SMED ( One Step Setup) A STRATEGY FOR PERFORMANCE EXCELLENCE

Slides:



Advertisements
Similar presentations
Setup reduction / quick changeover
Advertisements

Freeleansite.com The Lean Enterprise Set-up Reduction/ Quick Changeover Lean Foundations Continuous Improvement Training Lean Foundations Continuous Improvement.
Supplier Development Kaizen Implementation Kit
Chapter 3 Planning for Production. Objectives Product oriented manufacturing systems versus people oriented manufacturing systems. Manufacturing smaller.
Lean Manufacturing Cellular Manufacturing One Piece Flow for Workteams
 2000, QualityToolBox.com, LLC, all rights reserved 1 A STRATEGY FOR PERFORMANCE EXCELLENCE.
Lean Systems Defined Just-in-time (JIT): an older name for lean systems Toyota Production System (TPS): another name for lean systems, specifically as.
 2000, QualityToolBox.com, LLC, all rights reserved 1 A STRATEGY FOR PERFORMANCE EXCELLENCE ( One Step Setup) Set-up and changeover reductions for equipment,
Benefits of Lean Manufacturing: To benefit from Lean Manufacturing, the processes must be maintained consistently and correctly. Everyone involved must.
1 Employability skills (a) Employers value people who: fit well into their team and workplace use initiative to solve routine problems work productively.
© ABSL Power Solutions 2007 © STM Quality Limited STM Quality Limited Introduction to Lean Manufacturing TOTAL QUALITY MANAGEMENT Lean Manufacturing.
SETUP IMPROVEMENT. Setup: Definition The setup includes everything, all elements and time from the last good piece of the previous job until the first.
How to Effectively Implement Set-up Reduction in Any Organization.
Copyright © 2014 McGraw-Hill Higher Education. All rights reserved. CHAPTER 8 Lean Systems McGraw-Hill/Irwin.
Setup Reduction Module
 2000, QualityToolBox.com, LLC, all rights reserved A STRATEGY FOR PERFORMANCE EXCELLENCE.
Introduction to Lean1 LSSG Green Belt Training Lean: An Introduction.
Workshop A Performance Boosting Tools Reality Check: Are you a Lean, Mean Manufacturing Machine ? The Matrix: Performance Measurement System.
Quick Changeovers & SMED
1 Employability skills (a) Employers value people who: fit well into their team and workplace use initiative to solve routine problems work productively.
WASTE REDUCTION AND PRODUCTIVITY IMPROVEMENT
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 15 JIT and Lean Operations.
Lean Basics Dewey Warden.
LEAN system.
JIT and Lean Operations
XYZ Company 1. XYZ Company 2 Lean Manufacturing Is a way of life. It is a never ending process…… Its tools need to tailored to meet XYZ Company’s needs.
Kanban/Pull System As Part of the Continuous Improvement Process at Whirlpool Corporation - Findlay.
©2005 Rucker & Associates, Inc. All Rights Reserved. 1 LeanSigma Transformation Overview.
Quick Changeover Basics This material is provided by Industrial Solutions, Inc. and is intended for internal use only. Any reproduction or re-use outside.
Single Minute Exchange of Die OR Quick Changeover
Lean Manufacturing Chapter 15 pp June 29, 2012.
McGraw-Hill/Irwin © 2003 The McGraw-Hill Companies, Inc., All Rights Reserved. 1 LEAN SYSTEMS TOOLS AND PROCEDURES.
“Without the Cost of Waste …”
Lean Six Sigma An Introduction to Process Improvement.
1 Employability skills (a) Employers value people who: fit well into their team and workplace use initiative to solve routine problems work productively.
Process Characteristics
 Discussion 40 minutes  Break 10 minutes  Discussion 40 minutes  Will understand what Standard Work is, and is not  Will be able to study and understand.
LEAN system. Value That customer is willing to pay That changes products color, function, shape, other attributes so that the product is getting closer.
Standard Work (Sample Slides) Superfactory Manufacturing Excellence Series Lean Overview 5S & Visual Factory Cellular Manufacturing Jidoka Kaizen Poka.
Lean Manufacturing TT4290 L4S2. History of Manufacturing (1) Craft Manufacturing (2) Mass Manufacturing (3) Lean Manufacturing.
LEAN Basics for Offices January 13, WHAT IS “LEAN”? Maximize customer value while minimizing waste.
Measure Phase Wrap Up and Action Items. Measure Phase Overview - The Goal The goal of the Measure Phase is to: Define, explore and classify “X” variables.
LESSON 4 Process Improvement – Lean
Mel Wendell – Mountain Pointe High School
Lean Manufacturing Series
SMED ( One Step Setup) A STRATEGY FOR PERFORMANCE EXCELLENCE
Quick Changeover Single Minute Exchange of Dies
IENG 451 / 452 Jidoka: Reliability, Quality, Poke Yoke
Lean Manufacturing Basic Overview XYZ Company.
A STRATEGY FOR PERFORMANCE EXCELLENCE
Pull Manufacturing and Just In Time
Lean Manufacturing and Just-In-Time Philosophy
LEAN ORGANIZATION SUMMARY
Welcome to my presentation
Total Productive Maintenance and Quick Changeover
A STRATEGY FOR PERFORMANCE EXCELLENCE
SMED ( One Step Setup) A STRATEGY FOR PERFORMANCE EXCELLENCE
Chap 10 Learning Objectives
A STRATEGY FOR PERFORMANCE EXCELLENCE
Quick Changeovers Definitions Analysis and Methods GEOP 4316.
Mistake Proofing & Poka-yoke
A STRATEGY FOR PERFORMANCE EXCELLENCE
Quick Changeover Techniques
A STRATEGY FOR PERFORMANCE EXCELLENCE
Production Preparation Process (3P)
Measure Phase Wrap Up and Action Items
Quick Set-Up Technique
A STRATEGY FOR PERFORMANCE EXCELLENCE
LEAN PRODUCTION BY Alfredo Moran Johnny Rojas January, 2006.
Presentation transcript:

SMED ( One Step Setup) A STRATEGY FOR PERFORMANCE EXCELLENCE Set-up and changeover reductions for equipment, tooling and machines. Single Minute Exchange of Dies is a “Process” focused on reducing waste through the reduction of setup processes associated with Equipment, Machines, Tooling. It is a continual improvement process focused on incremental improvement driving towards a “ On Step Setup Operation” We use One Step Setup to confer that the goal for setup operations should be a One Step Process taking less than a few minutes. A STRATEGY FOR PERFORMANCE EXCELLENCE

Performance Excellence Series Training Module Elements Executive Overview Knowledge Breakthrough Tools Workbook Lecture notes Lecture notes Single Minute Exchange of Dies is a “Process” focused on reducing waste through the reduction of setup processes associated with Equipment, Machines, Tooling. It is a continual improvement process focused on incremental improvement driving towards a “ On Step Setup Operation” We use One Step Setup to confer that the goal for setup operations should be a One Step Process taking less than a few minutes. Participant manual

Knowledge Breakthrough Table of Contents Knowledge Breakthrough SMED Session 1.0 Introduction…….……...…………………... 4 Session 2.0 Waste Management ………………………. 12 Session 3.0 Setup Practices…………………………….. 22 Session 4.0 Traditional /Strategic Setup Approach…… 29 Session 5.0 SMED Implementation Planning…………. 34 Element 5.1 Implementation Team……………………… 36 Element 5.2 Implementation Plan………………………. 37 Element 5.3 Communication Plan………………………. 38 Element 5.4 Training Plan………………………………. 40 Element 5.5 One Step Setup…………………………….. 42 Element 5.5.1 Separate Internal from External Setup…… 44 Element 5.5.2 Integrating Internal into External Setup…. 49 Element 5.5.3 Reducing Setup Processing Time…………. 63 Element 5.5.4 Optimizing Setup Processes……………….. 92 Element 5.6 Verification & Standardization…………… 95 Session 6.0 Summary…………………………………… 105 5 S is a continual improvement process. It isn’t complete once you perform the 5 initial steps- this is known as “active 5S”. In fact, this is the beginning point for the next two applications of 5S: Making 5S a Habit and Preventive 5S.

SMED is Continuous Improvement It is a customer driven requirement. Customers are demanding: Product and service diversity Lower costs Higher reliability and quality. In essence organizations need to become leaner ! So organizations must: Produce smaller lots, more frequently. Expand the scope and diversity of products and services. Reduce quality defects. One Step Setup ( SMED) is a critical success factor required for an organizations growth and profitability! With an effecti8ve SMED program in place, companies will reduce waste associated with excess motion, excess inventories, excess waiting times, excess transportation, process waste, waste associated with defects. The result ----- A more flexible organization which can produce smaller and more diversified lots of products and services, at lower costs, without inventory buildups and with zero defects! Hence, on time deliveries, in the right quantity,at competitive costs.

Meet Customer’s Expectations ! Ultimately, SMED focuses on reducing changeover and set-up times, thus enabling organizations to: Produce smaller lots of products and services more frequently ! Develop a broader scope of products and services ! Reduce quality defects towards zero ! One Step Setup results in customer service. Meet Customer’s Expectations !

What Does Set-up/changeover reduction mean for my business? Increased customer service levels and profits ! Via Waste Elimination resulting in: Reduced Lead Times-Faster Delivery Zero Inventories-Reduced Working Capital Improved Quality Improved Safety Smaller lots of products-flexibility Diversified Product & Service Options The ultimate deliverable of SMED is to increase service levels and profits ! It does this by the elimination of the wastes noted earlier. The only reason were in business is to make money ( profits) we do this by satisfying the customer, and we satisfy the customer by providing the “right product and service” at the “right time” at the “correct quantities”.

Why SMED ? Look Familiar? To eliminate the wastes that result from The primary focus of SMED is the elimination of wastes in the work environment that result from unorganized, unclean material, tools, machines, associated with setup/changeover processes. To eliminate the wastes that result from “uncontrolled” processes increasing inventories and lead times.. To gain control on equipment, material & inventory. Apply Control Techniques to Eliminate Erosion of Improvements. Standardize Improvements for Maintenance of Critical Set-up Parameters.

Tool Kit Comparison 5S 4 4 Elimination waste Major CPI Tools (6s) Kaizen Lean Description Cp/Cpk 4 Process capability assessment DOE 4 Design of experiments SPC 4 Process control based on statistics and data analysis FMEA 4 Risk assessment tool Regression 4 Correlate effect one variable has on another Process Map 4 4 4 Map process steps to communicate and identify opportunities 5 whys /2 hows 4 4 4 Determination methods for root cause discovery Pareto 4 4 4 Column chart ranking items highest to lowest Fishbone 4 4 4 Cause / Effect Diagram 5S 4 4 Elimination waste Visual Mgmt 4 4 4 Emphasis on visual techniques to manage process Poka-Yoke 4 4 Error proofing techniques Spaghetti Chart 4 4 Kanban 4 4 Material storage technique used to control process Takt Time 4 4 Determine pace or beat of a process Std Work 4 4 Evaluate tasks done during a process SMED 4 4 Single minute exchange of dies - Quick machine set up TPM 4 Integrate maintenance strategy with process Cellular Flow 4 Reduce inventory & cycle time through process layout and pull production techniques This matrix is extremely important in understanding the relationship of Kaizen, Six Sigma, and Lean- site manufacturing. Notice that many of the continual improvement tools are common amongst the three programs. In essence it is important to note that Lean-site Manufacturing is really a deliverable of Kaizen ( when employed completely and correctly). It is also important here to recognize where SMED fits into the equation. SMED focuses on the elimination of wastes, so it is common and required for successful completion of Kaizen and Lean-site initiatives. Expand Process Improvement Program to Utilize Kaizen Tool Kit

Identify what types of internal and external setup times are involved in the following pictures. Picture A: Wire Cutting Machine Picture B: Metal Stamping Machine Have the group form in pairs and identify the types of inside/outside setup operations required for these types of machines. As part of the exercise, have them list an approximate setup time for each of the setup operations identified.

Identify what types of internal and external setup & times are involved in the following pictures. Picture A: Wire Cutting Machine Picture B: Metal Stamping Machine Think Break ________________________________________________________________________________________________________________________________________________________________________________________________________________________ Setup Type Time ( Min) ________________________________________________________________________________________________________________________________________________________________________________________________________________________________ Setup Type Time ( Min) Have the group form in pairs and identify the types of inside/outside setup operations required for these types of machines. As part of the exercise, have them list an approximate setup time for each of the setup operations identified.

Internal External Setup Think Break Classify Three items under each item category. Internal External ____________________________________ ____________________________________ Which items would you convert from internal to external Setup ? ________________________________________________________________________________________________________ Why? ________________________________________________________________________________________________________ Have the group do this individually and give them about 10 minutes to complete this exercise. Lead a discussion on why items were put into each category and why the items were chosen to be discarded.

Traditional Setup Practices Material movement occurs after the machine is turned off. Completed products are transferred to next operation. Raw material is moved after the machine is stopped. Detection of defects or missing equipment is noticed which the machine is running. Setup tooling delivered after the changeover has begun. Defective product identified after internal setup has begun. Defective tooling,fixtures, setup instruments are noticed after the machine is turned on. The operator notices that equipment is missing after internal setup has begun.

5 “Traditional”Setup Steps Defined Preparation - Ensures that all the tools are working properly and are in the right location. Mounting & Extraction - Involves the removal of the tooling after the production lot is completed and the placement of the new tooling before the next production lot. Establishing Control Settings - Setting all the process control settings prior to the production run. Inclusive of calibrations and measurements needed to make the machine, tooling operate effectively. First Run Capability - This includes the necessary adjustments( re-calibrations, additional measurements) required after the first trial pieces are produced. Setup Improvement- The time after processing during which the tooling, machinery is cleaned, identified, and tested for functionality prior to storage.

“Traditional”Setup Resource Consumption Analysis

Examples of wastes in a traditional setup ! Think Break What kind of “setup wastes” can you identify in this pictures ? ________________________________________________________________________________________________________________________________________________________________________ Have the group identify the types of waste associated with the setup/changeover operations for these two machines. How would an improved setup process eliminate or reduce these waste ?

Progressive Enhancements One Step Setup Implementation Plan Step 1 Develop One Step Setup Implementation Team Step 2 Develop Specific Implementation Plan Step 3 Develop Communication Plan Step 4 Develop One Step Setup Training Plan Step 5 Implement One Step Set-up Separate Internal from External Setup Progressive Enhancements Reduction of Setup Processes Listed above is the implementation plan for a 5S program. Each step is explained on the upcoming slides. Optimizing Setup Processes Integrate Internal into External Setup Step 6 Verification / Standardization

Combining equipment functionality Phase 2 Combining equipment functionality Involves standardizing the equipment ( parts, tooling, processes) based on commonality between setups to reduce the number of setup steps and cycle times. The common setup parts were identified and replaced with this jig/holder combination. By using these fixtures, the parts are automatically centered and adjusted for height and flatness as a part of External setup-not Internal setup. Notice how different quantities of the same part can be setup with the same fixture. Also, these setups can occur while the machine is running.

Waste associated with finding, replacing, motion will be eliminated by this example of visual placement. Tooling supplies are clearly labeled Tooling supplies are neatly assigned a unique location.

Elimination of Bolts & Adjustments. Phase 3: Reducing setup processing time. Elimination of Bolts & Adjustments. Example of One Step Fastening Bolt attachments requires 32 complete turns for each bolt or screw (1 for each thread) to fasten this bolt and die to a machine. This clamp attachment requires one step to attach the die to a machine.