P AIRPORT SURFACE DATALINK

Slides:



Advertisements
Similar presentations
EUROCAE WG 73: UAS integration Elements for the European Commission UAS panel Presentation at Workshop 2 UAS insertion into airspace Gérard Mardiné (SAFRAN-Sagem)
Advertisements

Unmanned Aircraft Systems EUROCONTROL ATM Integration
Future Communications Infrastructure – An update
Overview of the interoperability Regulation
1 Glenn Research Center ICAO ACP Working Group M Iridium Sub Group Overview Bob Kerczewski Mike Meza NASA Glenn Research Center Iridium AGC-FG and NexSAT-SG.
P AIRPORT SURFACE DATALINK ICAO WG-S 3 ICAO Montreal, 09/07/2013.
ESA Iris Programme: status
The European Organisation for the Safety of Air Navigation WG-I #16 Meeting SESAR Security Tasks SpeakerLiviu POPESCU on behalf of Boleslaw GASZTYCH.
EUROCAE WG82: Airport Data Link System ACP WGW3 IP 8 Montreal, January 2010.
PETAL A major step Towards Cooperative Air Traffic Services Patrice BEHIER Manager of the Air/ground Co operative ATS Programme Directorate Infrastructure,
12 and 13 February 2013 WELCOME TO THE SESAR LIVE SWIM DEMONSTRATION.
ICAO ACP WG S meeting 14th, 15th July 2014
Enav.it Session 3 Steps towards the SESAR deployment and the ATM system modernisation.
AeroMACS SARPS Validation Report from SESAR Project 9.16 Sixth Meeting of the Surface Datalink Working Group Sendai, November 13 th -14 th, 2014 Domenico.
SESAR Single European Sky Air traffic management Research
David Bowen Head of ATM Operations and Systems
The ICAO Standardization Process. 2 Introduction Not going to attempt an introduction to ICAO Nor all its documentation ICAO produces international standards.
Rev. 0 CONFIDENTIAL Mod.19 02/00 Rev.2 Mobile Terminals S.p.A. Trieste Author: M.Fragiacomo, D.Protti, M.Torelli 31 Project Idea Feasibility.
1 EUROCAE EUROCAE Dedicated to Aviation Standardisation ASAS Standards: “From concept to equipment” David Bowen (Technical Secretary) April 24 th 2007.
3rd ASAS TN Workshop 19 April – 21 April rd ASAS TN Workshop Session 4: Strategy and Implementation Package I Requirements Focus Group (“Rapid.
Nigel Makins EUROCONTROL
Required Total System Performance (RTSP) Bernard Miaillier EUROCONTROL Agenda Item 3 EUROCONTROL.
1 reTHINK Deliverables, How To Read reThink deliverables quick starter.
Seeking SC Feedback on Draft Technology Strategy and Roadmap for EarthCube Draft of 3 November 2015 The Technology and Architecture Committee (TAC) Chairs:
Federal Aviation Administration Data Communications Program FAA Prototype & Validation Activities Presented to:Data Comm Implementation Team By:Craig Morris.
ASAS TN Session 4 summary Billy Josefsson, LFV Rob Ruigrok, NLR.
A consolidated starting point from DFS / AENA / LFV ASAS Thematic Network Workshop Toulouse, Is ASAS /ADS-B needed for ANSP strategy?
10 Dec 15 COMMUNICATIONS PANEL (CP) WORKING GROUP I (WG-I) Montreal, QC Canada January 2016 AEEC IPS Update (Prepared by Luc Emberger, Greg Saccone)
European Commission 1 Interoperability of Air Traffic Management systems for the Single European Sky.
WORKING GROUP I (WG-I) AEEC IPS Update
AeroMACS Status SESAR Project Airbus update
Jim McEachern Senior Technology Consultant ATIS July 8, 2015.
ESA Iris Programme: status
ESA Iris Programme workplan of activities
ICAO Seminar on Aeronautical spectrum management (Cairo, 7 – 17 June 2006) SAFIRE Spectrum and Frequency Information Resource (presented by Eurocontrol)
Juan Vázquez Sanz EUROCONTROL SRU
AIXM 5.1 – Interoperability issues
VDL 2 capacity simulations
Shift2Rail Info Day Call for Proposals 2017
Presented by United Arab Emirates
International Cooperation
Technical cooperation challenges
ISO/IEC Software Testing
SIP/2012/ASBU/Nairobi-WP/7
TechStambha PMP Certification Training
Task 5.2 INERTIA Simulation Test Suite TECNALIA Joseba Jimeno
AIXM 5.1 – Interoperability issues
Presented at ICAO ACP WG-I By Robin Hughes
Task 5.2 INERTIA Simulation Test Suite TECNALIA Joseba Jimeno
International Civil Aviation Organization
WG-I #16 Meeting SESAR Security Tasks
WP1 INERTIA Framework Requirements, Specifications and Architecture
Future Communications Infrastructure – An update
ICAO Seminar on Aeronautical spectrum management (Cairo, 7 – 17 June 2006) SAFIRE Spectrum and Frequency Information Resource (presented by Eurocontrol)
AIXM 5.1 – Interoperability issues
International Federation of Air Traffic Safety Electronics Associations IFATSEA European Regional Meeting 2016 Update ICB by Robert Schneebauer 17.
AeroMACS SARPS Validation Report from SESAR Project 9.16
VDL 2 capacity simulations
Smart Grids activities in ETSI
Joint FAA/Eurocontrol Future Communications Study (FCS)
AIXM 5.1 – Interoperability issues
March 2009 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Liaison Review to IEEE of: ISO JTC1/SC31/WG5.
Soren Dissing - EUROCONTROL
PSS verification and validation
The ETSI Standardisation Process
International Civil Aviation Organization
AIXM 5.1 – Interoperability issues
International Civil Aviation Organization
ICAO ACP Working Group M Iridium Sub Group Overview
WG2 ADAS report – May Marseille
Presentation transcript:

P.15.02.07 AIRPORT SURFACE DATALINK ICAO WG-S 3 P.15.02.07 AIRPORT SURFACE DATALINK ICAO Montreal, 09/07/2013

DISCLAIMER This presentation is created by INDRA and is based on ©SESAR JOINT UNDERTAKING material developed within the frame of the SESAR Programme, co-financed by the EU and EUROCONTROL. The opinions expressed herein reflect the author’s view only. The SESAR Joint Undertaking is not liable for the use of any of the information included herein. Reprint of information included herein with approval of publisher and with reference to source code only

AGENDA 01 Introduction to P15.02.07 02 Achievements 03 Project status – Closed activities 04 Project status – Ongoing activities

PROJECT SCOPE OVERVIEW 01 INTRODUCTION TO P.15.02.07 PROJECT SCOPE OVERVIEW P.15.02.07 Airport Surface Datalink T01 Overall IEEE 802.16e/aero System Analysis & Design (Lead EUROCONTROL) T02 Channel models and propagation analysis (Lead NATMIG) T03 IEEE 802.16e/aero profile (Lead EUROCONTROL) T04 Development & Integration Analysis (Lead AENA) T05 System Implementation (Lead SELEX ES) T06 Integration and Testing (Lead THALES) T07 Standardization and Global Interoperability (Lead EUROCONTROL) T08 Security and Safety Analysis (Lead DSNA) Management (Lead INDRA) T09 “The project aims at defining, validating and demonstrating a technical profile and architecture for a new generation of airport surface data link system” PROJECT MEMBERS AENA, AIRBUS, DSNA, EUROCONTROL, INDRA, NATMIG, SELEX ES, THALES

02 ACHIEVEMENTS ACHIEVEMENTS Project has substantially contributed to the joint (EUROCAE and RTCA) development of the AeroMACS profile based on mobile WiMAX standard Extensive simulations have been carried out to validate the AeroMACS profile AeroMACS ground prototypes/mock-ups testbed platforms developed. Testbed will support laboratory and airport tests within the integration and testing activities Hardware prototypes are delivered to further validate the profile and confirm the simulation results and support both laboratory and Toulouse airport tests AeroMACS system implementation document delivered, including Ground Prototypes Description and Verification Objectives and Verification Strategy that supports the Integration and Testing activities Support to standardisation bodies for AeroMACS profile standardisation: Eurocae WG-82, RTCA SC-223, ICAO WG-S and Wimax Forum (AWG) Ongoing coordination with US/FAA

PROJECT STATUS – CLOSED ACTIVITIES T01 Overall IEEE 802.16e/aero System Analysis & Design Status: Completed 23/11/2010 T02 Channel models and propagation analysis Status: Completed 01/07/2011 T03 IEEE 802.16e/aero Profile Status: Completed 11/11/2011 T04 Deployment & Integration Analysis Status: Completed 21/09/2012 T05 System Implementation Status: Completed: 31/05/2013

PROJECT STATUS – ONGOING ACTIVITIES WA6 Integration and Testing (I) Description: T006 Integration and lab testing - Phase 1: The main goal of this activity is the design and implementation of a testbed platform encompassing the functionalities of specified 802.16e/aero profile This task will enable the project to progress from SESAR simulated datalink and SW based scenarios towards HW datalink proofs Tests on Thales and Selex BS prototypes will be performed in Laboratory covering Phase 1 Verification Objectives described in D05.2 Deliverable T010 Integration and testing - Phase 2: Continuation of Phase 1 Integration and testing, Phase 2 will plan, execute and report the set of mandatory Verification Objectives, notably the ones with Thales prototype at Toulouse airport, and the testing of interoperability on air interface

PROJECT STATUS – ONGOING ACTIVITIES WA6 Integration and Testing (II) Description: T011 Additional Phase 2 testing - lab and Toulouse airport: Continuation of Phase 2 testing, this task will plan, execute and report the set of optional Verification Objectives described in the Verification Strategy The task covers both testing in laboratories and in real environment (Toulouse airport) The consolidated report will serve as input to refining the AeroMACS profile produced under WA3 T012 Final prototype Availability – Selex/Thales: This task will produce the Availability Note of the manufacturer's prototypes, revisited once the testings are completed.

PROJECT STATUS – ONGOING ACTIVITIES WA6 Integration and Testing (III) Progress: Verification Plan (VP) for Phase 1 testing: first draft issued for P.15.02.07 internal review Verification Report (VR) Phase 1 : internal draft Thales and Selex Laboratory Tests: ongoing Toulouse Airport test: anticipated with DSNA (even if now planned in 2014), first site survey already occurred in 2012, new meeting for details confirmation under preparation Airport testing planning: 9.16 Airport testbed integrated and ready:      26/07/2013 15.2.7 Airport testbed integrated and ready:    18/03/2014

PROJECT STATUS – ONGOING ACTIVITIES T07 Standardization and Global Interoperability Planning: Actual forecast date: 04/02/2014 Progress: Open Consultation Process for the AeroMACS MOPS just completed – publication is expected by end of year Draft MASPS available - completion planned by end of year WMF documents (AeroMACS PICS and CRSLv1.2) under finalisation for submission to WMF available Draft SARPS available Support to EUROCAE WG82, RTCA SC223, ICAO ACP WGS, Wimax Forum AWG

PROJECT STATUS – ONGOING ACTIVITIES T08 Security and Safety Analysis Planning: Actual forecast date: 04/02/2014 Progress: AeroMACS Safety and Performance Analysis: internal draft AeroMACS Security Analysis: internal draft for review

THANK YOU FOR YOUR ATTENTION ANY QUESTIONS?

15.2.7 Project Manager: Hyung Woo Kim SD ATM & Airports SESAR Programme hkim@indra.es San Fernando Business Park – Kenia bldg. Avenida de Castilla 2, 28830. San Fernando de Henares, Madrid. España T +34 91 627 37 71 www.indracompany.com