SDP-lead Interfaces Summary

Slides:



Advertisements
Similar presentations
SKAMP Square Kilometre Array Molonglo Prototype. Supporting Institutions  University of Sydney  Argus Technologies  ATNF  ICT Centre.
Advertisements

Object Specific Compressed Sensing by minimizing a weighted L2-norm A. Mahalanobis.
1 NGAO Instrumentation Studies Overview By Sean Adkins November 14, 2006.
Prototype SKA Technologies at Molonglo: 3. Beamformer and Correlator J.D. Bunton Telecommunications and Industrial Physics, CSIRO. Australia. Correlator.
Dominion Radio Astrophysical Observatory DVA-1 Reflector Development Timeline Gary Hovey NRC-HIA Dominion Radio Astrophysical Observaotry.
This work is licensed under a Creative Commons Attribution 3.0 Unported LicenseCreative Commons Attribution 3.0 Unported License (CC-BY). Project Management.
Technical Performance Measures Module Space Systems Engineering, version 1.0 SOURCE INFORMATION: The material contained in this lecture was developed.
1 Australian Newspapers Digitisation Program Development of the Newspapers Content Management System Rose Holley – ANDP Manager ANPlan/ANDP Workshop, 28.
SKA Pre Construction Phase Infrastructure Tracy Cheetham Carel van der Merwe General Manager: Infra & Site OpsInfrastructure System Engineer
EVLA Computing Overview Gareth Hunt EVLA Advisory Committee 2002 June
INFRA:DISH = DISH INFRA: LFAA = LFAA INFRA:SDP = SDP INFRA:CSP = CSP INFRA:SADT = SADT INFRA:MGR = MGR INFRA:AIV = No IF? Infra ICD Leads.
VDIF (VLBI Data Interchange Format) as a common data format in e-VLBI era. M. Sekido (NICT) M.Kettenis(ATNF), C.Phillips(JIVE), A.Whitney(MIT/Haystack),
1 The OSKAR Simulator (Version 2!) AAVP Workshop, ASTRON, 15 th December 2011 Fred Dulwich, Ben Mort, Stef Salvini.
MWA Data Capture and Archiving Dave Pallot MWA Conference Melbourne Australia 7 th December 2011.
CRISP & SKA WP19 Status. Overview Staffing SKA Preconstruction phase Tiered Data Delivery Infrastructure Prototype deployment.
Linking Tasks, Data, and Architecture Doug Nebert AR-09-01A May 2010.
RTF Measure Life Guidelines Subcommittee Meeting 31 January 2012 Discussion Materials / SERA.
EE400D DOCUMENTATION INSTRUCTIONAL SERIES CRITICAL DESIGN REVIEW.
14 June, 2004 EVLA Overall Design Subsystems II Tom Morgan 1 EVLA Overall Software Design Final Internal Review Subsystems II by Tom Morgan.
SKA Interface Workshop: AIV Interfaces – Summary and Wrap AIV consortium Manchester June 2013.
SKAO Power Update 2015 Engineering Meeting: Penticton Adriaan Schutte
M.P. RupenEVLA Advisory Committee Meeting September 6-7, Correlator Test Plan Michael P. Rupen.
EVLA Monitor & Control Software PDR Status. May 15, 2002EVLA Monitor & Control Software PDR Bill Sahr 2 Requirements, Schedule Requirements (High Level,
Large Facilities Manual New Guidance on Cost Estimating and Analysis 2016 NSF Large Facilities Workshop Kevin Porter Large Facilities Advisor, LFO, NSF.
SKA Central Signal Processor Architecture SKA CSP LMC Peer Review 11.April, 2016, Madrid Sonja Vrcic SKA CSP LMC Sub-element Lead.
Metadata for the SKA - Niruj Mohan Ramanujam, NCRA.
Engineering Commissioning May 2016 SKA1 LOW – Assembly, Integration & Verification Adam MacLeod AIV Consortium Manager & ASKAP System Engineer.
SAGE meeting Socorro, May 22-23, 2007 WIDAR Correlator Overview Michael P. Rupen Project Scientist for WIDAR & Software.
Insert Poster Content Here. Authors are permitted to submit three slides per accepted poster, with one additional slide at the end for contact details.
SKA Status – Tango Collaboration Meeting Lize van den Heever June 2016.
The Science Data Processor and Regional Centre Overview Paul Alexander UK Science Director the SKA Organisation Leader the Science Data Processor Consortium.
Computer Organization
Cryoplant Controls Installation
Jean Baptiste Joseph Fourier
Instrument Teams to SOC Test Specifications
Scope Planning.
Chapter 11 Designing Inputs, Outputs, and Controls.
The UniBoard Generic Hardware for Radio Astronomy Signal Processing
Sizing With Function Points
Project Integration Management
Computing Architecture
Lawrence Livermore National Laboratory
Visible-Surface Detection Methods
IIS for Image Processing
PM view of SAFe SAFe Construction Planning Workshop A J Casson
SKA Element Interface Management Workshop CSP Element
JIVE UniBoard Correlator (JUC) Firmware
An Empirical Study of Web Interface Design on Small Display Devices
STEP 8 - CLOSING PHASE: TRANSITION SUPPORT
Antenna Monitor & Control Subsystem Engineering Requirements
COCOMO Model Basic.
GBT Proposal Specifics
HLRF Web Application User Manual v 1.0 Jan
Systems Analysis and Design in a Changing World, 6th Edition
Hydrologic Responses to Draught in the Barton Creek Segment of the Edwards Aquifer Peter Carlson.
Grant Hampson and John Bunton
SADT Overall Summary Total ICD count is currently 37 system level ICDs across 6 Elements LFAA 3 ICDs DISHES 7 ICDs CSP 12 ICDs TM ? Unable to proceed.
Cluster Validity For supervised classification we have a variety of measures to evaluate how good our model is Accuracy, precision, recall For cluster.
Mark McKinnon EVLA Project Manager
Progress on EXPreS at JBO Ralph Spencer
Illumination and Shading
SDLC Phases Systems Design.
SDP Interface Identification
Infrastructure Interface – Power, cooling & building
Software Effort Estimation
<Your Team # > Your Team Name Here
Requirements “Content Guide”
Measuring the Similarity of Rhythmic Patterns
Correlation Coefficient
Case Study: Choosing an Exercise Mode in a Heart Rate Monitor
Presentation transcript:

SDP-lead Interfaces Summary Bojan Nikolic & Albert-Jan Boonstra

SDP – Telescope Manager Two interfaces: M&C and Metadata Complex – will need to retain flexibility right into operations phase ConOps and detailed use cases are essential inputs to generate scope. Begin by estimating: flexibility requirements and constraints on data flow rates, latencies Operator interface provided by MGR But, screens to be available for direct display of visibility, image data from SDP Unlikely to make significant progress before T0+12w Have outline ICD defining protocols at PDR, but details of control points, data fields required etc only to be determined at CDR and after.

SDP-CSP, SDP lead Contact SDP: Albert-Jan Boonstra, CSP: Brent Carlson Interfaces: visibilities, processed pulsar dat /NIP (XML/FITS/TBD, small volume data) beamformed data to SDP (commissioning, VDIF-TDB) direct access data to SDP (commissioning, CSP input buffer) Metadata Who calculates (u,v,w, weight) RFI flagging/excision, in- and post correlation, overflow flagging, bit pattern Phase/delay models, configuration: via TM, only (u,v,w), NIP data directly Phase slope corrections, depends on RFI flagging: SDP (ingest) Plan At T0: list of interfaces as input to further disussion At T0+12 / SRR: content definition At PdR: ICD under revision control Questions: Beamformer coefficients – computed by CSP or SDP? Averaging, to which extent at CSP vs SDP ingest (reducing data transport power) phasing-phase noise requirement needed