About Shanghai World Financial Centre

Slides:



Advertisements
Similar presentations
Managing the Health and Safety of Contractors
Advertisements

Pryda Floor & Rafter Truss Systems
January 2001ASTRON BUILDINGS S.A.1 STEEL. January 2001ASTRON BUILDINGS S.A.2 STEEL as a construction material.
Manual Handling.
DSE – beyond the basics Presented by Cate Adamson.
Key Concepts: Definition of a Project Characteristics of a Project
Copyright 2010, The World Bank Group. All Rights Reserved. Statistical organization Principles and models Part 1 Strengthening Statistics Produced in Collaboration.
Lecture # 2 : Process Models
Main Functions of Buildings 4 Provide a safe and comfortable environment for work and rest. (Protect us from wind, rain and the wild animals) 4 Two types.
© AgiliX Agile Development Consulting Agile Software Architecture Cesario Ramos.
Slide 2.1 4E1 Project Management Defining the Project.
Class 28: Chapter 16: Project Management Class 28 Agenda –Collect Player Diary 2 and Conduct Player Audit No ed diaries – 5 PM Deadline –Discuss Grade.
Rectangular framed structures
Case Study – St Clair Park Village, Auckland, NZ
Civil Engineer Ethan Painter.
Tallest Skyscrapers As of mid Tallest Skyscrapers World-wide World-wide Had to consist of floors Had to consist of floors Any removable structure.
Homebush Bay Rail Link l 700 lineal metres of precast concrete arch l 9 different profiles.8 x 2.5 to 19 x 8 l 900 units. l Reinforced soil with precast.
“Business, Accounting and Financial Studies for Secondary Schools” Introduction to Elective Parts.
Construction Technology Applying Technology Period 1.
Artificial Intelligence Lecture 9. Outline Search in State Space State Space Graphs Decision Trees Backtracking in Decision Trees.
Chapter Five Human Resource Planning: Methods and Applications
Moving Up, Moving On STEM Disability Transition Group Conference 12 th July 2013, Institute of Physics.
Martin Clarke British Precast 11 February 2009 The Sustainability Advantages of Concrete Structures.
Presentation for China Migrant Labour Occupational Health and Safety Project - June, 2009 Overall Policy and Regulatory Considerations Affecting Migrant.
The Design Brief How to Write. Any step can be revisited throughout the Product design process 1. Identify client, user, need, problem or opportunity.
Primary target field: industrial organization Secondary target field: financial economics, game theory Paper: Exit in duopoly under uncertainty Thesis:
Software Engineering MCS-2 Lecture # 6
STRUCTURAL ENGINEERING. What Does a Structural Engineer Do?
Market Research & Product Management.
Carl Vance Combustion Air Pre-heater Design Review Presentation ME 486 3/13/03.
Project Management Introduction Lecture 1 Resource Person: M. Adeel Anjum.
What is project management?
Safe by Design Safe by Design Operation Maintenance and Repair
Economical Design of Concrete Buildings Lawrence Novak.
Search in State Spaces Problem solving as search Search consists of –state space –operators –start state –goal states A Search Tree is an efficient way.
Planning and Organising Two Plant and Equipment - Cranes- ConstructioConstru cc 2 : 2012 Construction Practice 2 : 2012 Presenter Tony Bosnich Glenn Edmonds.
Change Management. Definition Change management is a structured approach to transitioning individuals, teams, and organizations from a current state.
Marriage (Negotiating Roles and Conflict Resolution)
Cristina Macarron Department of agriculture economics 31 DE MAYO DE 2008 Georg-August-Universität Göttingen.
Project Management What are businesses trying to achieve by using Operations Management? (done on AS) EFFICIENCY.
P3 Business Analysis. 2 Section F: Project Management F1.The nature of projects F2. Building the Business Case F4. Planning,monitoring and controlling.
DESIGN OF AIRPORT TERMINAL AND CONTROL TOWER
Best 20 jobs jobs sites.
Identify job, batch and flow production - E Explain when job, batch and flow production are likely to be used - C Analyse the advantages and disadvantages.
Unit 2: Sustainable Construction Embodied Energy Learning Outcome To gain an understanding of Embodied Energy in buildings from extraction of raw materials.
Roles and responsibilities PM
CHALLENGES AND IMPLEMENTATION OF KNOWLEDGE BASED ECONOMY IN ESTONIA
Temporary Works – P8 Project Practice.
School of Economics Shanghai University
Appendix B Agile Methodologies
The 4M’s In Construction Management
PROJECTS AND THEIR MANAGEMENT
Requirements and Optimization
PROJECT MANAGEMENT WITH CPM/PERT.
Hong Kong Airport.
About Pertonas Towers, Kuala Lumpar
Project Scheduling Basics Activity on Node Precedence Diagrams
Software life cycle models
IS Project Management Mini review
1 Total Slack A 3d Task Early Start Late Start Early Finish
Engineering Project Project Management Project Management.
Developing a Metadata Element Set and/or an Application Profile
Haskell Tips You can turn any function that takes two inputs into an infix operator: mod 7 3 is the same as 7 `mod` 3 takeWhile returns all initial.
Project Management CPM/PERT Professor Ahmadi.
PRODUCTION SCHEDULING
Great heights 世界著名高層建築物.
ЕФЕКТИВНА РЕВИЗОРСКА ПРОГРАМА ВО ОБЛАСТА НА СППФТ
Appendix B Agile Methodologies
Economics Created by Educational Technology Network
Spotting the Differences: Understanding Historical Approaches
Presentation transcript:

About Shanghai World Financial Centre Architect: Kohn Pedersen Fox Date Completed: 2008 Height: 492 Meters – 101 floors Materials: Steel, concrete and glass

Burji Karlifa

Hong Kong Airport

Olympics 2008, Beijing

So what do all these buildings have in common??? Someone even 500 years ago PLANNED the construction process However as the building process have evolved so has planning process. But basic principles are the same.

A series of small tasks , steps or small projects. Planning definition Thinking ahead ! A large task or project is what????? A series of small tasks , steps or small projects. Our job is to take the finished project work backward and define what these steps or task are.

Basic planning thinking What do I have to do before I can start this task. Instigation or predecessor What can I do after I have finished this task This becomes the instigator or successor of the next task REFINEMENTS OF THESE TWO What can I do concurrently whilst doing this task? Do I have to 100% complete a task before starting the next one?

The perfect situation This is fine in a factory control situation but building construction is subject to many risks and constraints. So we need to adapt our requirements of effective construction planning to suit. What is the basic difference between Project work and factory work. Effective construction planning is a clear interpretation of the steps or tasks required to carry out the completed project in accordance with constraints of the site and within the requirements of the end user.

This has an effect on our approach to how we plan the construction process. Project based Operation based Unique Finite Revolutionary change Disequilibrium Unbalanced objectives Transitional resources Flexibility Effectiveness Goals Rick and uncertainty

Answer project operation Unique Repetitive Finite Eternal Revolutionary change Evolutionary change Disequilibrium Equilibrium Unbalanced objectives Balanced objectives Transitional resources Stable resources Flexibility Stability Effectiveness Goals Efficient Roles Rick and uncertainty Experience

Summary learn this Construction planning refers to understanding what has to be built, then establishing the right method, the right plant and the right labour force to carry out the works safely and to the quality required, in the most economical way to meet the site constraint and the client requirements

References www.greatbuildings.com Skyscrapers – A History of the World’s Most Extraordinary Buildings, Judith Dupre .