Agenda for the internal review (09/05/12 1-5p 311 Newman)

Slides:



Advertisements
Similar presentations
Peter McIntosh STFC and Cockcroft Institute CI SAC Review 1 – 2 November 2010 SRF and RF Activities.
Advertisements

Overview Interfaces Planning.  One PC to control 2 cavities in one cryo-module  Standard PLC and hardware components  Expected PLC cycle time 2ms.
VRVS, Jan. 2006CERN AB-ATB1 Safety Review Solenoid & Cryogenics CERN AB-ATB VRVS session, Jan
RF Unit Test Facility at NML & CM1 Test Plan Bob Kephart Fermilab IWLC-10 October 20, 2010.
Report from WG 3: Cryomodules (design & integration, construction, assembly) V.Parma, CERN, TE-MSC With contributions from O.Capatina, CERN, EN-MME 2nd.
Internal Cryomodule Instrumentation Sensors, Actuators, Heaters, and Wiring ERL Main Linac Cryomodule 9/5/2012 Peter Quigley Internal Design Review.
Alignment and assembling of the cryomodule Yun He, James Sears, Matthias Liepe MLC external review October 03, 2012.
SPL cryo-module conceptual design review Cavity, helium vessel and tuner assembly N. Valverde, G. Arnau, S. Atieh, I. Aviles, O. Capatina, M. Esposito,
Discussion on Studies at Test Stands Roger Ruber Uppsala University.
SRF Results and Requirements Internal MLC Review Matthias Liepe1.
1.3 GHz FNAL Dressed Cavity S-1 Global Deliverable to KEK 7 July 2009.
Heat load study of cryomodule in STF
Stress and cool-down analysis of the cryomodule Yun He MLC external review October 03, 2012.
Internal Cryomodule Instrumentation ERL Main Linac Cryomodule 10/10/2015 Peter Quigley, MLC Design Review.
Detail discussion of S1 Global at STF H. Hayano (KEK) GDE Mar 3-6, 2008.
STF plan overview H. Hayano, KEK LCPAC 02/25/2005.
E. KAKO (KEK) 2011' May 15 S1-Global Test 1 Fact Test Schedule of S1-Global Cryomodule (June, 2010 – Feb. 2011)
Cryomodule prototype Yun He, Dan Sabol, Joe Conway On behalf of Matthias Liepe, Eric Smith, James Sears, Peter Quigley, Tim O’Connell, Ralf Eichhorn, Georg.
RF Development for ESS Roger Ruber and Volker Ziemann Uppsala Universitet 4 Dec Dec-20091RR+VZ: ESS RF Development.
1Matthias LiepeAugust 2, 2007 Future Options Matthias Liepe.
Date 2007/Oct./23 FNAL-GDE-Meeting Global Design Effort 1 Cryomodule Interface Definition (FNAL-GDE-Meeting) N. Ohuchi.
1 WELCOME D I S A S T E R C H A P L A I N S 1 Welcome & Course Overview NYDIS Training Curriculum Module 1.
Cryomodule prototype Yun He, Dan Sabol, Joe Conway On behalf of Matthias Liepe, Eric Smith, James Sears, Peter Quigley, Tim O’Connell, Ralf Eichhorn, Georg.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
1 S1Global Experiment Writeup Outlining WIP A N.Toge +
CRYOGENICS FOR MLC Cryogenic Principle of the Module Eric Smith External Review of MLC October 03, October 2012Cryogenics for MLC1.
Alignment and assembling of the cryomodule Yun He, James Sears, Matthias Liepe.
LHC Cryostat evaluation Nikolay Solyak Thanks Rama Calaga, Tom Peterson, Slava Yakovlev, Ivan Gonin C11 workshop. FNAL, Oct 27-28, 2008.
MAIN LINAC CRYOMODULE DESIGN REVIEW INPUT COUPLER September 5, 2012V. Veshcherevich.
Detail plan of S1-Global H. Hayano (KEK),
Overview of Main Linac Cryomodule (MLC)
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
SPL cryomodule specification meeting, CERN 19th October 2010 SPL cryomodule specification: Goals of the meeting SPL cryomodule specification: Goals of.
Overview of Main Linac Cryomodule (MLC) Yun HE MLC Internal Review 9/5/2012Yun HE, MLC Internal Review1.
LCLS-II Prototype Cryomodule Vacuum Vessel and HGRP Tom Peterson 4 December 2014 Design Review.
Visiting DESY for S1-G module Norihito Ohuchi 2009/8/251 19th Biweekly Webex meeting (S1-G, Cryomodule, Cryogenics)
Ralf Eichhorn CLASSE, Cornell University. I will not talk about: Cavities (Nick and Sam did this) HOM absorbers (did that yesterday) Power couplers (see.
Ralf Eichhorn Cornell on behalf of Paul Bishop, Benjamin Bullock, Brian Clasby, Holly Conklin, Joe Conway, Brendan Elmore, Fumio Furuta, Andriy Ganshyn,
ILC : Type IV Cryomodule Design Meeting Main cryogenic issues, L. Tavian, AT-ACR C ryostat issues, V.Parma, AT-CRI CERN, January 2006.
Shuichi NoguchiTTC Meeting at Milano, Injector Cryomodule for cERL at KEK Cavity 2 Prototypes were tested. Input Coupler 2 Couplers were tested.
ESS Cryomodule Status Meeting – Introduction | | Christine Darve Introduction to Cryomodules for the ESS 2013 January, 9 th Christine Darve.
Crab Cavity Technical Coordination meeting:
S1G Experiment Schedule Plan
CERN – Zanon discussions
Cryomodule test stand at ESS site
Stress and cool-down analysis of the cryomodule
Brad Schoenrock Advisors Dave Meidlinger Matthias Liepe
WP5 Elliptical cavities
at STFC Daresbury laboratory
Meeting for S1-Global module design Cryomodule and Cryogenics
TTC Topical Workshop - CW SRF, Cornell 12th – 14th June 2013
Tuner system Zhenghui MI 2017/01/17
Sensors in the S1-G Cryomodules (Updated )
Overview MESA SRF system and machine design
ESS RF Development at Uppsala University
UK RFD Pre-Series cryomodule
XFEL cavities and cryomodules measurements at AMTF
ERL Main-Linac Cryomodule
HIE-LINAC status report
Summary of the checking items of the Module-C design
التعامل مع ضغوطات العمل إعداد وتقديم إقبال المطيري
IHEP ILC Cavity Status Jiyuan Zhai (IHEP)
© 2004 – 2011 PAVAC Industries Inc. All rights reserved
FRIB summary of performance degradation - VTA to cryomodule
Cryomodules Challenges for PERLE
CEPC-650MHz Cavity Cryomodule
If your time was: Your wpm are: Your wpm are: 1: 3: 1: 3: 1: 3: 3: 1:
ERL Director’s Review Main Linac
Tom Peterson, Fermilab 6 December 2011
Facility for Research Instrumentation and Accelerator Development
Presentation transcript:

Agenda for the internal review (09/05/12 1-5p 311 Newman)   Purpose of the internal, external review and project obj. (Georg), 15 min Cryomodule overview (Yun), 5 min SRF results and requirements (Matthias), 10 min Ancillary systems (coupler, tuner) (Vadim, Matthias), 10 min HOM loads (Ralf), 5 min Cryogenic principle of the module (Eric), 15 min Mechanical design, choice of material, production steps (Yun, 30 min) Stress and cool-down analysis (Yun, 10 min) Alignment, WPM (Yun), 5 min Instrumentation (Peter), 5 min Safety requirements and regulations (James), 10 min Schedule (Tim), 10 min Discussion, 30 min Agenda preparation for the external review, 15 min Total time scheduled: 2 h 55 min Proposition: not more than 5 min discussion, I break (15 min) at 2:30p