Update on the status of RBMP reporting

Slides:



Advertisements
Similar presentations
PFRA reporting – Output from test phase FD Drafting Group, Meeting 16 February 2011 Mette Wolstrup.
Advertisements

Water.europa.eu Assessment River Basin Management Plans CIS Strategic Coordination Group meeting Brussels, May 2011 Marieke van Nood WFD Team DG.
WISE Working Group D DG Env Brussels Jon Maidens, Atkins Danmark a/s.
1 12/11/2015 WFD2016 Reporting Workshop under the Common Implementation Strategy of the Water Framework Directive (WFD) - Introduction to Reporting Guidance.
Water.europa.eu Update on legal issues Strategic Coordination Group Update as of Marco Gasparinetti, DG ENV.D.1, European Commission.
TRADE CONTACT GROUP Brussels 9th June 2009 Agenda item 3a) State of play of IT systems: Import Control System (ICS); Export Control System (ECS); New.
Eurojust cases involving crimes against children
Strategic Coordination Group State of transposition and implementation
Marine Strategy Framework Directive: activities of WG DIKE
Working Group on Data, information and knowledge exchange
For info only! Expected date of reporting of RBMP as reported informally by SCG Legal deadline 22/03/ MS by deadline 1 MS partly by deadline (BE)
EU Water Framework Directive
Ag.no. 15 Lessons from the 2015 A65 exercise
Delivering electronic Natura 2000 data via Reportnet CDR
Delivering electronic Natura 2000 data via Reportnet CDR
Water Directors’ Meeting State of transposition and implementation
State of legal transposition (1)
3C. Update of Summary of WISE electronic delivery
Update on the status of RBMP reporting
Report on WISE Art.8 and GIS issues
Habides update (May 2011).
State of play Article 5 reports
State of play of Urban Audit
Education and Training Statistics Working Group
1.
on Priority Substances Strategic Coordination Group
MSFD Article 12 assessment Follow-up on geographic issues
WFD Article 8 Schemas Yvonne Gordon-Walker.
Marine Strategy Framework Directive: Status of reporting
Article 13 RBMP reporting testing 2009
State of progress with transition to new Standard Data Form
Update on legal issues Strategic Coordination Group
2a. Status of WFD reporting
Reporting – Art 17 of HD and Art 12 of BD
Item 8.1 Implementation of the 2016 Adult Education Survey
2b. Status of WFD reporting
Programme adoptions Cohesion Policy:
Contribution for the updating of the WFD reporting sheets and schemas
Agenda point 1 Commission activities Agenda point 2 CIS activities
Marine Strategy Framework Directive: Status of reporting
Marine Environment and Water Industry Unit
ETS Working Group meeting 24-25/9/2007 Agenda point 7 CVTS3 brief update /09/ 2007 ETS working group.
Summary of WISE electronic delivery
Marine Strategy Framework Directive: Status of reporting Art. 8/9/10
MSFD Article 11 reporting Monitoring programmes
Date/ event: EEA Drafting group meeting SoE guidance, Copenhagen
Update on legal issues Strategic Coordination Group
Summary of WISE electronic delivery
DG Environment, Unit D.2 Marine Environment and Water Industry
Agenda item 1 – Transposition and implementation of WFD
WFD River Basin Management Plans :
2015 Update of Union Lists of Sites of Community Interest
Comparison of methodologies for defining Good Ecological Potential
Update on legal issues Strategic Co-ordination Group 7-8 May 2009
Legal and implementation issues update
Meeting of Water Directors State of transposition and implementation
State of Play RBMPs and WISE reporting (9/07/10)
WISE Main Rivers & Main Lakes (MR & ML)
PFRA reporting – Output from 2. test phase
Update on implementation WG F 27 April 2010 Maria Brättemark
Update on legal issues Strategic Coordination Group 23 February 2010
Update on legal issues Strategic Coordination Group
Marine Strategy Framework Directive: Status of reporting
Update on status of reporting and validation process
Transposition and implementation of WFD
Review of BWD reporting for 2009 season (Item 2)
European waters - assessment of status and pressures 2018
DG Environment, Unit C.2 Marine Environment and Water Industry
DG Environment, Unit C.2 Marine Environment and Water Industry
2. WFD implementation: state of play
Presentation transcript:

Update on the status of RBMP reporting WISE Working Group D, DG Env Brussels 13/14-10-2010 Mette Wolstrup, Atkins Danmark a/s

Recalling the reporting process

RBMP reporting Electronic XML based reporting Ten schemas covering Artcile 3, 5, 8 and 13 Associated spatial information RBMPs, POM and other supporting documents All files are to be uploaded in EEA's Reportnet Deadline 22 March 2010

Tools to support submission http://water.eionet.europa.eu/schemas/dir200060ec/resources/ Schema user guidance Reporting user guidance GIS reporting guidance Helpdesk WFD Log WFD Reporting database Database to XML conversion tool XML Validation tool helpdeskWFD@atkinsglobal.com

Submission workflow Upload to ReportNet Schema level validation allows for identification of issues Release envelope Cover letter forwarded to Commission

State of Play RBMPs and WISE reporting (07/10/10) MS RBMP adopted WISE reporting RBMP reported XML GIS AT J  ES L K MT BE FI NL BG FR PL CY HU PT CZ IE RO DE IT SE DK LT SI EE  LU SK EL LV UK NOTES: Status: 07/10/2010 The column “RBMP adopted” reflects the contents of DG Environment’s web page: http://ec.europa.eu/environment/water/participation/map_mc/map.htm GREEN - River Basin Management Plans adopted! YELLOW - consultations finalised, but awaiting adoption. RED - consultation have not started or ongoing. The WISE reporting columns reflect if largely complete (green), partial (yellow) or no reporting (red) has been done on the three parts expected: - Copies of the RBMP and PoM XML files GIS files If the plan has not been yet been finalised and adopted it is assumed that the information submitted in WISE reflects draft plans.

Quality assurance process

Validation process (Atkins) Date (if applicable) Presentation Title MS XML submission Validation process (Atkins) Completeness ReportNet QA feedback Cross schema validation Spatial validation Validation report Member State

State of Validation (12/10/10) MS Ready Validation XML Feedback Resubmit AT ES MT BE FI NL BG FR PL CY HU PT CZ IE RO DE IT SE DK LT SI EE LU SK EL LV UK NOTES: Status: 12/10/2010 The column “Ready” reflects if data are ready for XML validation The columns reflect if complete (green), partial (yellow) or no reporting/action (red) has been done on the xml schemas Grey = not applicable

Validation workflow Date (if applicable) Presentation Title Member State Review validation report Fix errors Address errors in feedback Return feedback (for all RBD at one time, internally coordinated)

Agreed errors in schema Date (if applicable) Validation errors Validation errors Allowable Long text fields Agreed errors in schema Values beyond limits Extend enumerations Type change

Validation errors (2) Validation errors MUST be addressed Incorrect types – text in numbers Missing mandatory information Value lost on data import Compliance check issue

Validation errors (3) Presentation Title Values outside of enumeration list Exceeding text field length Number larger than field restriction Schema limitations e.g. % greater than 100 Agree with COM, ignore error Ignore error Ignore error Agree with COM, ignore error Information not available for number fields Information not available for mandatory fields Schema incorrect e.g. mandatory where conditional Incorrect type, e.g. comment in number field Use exception types -7777 (Not applicable) -8888 (Yet to be measured) -9999 (Unknown) Use -9999 for numbers and 'Not available' for text Use -7777 for numbers and NA for text FIX – comments in number fields will get value 0

Validation errors (4) Presentation Title Agreed to report intervals for highgoodboundary/ goodmoderatboundary ect Ghost tags from conversion tool ???? Agree with COM, ignore error Inform helpdesk for tool amendment Send an email to helpdesk

Missing mandatory information in summery report Presentation Title Missing mandatory information in summery report 1.Point Source 2.Diffuse Source 3.Water Abstraction 4.Water Flow Regulation/Morphological alterations 5.River Management 6.Transitional and Coastal water Management 7.Other Morphological Alterations 8.Other Pressures.

Database import work flow Validation, feedback and resubmission Database import Import errors Modify Send back to MS Return modified schema to MS

Outstanding errors (12/10/10) MS Ready validation Import errors Missing mand. Docume nted Documen ted AT ES MT BE FI NL BG FR PL CY HU PT CZ IE RO DE IT SE DK LT SI EE LU SK EL LV UK NOTES: Status: 12/10/2010 The column “Ready” reflects if data are ready for database import Green = yes/no outstanding issues) Yellow = partial Red = no/outstanding errors Grey = not applicable

Spatial v XML checking Herman Peiffer from EEA running script All codes in shape file dbf are in the XML Code list values are within enumeration list

EEA example script Check: All codes in dbf are in the xml file Check: Codes used are in enumeration list

validation assessment report

Report National and RBD Filtering of what is relevant Links to QA messages Results of scripts are added as feedback in envelopes [example report to be shown]

Member State feedback Envisaged that respond directly to errors Make resubmissions to new envelopes under the RBD Single record which can be passed on to Commission [example of MS feedback to be shown]

Managing resubmissions Same RBD Create new envelope (use date) Upload only those files to be corrected, but full schemas New date in filename

spatial submission checks

Spatial quality checking Run after XML issues have been communicated and resolved as far as possible Completeness Logical consistency (in schema QA/QC) Topological consistency specific to WFD

State of spatial validation (12/10/10) MS Ready Validation XML Feedback Resubmit AT ES MT BE FI NL BG FR PL CY HU PT CZ IE RO DE IT SE DK LT SI EE LU SK EL LV UK NOTES: Status: 12/10/2010 The column “Ready” reflects if data are ready for spatial validation The column “XML” reflects if the XML validation is finished or at a point where it will not influence the spatial data validation The columns reflect if complete (green), partial (yellow) or no reporting/action (red) has been done on the spatial data Grey = not applicable

Feedback Second report Follow the same process as previously [Example report to be shown]

Common errors Projection not ETRS-89 Files not following shapefile template RBDSUCA reported on RBD level?