High Level Physics Applications for LCLS Commissioning

Slides:



Advertisements
Similar presentations
Christopher Gerth, Michael Röhrs, Holger Schlarb DESY Hamburg Optics for Diagnostic Section BC1 in the European XFEL.
Advertisements

J. Rudolph, Helmholtz-Zentrum Berlin EuCARD 2nd ANNUAL MEETING Slice emittance measurements at the ELBE superconducting RF photoinjector.
Diagnostics and commissioning on ERLP Yuri Saveliev ASTeC CONFORM Project: EMMA Design Review Workshop February 2007, Daresbury Laboratory.
Paul Emma LCLS FAC April 16, Initial Experience with Injector Commissioning P. Emma, et al. Facilities Advisory Committee.
Patrick Krejcik LCLS April 16-17, 2007 Breakout Session: Controls Controls Commissioning Experience.
P. Emma, SLACLCLS Commissioning – Sep. 22, 2004 Linac Commissioning P. Emma LCLS Commissioning Workshop, SLAC Sep , 2004 LCLS.
Hamid Shoaee High Level Physics 20 April 2006 High Level Physics Applications Update on Plans, New Directions Fairley,
P. Emma, SLACLCLS FAC Meeting - April 29, 2004 Linac Physics, Diagnostics, and Commissioning Strategy P. Emma LCLS FAC Meeting April 29, 2004 LCLS.
Henrik Loos Applications for 11 November 2008 SLAC National Accelerator Laboratory New High-Level Applications for 2009 Henrik.
Diane Fairley High Level October 24-28, 2005 High Level Physics Applications LCLS Week / FAC October 24-28, 2005.
1 Heinz-Dieter Nuhn 1 BFW Results June 2009 FAC BFW Results Heinz-Dieter Nuhn – LCLS Undulator Group Leader June 9, 2009.
Hamid Shoaee LCLS FAC Review – October Control System Overview Hamid Shoaee Controls System Manager Injector control system commissioning & Support.
Henrik Loos High Level 17 June 2008 High Level Physics Applications for LCLS Commissioning Henrik Loos.
Diane Fairley High Level October High Level Applications FAC Review October 12, 2006 High Level Applications.
David H. Dowell Injector Physics/Diagnostics/Gun&L0 RF April 29-30, 2004 Injector Physics / Diagnostics / Gun & L0 Linac.
Influence of the Third Harmonic Module on the Beam Size Maria Kuhn University of Hamburg Bachelor Thesis Presentation.
SPPS, Beam stability and pulse-to-pulse jitter Patrick Krejcik For the SPPS collaboration Zeuthen Workshop on Start-to-End Simulations of X-ray FEL’s August.
Henrik Loos LCLS 6 February 2009 SLAC National Accelerator Laboratory High Level Physics Applications for LCLS Commissioning.
1 Henrik Loos 1 13 Sep 2011 APE Meeting Recent Activities H. Loos 09/13/2011.
1 Franz-Josef Decker 1 Multi-Bunch Operation for LCLS Franz-Josef Decker March 17, Definitions and goals multi-bunch within.
1 Alternative Bunch Compressor 30 th Sep KNU Eun-San Kim.
… Work in progress at CTF3 … Davide Gamba 01 July 2013 Study and Implementation of L INEAR F EEDBACK T OOLS for machine study and operation.
Franz-Josef Decker 14-Dec-2011 CSR is a big deal limiting performance Tolerance studies beforehand helped a lot Tor’s List Software adaptability helped.
What did we learn from TTF1 FEL? P. Castro (DESY).
8 th February 2006 Freddy Poirier ILC-LET workshop 1 Freddy Poirier DESY ILC-LET Workshop Dispersion Free Steering in the ILC using MERLIN.
Frank Stulle, ILC LET Beam Dynamics Meeting CLIC Main Beam RTML - Overview - Comparison to ILC RTML - Status / Outlook.
LCLS Commissioning & Operations High Level Software
Beam Commissioning Adam Bartnik.
Feng Zhou LCLS-II AP meeting 02/23/2017
Slice Parameter Measurements at the SwissFEL Injector Test Facility
LCLS Commissioning & Operations High Level Software
Thermal emittance measurement Gun Spectrometer
WG2 Summary: Diagnostics, measurements, and commissioning
Work Update J. Rzepiela 8/17/10.
Cornell Injector Performance
LCLS Linac Update Brief Overview L1 & BC1 Progress LTU & E-Dump Status Continuing Resolution Impact.
What am I working on… H. Loos 08/02/2010.
Time-Resolved Images of Coherent Synchrotron Radiation Effects
Commissioning Status of the LCLS Accelerator and Undulator Systems
Diagnostics overview and FB for the XFEL bunch compressors
Data Mining Ideas.
Beam-Based Alignment Results
Recent Activities H. Loos 02/15/2011.
LCLS Injector Diagnostics
Injector Commissioning C
Linac/BC1 Commissioning P
LCLS Linac Overview E. Bong Lehman Review August 10, 2004
LCLS Commissioning P. Emma, et al
Overview Pre-Beam Checkouts
LCLS Tracking Studies CSR micro-bunching in compressors
Linac Diagnostics Patrick Krejcik, SLAC April 24, 2002
Injector Experimental Results John Schmerge, SSRL/SLAC April 24, 2002
Linac Physics, Diagnostics, and Commissioning Strategy P
Breakout Sessions SC1/SC2 – Accelerator Physics
Start-to-End Simulations for the TESLA LC
LCLS Injector/Diagnostics David H. Dowell, SLAC April 24, 2002
Breakout Session SC5 – Control Systems
Diagnostics RF and Feedback
Linac Diagnostics Commissioning Experience
LCLS Injector Commissioning P
Control System Overview Hamid Shoaee LCLS Control System Manager
Diagnostics overview Beam profile monitors Cherenkov radiators Summary
Injector Diagnostics Status
P. Emma, for the LCLS Commissioning Team LCLS DOE Review May 14, 2009
Linac Design Update P. Emma LCLS DOE Review May 11, 2005 LCLS.
LCLS Longitudinal Feedback System and Bunch Length Monitor Juhao Wu Stanford Linear Accelerator Center LCLS DOE Review, February 08, 2006 LCLS longitudinal.
Injector Physics C.Limborg-Deprey Feb.8th 2006
Physics Update P. Emma FAC Meeting October 27, 2005 LCLS.
Experience with photoinjector at ATF
High Level Physics Applications Lehman Review February 7 - 9, 2006
Presentation transcript:

High Level Physics Applications for LCLS Commissioning Henrik Loos

Physics Applications Overview Matlab framework for development ~35 applications developed by physicists ~30 with graphical user interfaces (GUIs) Created and grown within last year Development driven by commissioning needs Quick adoption of new features

Application Types Diagnostics Status Displays Machine Control & Tuning Profile Monitors Wire Scanners Emittance Bunch Length Correlation Plot Cathode QE Laser Pulse Length Orbit Response Status Displays Operating Point Orbit RF Status Beam Jitter Beam Images Machine Control & Tuning Beam Line Switching Bunch Compressor Control Twiss Matching Undulator Beam Based Alignment Simulation LiTrack 1D FEL Code

Physics HLA Launch Screen

Operating Point Primary definition for main machine parameters Used as defaults for other applications Electronic checklist Compares actuals with set points No machine control H.-D. Nuhn

Linac Beam Jitter Measures transverse beam jitter in injector and near end of linac Display of jitter in terms of normalized phase space Display of energy jitter thoughout machine D. Ratner

RF Phase Scans Beam based measurement of all RF phases Integrates Epics and SCP controls Amplitude calibration and phase re-golding Stores results in PVs for archiving P. Emma

Twiss Parameter Matching Gets Twiss from previous emittance measurement Wire scanner or profile monitor Applies solution to magnet settings Will include undulator matching soon C. Limborg

Dispersion Measurement P. Emma Orbit measurement after chicanes with varying beam energy Calculates resulting emittance growth and corrector quad strengths Applies correction

Bunch Compressor Control Set R56 of chicane Controls Dipole strengths Chicane motion Matching quads Upstream RF phases P. Emma

Beam Diagnostics Application Hierarchy Correlation Plot Bunch Length Emittance Profile Monitor Wire Scan

Common User Interface Features Files Configs Measure Export Data Point

Image Acquisition Live image display Pixels or calibrated display Line outs Intensity histogram Fit results Interactive screen calibration

Wire Scans Beam synchronous acquisition of wire position, PMT signals, charge, and beam position Automatic set of scan range from BPM reading Optional jitter correction and charge normalization Applies set of fit algorithms to profiles Add support for undulator beam finder wires

Bunch Length Measurement Measures bunch length at various profile monitors using TCAV0 and 3 Scans TCAV phase for calibration. Plot of measured images, profiles, and beam size fit.

Emittance Overview

Emittance GUI Features Measures emittance at various profile monitors and wire scanners. Uses quadrupole scan or acquisition at multiple locations (multi screen). Projected emittance or slice emittance Sets PVs for archiving and matching Plot of measured profiles, beam size fit, and phase space view. Add emittance measurement using undulator beam finder wires.

Correlation Plot Overview

Correlation Plot Features Scans any epics process variable (PV) Measures multiple samples of any number of PVs Non-synchronous and synchronous acquisition Scan of 2 PVs for 2-D plots Scan of SLC magnets Time scan Measurement of emittance, bunch length, profile monitors, wire scanners Selection of different fit functions Plot of selected results

Applications for Next Phase Beam-Based Alignment of the FEL Undulator - (Loos) Undulator Steering and re-Pointing - (Nuhn) K-measurement Application - (Welch/Emma/Nuhn) Beam-Finder Wire Application - Centering & Emittance - (Loos/Nuhn?) LTU Emittance Measurement - (Loos - extension of existing GUI) Beta-Matching into undulator - (Limborg - extension of existing GUI) FEE diagnostics - (see R. Bionta's talk)

Undulator Beam Based Alignment Measurement of undulator orbit at 3+ energies Fit of BPM & quad offsets and orbit Changes BPM offsets Moves quads with undulator girders Launches beam into undulator Integrates simulation Orbit Preliminary Simulation Offsets Measurement

FTIR Spectrometer for Micro Bunching Studies Filters Detectors Mirrors Paraboloid Radiation Splitters Interference Signal Sum Modified BL21 Existing BL21 Layout Filters Detectors Paraboloid Radiation Splitter

Spectrometer Details Upgrade for BL21 Edge radiation monitor after BC2 Compatible with present use At center position, both detectors see the same intensities as presently Resolution Scan range L = 10mm Step size ΔL = 5μm Δν = 1/(2L) = 0.5 cm-1 νmax = 1/4ΔL = 250 cm-1 Spectral range = [20μm – 20mm] Issues Converging beam in spectrometer Different phase front curvature will suppress interference

Summary Migration of applications from physicists to software group Matlab applications were developed in interaction with control room needs Existing Matlab applications are used to define software requirements Gradual replacement from lower level apps (e.g. wire scan) to highest level (e.g. correlation plots)