolia-Taiwan Trade and Economic Meeting Taipei, October 2013.
General information on banking sector of Uzbekistan Today 26 banks functioning in the banking sector of Uzbekistan: 3 State commercial banks, 11 Commercial.
Erdeneburen HPP Project Implementation Unit
Energy Regulatory Authority (ERA) of Mongolia Mr.Tumentsogt Tsevegmid, MSc, MPA Regulator, Energy Regulatory Authority University Street 2A, Ulaanbaatar.
1. What would you do with $5,000? Be specific. 2. What percentage of taxes should the government take? 3. Where is the safest place to keep your money?
IAEA International Atomic Energy Agency Sustainable Uranium Resources Development Business Model Canvas for MONGOLIA / MINISTRY OF MINING Presented by.
Challenging Country - Mongolia Presented by Mr. Ts.Yansanjav, Vice Chairman, MNCCI Mongolian National Chamber of Commerce and Industry The main.
Clean Development Mechanism in China Song Yanqin National Coordinator NDRC/UNDP/UNF/ NORAD/IMET Supported Building Capacity for CDM in China Feb 22, 2007.
Mongolian Securities Clearing House and Central Depository Co., Ltd
Operations to Manage Balances in the Treasury Single Account
MONGOLIAN MINING SECTOR
NAA applications in Mongolia
Petrochemical Opportunities
FOREIGN CAPITAL AND PROBLEM OF ENSURING OF NATIONAL ECONOMIC INTERESTS
JSC “UKRAINIAN RAILWAY” (UZ) DEVELOPMENT STRATEGY FOR
MONGOLIA AT A GLANCE Foreign investment friendly legal environment in stable democracy Growth projected to return to double digits by 2020 (World Bank)
THE CURRENT SITUATION OF ENERGY SECTOR
Kuwait – Germany Prospects for Cooperation
Oil & Gas Free Zone, Developing Opportunities For Job Creation
Country Report of the Statistical Center of Iran for Workshop on Integrated Economic Statistics and Informal Sector for ECO Member Countries November.
Presentation transcript:

01 February 2019 Erdenes Mongol Group CEO Gankhuu Purevjav

72% of Foreign Investment Mongolia Economic and Mining Industry Overview 2018 Economic Growth 6.4% Inflation Rate 8.1% Credit Rating B Unemployment 6.9% Mining Industry 22% of GDP 72% of Foreign Investment 74% of Industrial Sector 90% of Export Foreign Trade US$ M Turnover US$12,866.8 Export US$7,011.8 Import US$5,875.0 Balance of Trade US$1,136.8

Strategic Mineral Assets Asgat Silver Ore * 6.4 Mt Buren Khaan Phosphate Ore * 192 Mt Erdenet Copper * 4.1 Mt Mo * 0.012% Boroo Gold * 43 t Gatsuurt Gold * 35 t Tumurtei Iron Ore * 228 Mt Ag Gurvanbulag Uranium * 8,580.3 t P Fe U Mardai Uranium * 1,948.1 t Cu/Mo Au U U Baganuur Lignite * 812 Mt Dornod Uranium * 28,868 t Ulaanbaatar C Shivee Ovoo Lignite * 617 Mt Tumurtein Ovoo Zinc Ore * 0.9 Mt Zn C Tavan Tolgoi Coking Coal * 7.4 Bt Oyu Tolgoi Copper * 44.4 M t Gold * 1,903 t Tsagaan Suvarga Copper/Mo Copper Ore * 10.6 Mt C Cu/Mo Nariin Sukhait Coking Coal 125.5 Mt C Cu/Au Erdenes Mongol will hold licenses and state shareholding in strategic mineral assets

13.3 24.6 IPO (billion tugrik) (billion tugrik) Mining and Heavy Industry Sector - 2018 “Mongol Refinery” state-owned LLC Strategic deposit boundaries The Nariinsukhait, Tavantolgoi, Shivee-Ovoo, Baganuur, Tsagaansuvarga, Burenkhaan and Erdenetiin-Ovoo copper-molybdenum deposit boundaries have been specified. The “Mongol Refinery” was established in accordance to the Government of Mongolia's Resolution No. 92 in 2017. Strategic Deposit Exploration geology “Erdenes-Tavantolgoi” JSC 13.3 2018 “Erdenes-Tavantolgoi” JSC has started its preparations for IPO on foreign and domestic stock exchanges. (billion tugrik) IPO 24.6 (billion tugrik) 43 projects 2019

Foreign currency reserve Mining and Heavy Industry Sector - 2018 Amount of gold submitted to the Central Bank of Mongolia 22 tons The type 92 fuel price has decreased by MNT 100 per liter and in cities and provinces except Bayan-Ölgii, Govi-Altai, Bayankhongor it has decreased by MNT 50 respectively. + $897m Foreign currency reserve Meeting and agreement Oil refinery plant $20-40 per ton The Development Bank has provided MNT 53.1 billion for industrial infrastructure projects. Altanshiree ROSNEFT DORNOGOVI $30m

Mining and Heavy Industry Sector – 2019 Policy And Strategy Geological sector Mining sector Ensure transparency and openness of information in extractive industries, simplify the process for granting exploration licenses and increase funding for geological research in the state budget. Terminate illegal mining operations, improve the governance of state-owned mining enterprises and develop public-private partnerships in mining infrastructure. Oil sector Heavy industry sector Accelerate oil exploration and increase reserves, tighten control over production sharing agreement, improve the supply of oil products and quality control system. Stabilize the heavy industry operations, ensure the implantation of large scale projects and supply domestically manufactured steel products.

Erdenes Mongol Group Structure Erdenes OT LLC Baganuur JSC Largest lignite mine in Mongolia Meets 60% of coal consumption in Mongolia including supply of 70% in the central region Plans to do mine expansion and technical renovation and looks at financing opportunity Shivee Ovoo JSC Second largest lignite mine Meets 20% of steam coal demand for power plants in the central region Mon Atom LLC S Licensee of the largest uranium asset in Mongolia Close proximity to world largest nuclear energy producers Ready to put a pilot processing plant into operation Erdenes Asset Management Make and conduct financial estimates and analysis Invest into projects which meet an appropriate rate of return Plans to obtain a license to operate an investment fund from the Financial Regulatory Commission, Mongolia Erdenes Methane LLC Become a major ecology-oriented energy producer in the region Mine and develop coal-bed methane (CBM) in coal basins in Mongolia Seeks financing for CBM prospecting and exploration Erdenes Shivee Energy Construct an environment-friendly and cost-effective power plant Construct a 5280 MW power plant with State Grid Corporation, PRC Obtain approval for FS from the Minerals Council, Mongolia Erdenes Ashid LLC Run mineral prospecting and exploration (PE) with MAK, Mongolia Erdenes Steel LLC Construct a metallurgical industrial complex with Beren Group, Mongolia Obtain approval for FS from the Minerals Council, Mongolia, in Q1 2019 Erdenes Alt Resource LLC Run gold and silver prospecting and exploration (PE) Mine gold and silver Plans to construct a gold and silver refinery Research Sub-Center Created at the Ministry of Foreign Affairs, Mongolia Assist in implementing the Mongolia-Russia-China Economic Corridor Program s World-class copper mine Government and Rio Tinto partnership Access to China’s market by road and railroad Underground mine be put into operation in 2021 100% 100% state-owned enterprise (SOE) Incorporated in 2007 Government mandat to exercise rights in relation to state-owned shareholding in strategic mineral assets and manage the assets as per Parliament and Government resolutions 100% 75% 90% 100% 100% 100% 50% 34% 100% 100% 34% 34% Oyu Tolgoi LLC Badrakh Energy Badrakh Energy LLC Erdenes Tavan Tolgoi JSC - 2018 Parliament Resolution 73 - 2018 Government Resolution 245 Erdenes Mongol is a whole owner of the Tavan Tolgoi-Gashuun Sukhait heavy-duty road Copper Cu Lignite Uranium U Asset CBM Energy PE Coke Steel Gold Au Research

Financing and Investment Core Business Lines and Financial Summary 2017 Mineral Development Asset Management Financing and Investment Trade and Sales Consulting Government Mandate Total Production Copper Concentrate 1.4 Mt Coal 16 Mt Total Assets US$5.6 B Revenue US$2.5 B * 48% of Total Export Revenue

Strategic Goals Strategy Strategic Goals Hold licenses and state shareholding in strategic mineral assets Implement energy, infrastructure, logistics, and processing industry projects Pursue appropriate asset management, raise and use funds for project finance Implement good corporate governance and promote sustainable development Strategy Become a regionally competitive investment and management company capable of developing minerals efficiently, making optimal long-term investment into mining, energy, and infrastructure industries, and promoting sustainable economic growth Strategic Goals

Financial Plan 2019 Revenue Cost Operating Cost 239-km heavy duty road tolls, subsidiary management fees, and Shivee Ovoo coal license lease make up Erdenes Mongol revenue. Total revenue is expected to account for US$42 million in 2019. The volume of coal to go through the road is expected to reach 23 million tons in 2019 as opposed to 19.2 million tons in 2018. Cost Total cost is expected to account for US$18.8 million in 2019. Total road repair and maintenance cost has grown and is expected to account for US$21.6 million in 2019. Operating Cost Operating cost is expected to reach US$3.31 million in 2019.

Financial Outlook Items 2018 2019 2020 2021 2022 2023 Total Total Production Mt 6.2 7.0 8.7 10.0 11.6 12.0 55.5 Road Construct a 303-km Tavan Tolgoi-Khangi-Mandal paved road   Growth in Group Revenue Construct a 416-km Tavan Tolgoi-Choir road Total Revenue 272.8 405.0 884.1 1,448.9 1,670.9 1,804.2 6,486.0 Total Cost 250.3 272.7 627.3 1,035.5 978.3 992.7 4,156.7 Тaxes 6.4 18.6 41.7 66.2 125.1 149.1 407.1 Gross Profit 15.7 120.3 219.8 359.0 576.7 671.7 1,963.1 Investment 21.0 436.5 545.9 123.9 102.8 84.8 1,315.4

Enterprise Capacity and Commodity Mineral Asset: Oyu Tolgoi (Open-Pit Mine) Commodity: Copper Concentrate Capacity: 0.8-0.9 Mt Market: Export Mineral Assets: Baganuur and Shivee Ovoo Commodity: Lignite Capacity: 6-7 Mt Market: Local power plants Mineral Asset: Tavan Tolgoi Commodity: Coking Coal Capacity: 10-15 Mt Market: Export Mineral Asset: Zuuvch Ovoo and Dulaan Uul Commodity: Radioactive Minerals (Uranium) Capacity: 2,000 t Market: Export Location: Tavan Tolgoi-Gashuun Sukhait Commodity: Toll Road Service for commodity transporters Capacity: 18 Mt

Manage assets properly and raise funding and finance Initial Public Offering (IPO) and Secondary Market Offering (SMO) Manage assets properly and raise funding and finance projects 30% (IPO) 24% (SMO) 39% (SMO) Total Number of Shares Government Shareholding Number of Shares IPO/SMO Expected Revenue Erdenes TT 15,000,000,000 12,750,000,000 (85%) 4,500,000,000 US$3-5 B Baganuur 20,974,360 15,730,770 (75%) 9,870,217 MNT30-35 B Shivee Ovoo 13,419,101 12,077,190 (90%) 10,261,665 MNT40-45 B

Metallurgical Industrial Complex Projects Metallurgical Industrial Complex Develop energy, infrastructure, logistics, and downstream processing industry projects Project Developer: Commodity: Status: Project Financing: Capacity: Erdenes Steel LLC Coke and Steel FS has been developed Up to US$ 320 Million Coke 500,000 t and Steel 300,000 t Gold Refinery Project Developer: Commodity: Status: Erdenes Alt Resource LLC Refined Gold Plans to announce an International Competitive Bidding (ICB) for FS development which will follow in 2019 Shivee Energy Complex for Export Project Developer: Commodity: Status: Project Financing: Capacity: Erdenes Shivee Energy LLC Energy FS has been developed US$7 B 5280 MW 4

Mineral Commodity Exchange Projects Develop energy, infrastructure, logistics, and downstream processing industry projects Mineral Commodity Exchange Project Developer: Goal: Status: Project Financing: Erdenes Mongol Establish a minerals exchange to sell mineral commodities on domestic and foreign markets applying principles of transparency, optimization, efficiency, and market, and set fair prices, develop domestic stock market, and regulate export through integrated policy with a view to implementing the Government Minerals Policy FS is being developed US$10 M 4

Develop strategic deposits and hold government shareholding Projects Develop strategic deposits and hold government shareholding Asgat Silver Asset Development Location: Commodity Technology: Status: Capacity: Nogoon Nuur soum (sub-province), Bayan Ulgii aimag (province) Silver and Copper Underground mining methods will be used in light of factors such as insignificant thickness of the ore body, steep falls, and deep-seated location that can have impacts on extraction FS has been developed but needs updates Plans to start developing the asset 350,000-600,000 t (ore)

Coal-Bed Methane (CBM) Projects Develop energy, infrastructure, logistics, and downstream processing industry projects Coal-Bed Methane (CBM) Project Developer: Commodity: Status: Project Financing: Erdenes Methane LLC CBM FS needs developing US$15 M (prospecting and exploration) End Users: Housing Units, Power Plants, and Others Prospecting and Exploration 2019 CBM pipelines Feasibility Study and Product Sharing Agreement Plant Construction and CBM Extraction Processing and Purification Transportation of Liquefied Gas Opportunity to Export Gas and Liquefied Gas 4

Mine Expansion and Technical Renovation Projects Develop energy, infrastructure, logistics, and downstream processing industry projects Mine Expansion and Technical Renovation Project Developer: Commodity: Status: Project Financing: Capacity: Baganuur JSC Lignite FS has been developed US$178.5 M 8-10.5 Mt Mine Expansion and Technical Renovation Project Developer: Commodity: Status: Project Financing: Capacity: Shivee Ovoo JSC Lignite FS has been developed US$120 M 4.5 Mt 4

Thank you for your attention Erdenes Mongol LLC 15 F, Monnis Tower, Chinggis Avenue 15 Khoroo 1, Sukhbaatar District, Ulaanbaatar 14240 Mongolia Tel: (976) 7555 3399 E-mail: info@erdenesmongol.mn Web page: www.erdenesmongol.mn