Overview of KLM Crate Utilization

Slides:



Advertisements
Similar presentations
EMC Status Report: November 2003 Roger Barlow Events since last report (25 th Sept.) –The ROD Current status –Electronics –Neutron Generator –Light Pulser.
Advertisements

LST Mechanical Design Review Utility Routing, Cableways & Crate Locations Peter Kim October 21, 2003.
Continual Improvements on Preparation for SNM Experiments on Z Contamination Control System Final Design Review Matt Christison, Scot Lewis February 23,
Instructions for making plunger fork tool. Drawing for the trigger assembly.
Disassemble, Assemble and Perform a Function Check on the M203
October 21, 2003LST Mechanical Design Review - SLACN. Yu BaBar IFR Upgrades An FEA Study of the Effects of Adding Brass Plates in the IFR.
A 1 A 2 A 3 A 4 B B B
Scintillator based muon upgrade / BELLE Super B Factory Workshop In Hawaii Jan 2004, Honolulu, Hawaii 1.Scintillator strip option 2.Geiger photodiodes.
BaBar: The Detector Richard F Boyce 21 October 2003.
Name: Date: How to Find the Number You Are Skip Counting By 1) Find 2 numbers next to each other. 2) Find the smaller number on the number grid. 3) Hop.
Configuring Content Navigation Module 8. Overview  Understanding Site Navigation  Customizing Current Site Navigation  Customizing Global Site Navigation.
Excess Radiation Damage of CMS Endcap Hadron Calorimeter and “Finger” Structure of Tiles as a Possible Method of Radiation Hardness Increasing I.Emeliantchik,
Hall D Design Status GlueX Collaboration Meeting JLab, December 11-13, 2003 Ravi Anumagalla.
1 Remove seat from vehicle and remove seat trim cover.
+2.5 V 30 A +5.8 V 3 A -3.6 V 25 A +4 V 100 A +4 V 100 A Controller TGC1 subrack organization +4 V 65 A Controller First 84 HP (19”) subrack Controller:
E. Richards EE Chamber installation. Summary Position Of the EE chambers General view of EEL chambers EEL5 chamber Installation of other chambers ex.
Endcap Signal Feedthrough Overview Endcap Signal Feedthroughs are constructed and tested in Victoria by Victoria and TRIUMF staff. Each feedthrough unit.
KLM Trigger Status Barrel KLM RPC Front-End Brandon Kunkler, Gerard Visser Belle II Trigger and Data Acquistion Workshop January 17, 2012.
RPC Trigger Electronics Review Subjects: Link System Low Voltage Link System Upgrade Krzysztof Doroba, University of Warsaw Krzysztof Doroba, RPC TRigger.
The BaBar Upgrade Load transfer of the Barrel and Endcap Calorimeters Richard F Boyce 21 October 2003.
PHENIX BNL 6/3/2005 Walter Sondheim, Jan Boissevain, Dave Lee PHENIX UPGRADES: SVTX + SI ENDCAPS.
GAD Online Essay Online Software Overview Created by A. Tait 2014.
4) Design the logic to control the motor on a simple remote control car. There are two buttons on the remote control for the motor. If neither button is.
Learning the Basics How to make all different kinds of knots.
ZDC for BM&N Preliminary results for 2 H and 12 C beam with energy T=3.5 GeV/nuclon JINR Dubna, LHEP February - March 2015 Gavrishchuk O.P.
For discussion… Adachi. Horizontal effort Horizontal effort: one example – All of the proposed barrel PID detector use quartz bar radiator – Possible.
If You are getting this massage than your System is not configured for e-tendering. You need to configure the Computer/Laptop by seeing next few slides.
Project Overview James Fast Pacific Northwest National Laboratory.
Installing and Using Evolve Evolve is written in Java and runs on any system with Java 1.6 Download Evolve from Unzip.
B-KLM DAQ 2011/01/25 Trigger/DAQ workshop K. Sumisawa (KEK) Introduction Summary +7 pages.
WBS 1.04 KLM Systems (Technical) Leo Piilonen Virginia Tech.
June 2, 2008 Bill Wisniewski1 BaBar Disassembly and Disposal Overview.
Geometry of the ACD Beam Test at CERN (2002) Tsunefumi Mizuno Overview of the Setup: p.2 ACD tile configuration: pp.3-4 Sn Calorimeter:
October 6, 2009Bill Wisniewski1 State of drawings Remedies? Forward Region DIRC/DCH/EMC interplay Road Trip Discussion Beam pipe & forward cone plug ‘Quick’
US Belle-II Firmware/Hardware Brandon Kunkler May 1, 2013.
Pretest Question: Three identical metal balls L, M and N initially have charge 4 C, -2 C and 0 C, respectively, as shown below. What is the charge on.
WBS 1.04 KLM Leo Piilonen Virginia Tech. Talk Outline WBS Element Scope Performance Requirements Cost Summary Schedule Risks Summary January 2014Leo.
Miscellaneous about Target Spectrometer PANDA Mechanics Meeting, September 2015 J. Lühning, GSI Space around Barrel Target Platform Cable Routing.
WBS 1.03 Readout Systems Specifications, Design and Acceptance
Add and Subtract Negative Numbers
PANDA Yoke of the Magnet
DCS: Temperature Probes
PANDA Collaboration Meeting , BINP Sergey Pivovarov.
General DSM layout for E+B
Transport Issues for EMC Barrel
AU Media/ER/Toyota/Tech/Gen 7/06 Toyota Tundra
Barrel stave allocation on the PP0 exhaust fitting
The 5S numbers game. 1 1.
Forward chaining Slides Obtained From Russel & Norvig’s Website.
הקורס להכשרת מטפלים התנהגותיים ABA
LST Module Installation
The 5S numbers game..
Installing and Using Evolve
Restart of BF#2 Using Durfee Method
شاخص‌های ارزش‌گذاری پتنت (1)
Pierluigi Paolucci & Giovanni Polese
Hundreds board counting
Separation of Scintillation and Cerenkov Light
Which way does the robot have to turn to get to the charger?
The 5S numbers game..
Install Additional Domain Controllers
SuperB Integration Summary of previous integration sessions.
Pierluigi Paolucci & Giovanni Polese
How many groups are there?
SuperB Integration Summary of the Integration Status
Density              .
BaBar LST Upgrade Richard F Boyce
Pierluigi Paolucci & Giovanni Polese
Removal of brackets Example Work out each of the following
Presentation transcript:

Overview of KLM Crate Utilization Belle Crate Configuration shown Plan is to re-use locations, but with the following changes: All endcap 6U crates are removed 8 new 9U (COPPER) crates for endcap are installed (4x each end, 2x each door) 4 new 9U (COPPER) crates for barrel scint are installed (BF4, BF0, BB4, BB0) ARICH and TOP FTSW located in 8 crates (BF0 .. BF7) and (BB0 .. BB7) respectively

Forward Endcap (Scintillator) KLM

Backward Endcap (Scintillator) KLM

Forward Barrel KLM Octant BF2_left Octant BF2_right

Backward Barrel KLM Octant BB2_left Octant BB2_right