European Winter Outlooks 2008/2009 and 2009/2010

Slides:



Advertisements
Similar presentations
Update on Transparency Obligations Martin Reisner Junior Adviser, Transparency ENTSOGs Transparency Workshop Brussels – 11 September 2012.
Advertisements

1st Ten Year Network Development Plan: ERGEG opinion
1 GTE Winter Outlook 2007 Brussels, January 8 th 2008 Paolo Mosa GTE Vice-President Chairman of the GTE Transparency WG.
Madrid, 7 th February th SG Meeting South Gas Regional Initiative.
Benoît Esnault (CRE) NW Region – governmental meeting 6 May 2010 Pilot framework guideline on capacity allocation mechanisms.
Gas Regional Initiative Region North-West Gas Regional Investment Plan Project Marie-Claire Aoun, Carole Mathieu CRE RCC Meeting The Hague – 4 April 2013.
Concept of Data Collection Vincent Scherrer Junior Adviser, System Development ENTSOG’s Transparency Workshop Brussels – 11 September 2012.
EContentPlus Programme European Commission Community Programme
Global Competitiveness in a Liberalised EU Energy Market Wim Groenendijk, Member of the Board Brussels, 22 November 2011 Gas infrastructure and Markets.
TYNDP SJWS #3 Demand TYNDP – 3 rd SJWS 08 March 2012 ENTSOG offices -- Brussels.
1 Madrid Forum, European 10-Year Network Development Plan, January 2010 Status of ERGEG’s 10YNDP-Study: Scenario Definitions & Intermediate Results “Model-based.
EUROPEAN COMMISSION Transparency – Proposal to amend chapter 3 of the Annex of Regulation 1775/2005 EUROPEAN COMMISSION H. Hick, DG TREN C 2 NW GRI 5th.
TSO progress towards ENTSOG IFIEC Energy Forum 22 Sep 2009 Jacques Laurelut GTE President & GTE+ Transition Manager.
Directorate General for Energy and Transport Nina Grall Directorate General – Energy and Transport European Forum Gas 2007 – Paris Towards one.
Benoît ESNAULT Commission de Régulation de l’Energie 17th Madrid Forum Madrid, 15 January year network development plan ERGEG recommendations.
EUROPEAN COMMISSION Heinrich Hick, DG TREN C 2 3rd IEM Package and relevance of GRI GRI NW stakeholder Conference, London, 14 November 2008.
Washington’s Water Use Efficiency Rule May Require Increased Coordination for Many Utilities Dan Sander, P.E. Senior Engineer.
Interoperability Rudy van Beurden GTE ExCom member GTE+ Workshop on GTE+ Work Programme 24 June 2008.
GTE views on the role of TSOs As foreseen in the Third Package Joint Workshop ERGEG GRI SSE and EFET 21 January 2008.
Does the Third Package provide the European TSO associations with the tools necessary to find solutions to the European energy challenge ? Nigel Sisman,
Implementation of Transparency Guidelines Martin Reisner Advisor Current Status and future Challenges Ljubljana – 13 September 2012.
Transparency GRI SSE -- 7th Stakeholder Group Meeting Vienna, 16 October 2009 Andrea Ćirlićová GTE+ Senior Adviser.
ERRIN ENERGY INFODAY 2015 The next steps towards the development seminar for the Energy H Calls 2015 VLEVA office – 10th September 2014.
International Speedway Boulevard Stakeholders Task Force (STF) Meeting 1 Wednesday, May 19, 2010.
GTE+ progress towards ENTSOG Jacques Laurelut GTE President & GTE+ Transition Manager GIE Annual Conference 2009, Groningen.
GTE+ progress towards ENTSOG Jacques Laurelut GTE President & GTE+ Transition Manager GIE Annual Conference 2008, Bucharest.
The EU’s Third Energy Package European Code Development UNC Transmission W/S - 4 th December 2008.
22 – 23 November 2007 GIE Annual Conference How the Third Package might encourage investment.
Gas Roads & GTE Colin Hamilton (European Policy) 2 nd July 2009.
European Ten Year Network Development Statement Volker Schippers GTE+ Senior Adviser GTE+ Workshop on GTE+ Work Programme 24 June 2008.
Coordination of Capacity Products Meinhard Janssen GTE ExCom Member GTE+ Workshop on GTE+ Work Programme 24 June 2008.
CALENDAR 2015: “THIS PROJECT HAS BEEN FUNDED WITH SUPPORT FROM THE EUROPEAN COMMISSION. THIS PUBLICATION [COMMUNICATION] REFLECTS THE VIEWS ONLY OF THE.
European Developments Transmission Workgroup 1 st December 2011.
Michael Schmoeltzer Member of ERGEG Gas Working Group GIE Annual Conference, 6/7 May 2009, Groningen ACER & ENTSOG and their interaction.
Walter Boltz, Chairman ERGEG Gas Working Group 18 th Madrid Forum 28/29 September 2010 Draft framework guideline on balancing in natural gas transmission.
Integration of Demand Side Management, Distributed Generation, Renewable Energy Sources and Energy Storages Task status report, Task XVII EXCO meeting.
10 year investment plan ERGEG approach and contribution
The 3rd package for the internal energy market
Dr. Benoît ESNAULT (CRE) and Dr. Stefanie NEVELING (BNetzA)
New transparency guidelines
Annual Strategic Planning Draft Timeline and Process
Assessment of the Evaluation Culture
Update on GRI NW Transparency Project
Enagás, GRTgaz, Reganosa, REN and TIGF
Gas Regional Investment Plan North West Europe 2013 Presentation for ENTSOG (November 26th 2013, Brussels) and GRI NW SG (November 28th 2013, Stockholm),
Review of System Alerts
GSE worked with ERGEG on CAM/CMP since
2009 TSO Transparency Gas Regional Initiative North-West
Background and Process
Logo(1.00”:3.33”) Font is Rotis Sans Serif however font may have to be embedded as it is important that this does not change on any presentations Size.
Gas Regional Initiative
WG1: RELIABLE, ECONOMIC AND EFFICIENT SMART GRID SYSTEM
In depth analysis of TYNDP issues
- GDP 2011 versus 2010 – increase by 5.5%
Organisational Development
GTE+ Winter Outlook 2008/2009 Final Version,
Gas Regional Investment Plan North West
Transparency Platform
In depth analysis of TYNDP issues
Gas Regional Investment Plan North West
Gas Regional Investment Plan North West Europe 2013 Presentation for ENTSOG (November 26th 2013, Brussels) and GRI NW SG (November 28th 2013, Stockholm),
ACER opinion on ENTSOG’s 2011 Ten-Year Network Development Plan
Introductory Speech FRANCISCO DE LA FLOR - GLE PRESIDENT 26/04/2007
Gas Quality & TSO – LSO Coordination
In depth analysis of TYNDP issues
0845 Analysis I have only very recently taken over responsibility for the 0845 number and whilst questions were asked of Derrick some months ago, we have.
Stakeholder Workshop 1: Situation Analysis
Review of Framework Guidelines Processes
LNG Workshop Bilbao, March 13th 2009 GLE.
Jacques LAURELUT GTE First Annual Work Programme Consultation
Presentation transcript:

European Winter Outlooks 2008/2009 and 2009/2010 Volker Schippers GTE+ Senior Adviser GTE+ Workshop on GTE+ Work Programme 24 June 2008

European Winter Outlooks 2008/2009 and 2009/2010 European level analysis of the transportation capacities and consumption forecasts in peak conditions and identification of possible EU internal bottlenecks to fulfil demand under these conditions Contents Daily consumption forecast in peak winter conditions for the next winter under normal and exceptionally cold conditions Transmission capacities of infrastructures at main European import points, LNG terminals and aggregated entries from national production Aggregated entry capacities from storages

Background First European Winter Outlook was developed by GTE for the winter 2007/2008 after discussing this idea on Madrid XI Highly welcomed in the meeting of the Gas Coordination Group on 25 October 2007; additional analyses requested Results of these analyses presented by GTE on the meeting of the Gas Coordination Group on 8 January 2008 GTE+ plans to develop Winter Outlooks for the winters 2008/2009 and 2009/2010 Recognise usefulness of this work for the European Gas Market Draft Third Energy Package of the Commission foresees the development of annual Winter Outlooks by ENTSOG

Assumptions Based on the respective national information provided by GTE+ members Expected that a fair representation of the European situation can be developed although it must be taken into account that the data collected this way cannot necessarily be seen as complete Develop and apply specific assumptions to take into account the depletion of production fields and the decrease of the withdrawal performance of gas storages during the winter

Timeline 2008 2009 Winter Outlook 2008/2009 Winter Outlook 2009/2010 J F M A M J J A S O N D J F M A M J J A S O N D Winter Outlook 2008/2009 Data Collection and Analysis Presentation and Discussion Final Version Winter Outlook 2009/2010 Data Collection and Analysis Presentation and Discussion Final Version

Development Phases for the Winter Outlooks 2008/2009 and 2009/2010 Data Collection and Analysis (July and August) Collection of the data via the GTE+ Members Evaluation of the data received Production of a draft Winter Outlook Presentation and Discussion (September and October) Presentation of the draft to European Stakeholders (MF, GCG or another appropriate event involving a large number of European stakeholders) Feedback received will be used to refine the work Publication of Final Version (October)

Discussion