GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test One and Two Tower Integration Readiness Review.
Advertisements

GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 3.31 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
GLAST LAT Project I&T Integration Kickoff Meeting 03/09/04 Online 1 GLAST Large Area Telescope: I&T Integration Kickoff Meeting EGSE Hardware March 9th,
GLAST LAT ProjectLAT I&T Subsystem CDR, March 28, 2003 Document: LAT-PR Section 4 - Page 1 GLAST Large Area Telescope: I & T Peer Review Performance.
GLAST LAT ProjectLAT Engineering Meeting, April 1, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren S. Marsh Stanford Linear Accelerator.
GLAST LAT ProjectNovember 04, 2005 Phase 0 TRR 1 GLAST Large Area Telescope: Integration and Test -Electrical Test- Phase 0 TRR Key Requirements Documents.
GLAST Large Area Telescope - OperationsDOE Review, 15 June GLAST Large Area Telescope Operations Review Rob Cameron Instrument Science Operations.
GLAST LAT ProjectI&T&C Particle Beams - Pre PDR Presentation– Oct. 2, 2001 Gary Godfrey1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS
GLAST LAT Project 1 Tracker “mini-tower” Full Size Calorimeter module Face to Face IDT meeting March 20, 2002 Convener: E. do Couto e Silva Engineering.
GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 Martin Nordby1 Martin Nordby Stanford Linear Accelerator Center Stanford University.
GLAST LAT ProjectEGSE Peer Design Review, August 17, S. WilliamsEGSE Schedule and Cost Electrical Ground Support Equipment Schedule and Cost Scott.
GLAST LAT Project July 19, 2005 E. do Couto e Silva 1/17 Science Verification Analysis and Calibration GLAST Large Area Telescope Eduardo do Couto e Silva.
GLAST LAT Project Analysis Meeting March 22, 2004 E. do Couto e Silva 1/8 LAT Instrument Test Analysis Eduardo do Couto e Silva March 23, 2004.
GLAST LAT Project Quarterly Review, Aug. 14, 2001 Gunther Haller1 GLAST Large Area Telescope: Electronics, DAQ & Flight Software Gunther Haller Stanford.
GLAST LAT ProjectSLAC Pre - Baseline Review, April 16, 2002 ` 1 GLAST Large Area Telescope: I&T Overview WBS: Elliott D. Bloom Stanford Linear Accelerator.
GLAST LAT ProjectTest Planning Meeting Aug 2, 2004 E. do Couto e Silva 1/6 SVAC EM2 Goals Develop distributions for E2E tests that involve comparison of.
GLAST LAT ProjectJune Cost/Schedule Status Meeting 07/23/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to June Cost/Schedule.
GLAST LAT Project SE Test Planning meeting October 4, 2004 E. do Couto e Silva 1/13 SVAC Data Taking during LAT SLAC Oct 4, 2004 Eduardo.
GLAST LAT ProjectDOE/NASA Status Review, March 30 & 31, 2004 Integration and Test 1 Integration, Facilities, Configuration, and Test (IFCT) Flow Procedure.
GLAST LAT ProjectLAT Planning Meeting July 17 th and 18 th Integration and Test 1 GLAST Large Area Telescope: I & T Input to LAT Planning Meeting.
GLAST Large Area Telescope - OperationsDOE Review, 15 June GLAST Large Area Telescope Operations Review Rob Cameron Instrument Science Operations.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test One and Two Tower Integration Readiness Review.
GLAST LAT Project Analysis Meeting April 22, 2004 E. do Couto e Silva 1/5 SVAC Status SVAC Status Eduardo do Couto e Silva April 22, 2004.
High Bay Operations1 GLAST LAT ProjectMarch 2005 LAT Engineering Meeting 14 March March 2005 LAT High Bay Operations Supporting Test Events LAT.
GLAST LAT ProjectI&T PDR – Jan. 9, 2002 Gary Godfrey1 Integration and Test Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
GLAST Large Area Telescope:
GLAST LAT ProjectIntegration and Test CDR Peer Review, March 28, 2003 Document: LAT-PR Section 8 - Page 1 GLAST Large Area Telescope: I & T Peer.
GLAST LAT ProjectI&T PDR Presentation – Jan. 9, 2002 R. Claus1 Integration and Test Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist WBS
GLAST LAT ProjectEGSE Peer Design Review, August 17, S. WilliamsEGSE Overview Electrical Ground Support Equipment Overview Scott Williams Stanford.
GLAST LAT ProjectI&T&C Pre PDR, October 2, 2001 E. do Couto e Silva1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
GLAST LAT ProjectI&T PDR Presentation (IFCT Dept.) – January 9, 2002 Larry Wai Integration and Test Organization Chart I&T Manager Elliott Bloom WBS
GLAST LAT Project ISOC Peer Review - March 2, 2004 Document: LAT-PR Section 6.2 Visualization Tools 1 Gamma-ray Large Area Space Telescope GLAST.
GLAST LAT ProjectFace to Face Managers Meeting 04/14/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Face to Face Managers.
GLAST LAT Project – Cost and Schedule ReviewJanuary 27, 2004 AntiCoincidence Detector 1 GLAST Large Area Telescope: Cost/Schedule Review January 27, 2005.
1 Stepping in everyone’s toes ( but for a good cause….) Eduardo do Couto e Silva Software Meeting – January 2001.
GLAST LAT ProjectSeptember 15, 2006: Pre-Shipment Review 1 Integration and Test Presentation 11 of 12 GLAST Large Area Telescope: LAT Pre-Shipment Review.
GLAST LAT Project LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering Manager
GLAST LAT ProjectI&T&C Pre PDR Presentation – Oct 2, 2001 B. Grist1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, 2001 E. Bloom1 Elliott Bloom Integration and Test and Calibration Manager
GLAST LAT ProjectDOE/NASA Baseline-Preliminary Design Review, January 8, 2002 Document: #1 GLAST Large Area Telescope: I&T Overview Elliott D. Bloom Stanford.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct 2, 2001 Darren Marsh1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
GLAST LAT ProjectFace to Face, 14 April 2004 LAT System Engineering 1 GLAST Large Area Telescope: EGSE and Interface Verification Pat Hascall SLAC System.
GLAST LAT ProjectMini-Review, 30 January 2003 LAT-PR-#####-## 1 I & T Responsibility LAT I&T, Verification, and Calibration Flow VibeRandom vibrate/sine.
GLAST LAT ProjectSLAC Internal Review, April 16-18, 2002 LAT-PR Electronics and Flight Software WBS GLAST Large Area Telescope: Electronics,
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test Two Tower Integration Readiness Review SVAC Elliott.
EMI/EMC GLAST Large Area Telescope LAT Pre-Shipment Review
GLAST Large Area Telescope:
GLAST Large Area Telescope Instrument Science Operations Center
I&T&C Organization Chart
GLAST Large Area Telescope:
GLAST Large Area Telescope:
LAT Requirements Verification in TVAC
0.0 Instrument Suite Name Presenter’s name
Electrical Ground Support Equipment Verification Test Support
Integration, Test, and Calibration
GLAST Large Area Telescope:
GLAST Large Area Telescope: I&T Integration Kickoff Meeting
GLAST Large Area Telescope Instrument Science Operations Center
Integration and Test Organization Chart
GLAST Large Area Telescope:
GLAST Large Area Telescope:
Integration and Test Organization Chart
GLAST Large Area Telescope
Mini Tower Preliminary Results
LAT Environmental Test Planning and Design Review
Introduction and Overview
Integration & Test Instrument Operations Coordination
GLAST Large Area Telescope: I&T Test Readiness Review
GLAST Large Area Telescope: Deputy for Systems Engineering
Presentation transcript:

Integration and Test Organization Chart I&T Manager Elliott Bloom WBS 4.1.9 I&T Engineer B. Grist WBS 4.1.9.1 Reliability & QA D. Marsh WBS 4.1.9.2 Instrument Operations Coordinator S. Williams Mechanical Ground Support Equipment TBD Online Manager R. Claus Integration, Facilities, Configuration, and Test L. Wai Particle Test Manager G. Godfrey Environmental Test Manager M. Lovellette Science Verification, Analysis, and Calibration E. do Couto e Silva I&T Preparation 4.1.9.3 EM1 Model I&T Calibration Unit I&T 4.1.9.4 Flight LAT I&T 4.1.9.6 Mission I&T Support 4.1.9.7 I&T Preparation 4.1.9.3 EM1 Model I&T Calibration Unit I&T 4.1.9.4 Flight LAT I&T 4.1.9.6 Mission I&T Support 4.1.9.7 I&T Preparation 4.1.9.3 Flight LAT I&T 4.1.9.6 Mission I&T Support 4.1.9.7 I&T Preparation 4.1.9.3 EM1 Model I&T Calibration Unit I&T 4.1.9.4 Flight LAT I&T 4.1.9.6 Mission I&T Support 4.1.9.7

Integration and Test Activities I & T “subsystem” is focal point of LAT integration activities I & T team plans and manages activities. TKR, CAL, and ACD subsystem teams provide support for Integration & Calibration. Total effort involves: I & T Subsystem LAT integration planning and management. Mechanical integration and GSE and EGSE development. Plan environmental tests and execute. Plan particle beam tests and execute. Calibration particle beam and test equipment development. Calibration analysis software development. Ground verification and calibration of LAT. Ground science verification of LAT. Phase A commissioning of LAT in orbit -- deliver a working instrument to IOC.

Particle Beam Sources Cosmics rays on the ground All individual towers and the full LAT Van de Graff (17.6 MeV g) EM tower + 4 towers of CU + only known energy g into full LAT SLAC End Station A positrons Four tower calibration unit Calibrate energy response SLAC End Station A photons Verify MC simulation to measure PSFs and effective areas SLAC End Station A protons Verify MC simulation to measure proton rejection Cosmic rays in airplane (25,000 - 35,000 feet) Full LAT end-to-end test.

Science Verification, Analysis and Calibration (SVAC) System Science Requirement Document (GLAST-00010) LAT Performance Specifications (LAT-SP-00010-1) LAT Verification Plan (LAT-TBD) Calibration Requirements (LAT-TBD) SVAC Plan (LAT-TBD) Science Verification Data Analysis Calibration

Related Integration and Test Activities Mechanical Systems Environmental test support. LAT qualification testing analysis. Electronics Subsystem LAT electrical integration. Performance test planning and execution. Flight software verification testing. IOC subsystem LAT performance test planning. EGSE, and GSE operations and support during LAT I&T. Phase B Commissioning of LAT on Orbit -- Calibration. Science Analysis Software Subsystem Science Analysis Software support -- event reconstruction.

EGSE Division of Responsibility GLAST Mission Coordinate with spacecraft vendor EGSE. LAT Coordinate EGSE flow across subsystems. ELECTRONICS EGSE hardware (except for workstation) & front end software. I&T EGSE workstation, workstation software and support. I&T test, analysis, visualization, and script software. SAS LAT event reconstruction software. IOC Ultimate customer. Mission LAT SAS I&T Elect. IOC ONLINE

Integration Planning Activities LAT integration planning Planning for subsystem integration has been included in development of interfaces and LAT design integration Developing concepts for integration EGSE and GSE. LAT integration facilities New clean room facilities have been built and commissioned at SLAC for GLAST Facilities include I&T infrastructure Clean room with high bay Storage for flight hardware Environmental Tests LAT thermal tests at SLAC. Full suite of environmental tests at NRL. Observatory integration support I&T team has been involved with mission in investigating options for observatory integration. LAT and observatory require combined EGSE, GSE and coordinated plans environmental test plans. Concept of LAT Integration Frame

Integration and Test Facility at SLAC

Integration and Test Subsystem Work Breakdown 4.1.9.1 I & T Management Coordinate I & T planning Develop LAT I & T plan, to ensure flow of verification test activities 4.1.9.2 Reliability and Quality Assurance Collect subsystem verification test results Manage LAT verification test assurance activities 4.1.9.3 I & T Preparation - Integration-Facilities-Configuration-Test, Particle Test, Environmental Test, Science Verification Analysis & Calibration. Prepare LAT I & T facilities Develop calibration equipment Develop particle test plan Develop environmental test plan Develop Calibration plan

Integration and Test Subsystem Work Breakdown - 2 EM1 Model I&T&C- Integration-Facilities-Configuration-Test, Particle Test, Environmental Test, Science Verification Analysis & Calibration. Coordinate I&T tests with subsystem tests. Use subsystem calibration data to tune up I&T calibration program. Run cosmic rays on “assembled” EM1-EM2 unit at SLAC. 4.1.9.4 Calibration Unit I & T -Integration-Facilities-Configuration-Test, Particle Test, Environmental Test, Science Verification Analysis & Calibration. Prepare and integrate for Calibration qual and flight modules. Prepare for and test CU with cosmic rays, Van de Graff, positron, photon, and hadron beams. Produce LAT calibration products for SAS from CU beam data. 4.1.9.6 Flight LAT I&T- Integration-Facilities-Configuration-Test, Particle Test, Environmental Test, Science Verification Analysis & Calibration. Prepare for integration of flight LAT; fabricate and test all mechanical GSE Mechanically integrate flight LAT Plan for and execute environmental verification testing Support planning and execution of Observatory I&T

Produce a Working Instrument! Integration and Test Subsystem Work Breakdown - 3 4.1.9.7 Mission I&T Support- Integration-Facilities-Configuration-Test, Particle Test, Environmental Test, Science Verification Analysis & Calibration. Produce a Working Instrument!