Push-pull cryo configuration C

Slides:



Advertisements
Similar presentations
Vertex Detector: Engineering Issues Craig Buttar University of Glasgow Cambridge GLDC meeting Sept 07.
Advertisements

19th – 20th of September 2007Cryogenic Expert Meeting at GSI, Jan Patrick Meier1/11 Cryogenic Experts Meeting at GSI, 2007 The SIS 100 Cryogenic Jumper.
4.1/9.1m L* Optics & Performance Glen White, SLAC SiD Meeting, SLAC Jan 13, 2015.
Global Design Effort Goals and Introduction Andrei Seryi, SLAC, September 17, 2007.
Large Platforms For Push-pull Hitoshi Yamamoto 18-Sep-2007 IRENG07.
Summary of wg2a (BDS and IR) Deepa Angal-Kalinin, Shigeru Kuroda, Andrei Seryi October 21, 2005.
Global Design Effort Detector concept # Plenary introductory talk IRENG07 Name September 17, 2007.
Crab cavity location for 2-mrad x-ing December 7, 2004 A.S.
1 4 Oct 05 Optimization of anti-DID for SiD, GLD and LDC A.Seryi October 4, 2005.
1 27 Sep 05 Discussion of anti-DID ( “DIDNT” ? ) A.Seryi September 27, 2005.
3/2011 CFS BTR Global Design Effort 1 Americas Region Civil Design Tom Lackowski.
Experimental hall in Japanese mountain site Y. Sugimoto ILD MDI/Integration 1.
Push Pull Considerations
September 21 - November 6, 2006 Global Design Effort 1 Technical evaluation of push-pull September 21 - November 6, 2006 Draft to be presented by A.Seryi.
November 07, 2006 Global Design Effort 1 Beam Delivery System updates BDS Area leaders Deepa Angal-Kalinin, Hitoshi Yamamoto, Andrei Seryi Valencia GDE.
1 FD Support and Pacman for GLDc 27 Aug Yasuhiro Sugimoto KEK.
Experimental hall in Japanese mountain site Y. Sugimoto 1.
Global Design Effort Push-pull studies How to proceed LCWS07 June 1, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi.
February 4, 2007 Global Design Effort 1. February 4, 07 Global Design Effort IR&MDI: 2 Contents Will describe design of Beam Delivery System, focusing.
Level 1.5 Processing Updates Martin Bates, RAL GIST th December, 2005.
MEG DC (report June 04) DC report june_04,J.E. a)Foil stability and quench related problems b)How to get more stability c)Frame design d)Measurement of.
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
September 18, 2007H. J. Krebs1 SiD Collaboration One Piece End Door Design Concept plus Forward Equipment Interfaces H. James Krebs SLAC September 18,
Date Event Global Design Effort 1 ILC UPDATE Vancouver to Valencia Ewan Paterson Personal Report to SiD Collaboration Oct 27, 2006.
How to Sew a Button Step by Step Instructions. Thread the Needle For buttons, you should double the thread to make the job quicker. Pull it through the.
Global Design Effort ILC Crab Cavity Overview and requirements Andrei Seryi SLAC on behalf of ILC Beam Delivery and Crab-Cavity design teams Joint BNL/US-LARP/CARE-HHH.
1 SiD Push-pull Plans Marco Oriunno, SLAC International Workshop on Linear Colliders 2010 Geneva, October 2010 M.Oriunno, IWLC10 – Geneva, Oct.2010.
10/02/2011 Global Design Effort 1 Positron Source meeting J. Clarke, D. Angal-Kalinin, N. Collomb.
9/17/07IRENG071 Cryogenic System for the ILC IR Magnets QD0 and QF1 K. C. Wu - BNL.
Global Design Effort Magnetic and Mechanical FEA of SiD IRENG07 Bob Wands September 18, 2007.
An Hybrid QD0 for SID ? Marco Oriunno (SLAC), Nov. 14, 2013 LCWS13, TOKYO.
Electron cloud in Final Doublet IRENG07) ILC Interaction Region Engineering Design Workshop (IRENG07) September 17-21, 2007, SLAC Lanfa Wang.
COMPENSATION OF DETECTOR SOLENOID FIELD WITH L*=4.1M Glen White, SLAC April 20, 2015 ALCW2015, KEK, Japan.
SiD MDI Issues Tom Markiewicz/SLAC Beijing ACFA/GDE Meeting 05 February 2007.
1 W.Ootani ICEPP, University of Tokyo MEG experiment review meeting Feb , PSI W.Ootani ICEPP, University of Tokyo MEG experiment review meeting.
Haixin Huang AGS Cold Snake: Status and Plans.
Preliminary Result on L*=1.5m CEPC Interaction Region Yiwei Wang, Dou Wang, Sha Bai Yingshun Zhu, Teng Yue CEPC acc. meeting, 5 September 2014.
8/29/07K. C. Wu - Brookhaven National Lab1 Major Components in ILC IR Hall Interchangeable Detectors.
MEA Machine and Experiment Assembly Norbert Meyners, MEA 12. July 2007ILC IRENG07 WG-A1 LDC Engineering Design (Status) Introduction General Design Detector.
Integration Prototype1 BaBar Integration as a Prototype for SuperB Bill Wisniewski SuperB Workshop at LNF 6 April 2011.
Baseline BDS Design Updates Glen White, SLAC Sept. 4, 2014 Ichinoseki, MDI/CFS Meeting.
M Sullivan SuperB Workshop Elba, Italy May 31 - Jun 3, 2008
ILC Interaction Region and Machine Detector Interface
BDS Cryogenic System RDR Status and EDR Plans
Anti-did and B-field for ILD
Extract from: Minimal BDS and other thoughts
NAT / PAT.
Clubs Formation U11 age group.
Vacuum chamber for the CMS forward region
Changes to SiD since the DBD
ILC Baseline BDS Collimation Depth Calculations
SHMS Downstream Beamline Large SHMS/HMS Angles (Config-1)
Updates on IR and FF for super-B factory
NAT / PAT.
The 2mrad horizontal crossing angle IR layout for the ILC
SiD IR Layout M. Breidenbach, P. Burrows, T. Markiewicz
Extract from today’s talk given to DCB
TTC Hot Topic Common Questions
First look at final focus part of super-B factory
S3: Drifting Continents
Final Focus optics for Possible New B-Line
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Studies of crossing angle and SR effects for CLIC TENTATIVE
Computer Basics Picture Review.
Proposal for quadrupole families
IR Beam Transport Status
Presentation transcript:

Push-pull cryo configuration C Optimized for fast switch of detectors in push-pull and fast opening on beamline QD0 part QF1 part This scheme require lengthening L* to 4.5m and increase of the inner FD drift Opening of detectors on the beamline (for quick fixes) may need to be limited to a smaller opening than what could be done in off-beamline position door central part Sep 21-Nov 6, 06 Global Design Effort

Detector sizes & opening on beamline SiD (opened) GLD Since opening of detectors on the beamline is intended only for quick fixes, the required width for opening may be smaller that for opening off-beamline 2m Sep 21-Nov 6, 06 Global Design Effort

Standard FD with L*=3.51m End of warm drift is extended only by 0.3m outside of largest detector in its closed position. Space may be not sufficient even without detector opening on the beamline. (Shown are ideal magnet positions, but due to warm-cold transitions, magnets take more space). Sep 21-Nov 6, 06 Global Design Effort

FD with L*=4.5m End of warm drift is extended by 1.3m outside of largest detector in its closed position. Possible opening on beamline is less than 0.8m for GLD. Sep 21-Nov 6, 06 Global Design Effort

FD with L*=4.5m & lengthened warm drift section by +0.7m Detector opened on beamline (GLD opening reduced to 1.5m) still leaves 0.5m of not-overlapped space for config.C Sep 21-Nov 6, 06 Global Design Effort