Small cryotrap – control rack Nov Piano temporale Mid Jan: RR Begin Feb:order of the cryostat May:cryostat on site, rack ready.
Advertisements

Q&A Smalltraps RReview 19Feb2014. From C. Michel: Congratulations for the Vac Team: the project is mature and ready for the manufacturing step. Nevertheless.
Vac meeting 08 Oct 08 Agenda 1. needed operations for towers displacements (Frederic R.) final comments on the 2m bottom not accessible anymore 2. Larger.
Electrical Installation CM39 Andy Gallagher & Ian Mullacrane.
VAC - Ctrl System 04Nov2011. Some points to be discussed Give support for the cryogenic control system prepared by Nikhef team for Cryotrap (and Genova.
SPL cryo-module conceptual design review Cavity, helium vessel and tuner assembly N. Valverde, G. Arnau, S. Atieh, I. Aviles, O. Capatina, M. Esposito,
VAC – CTRL SYS 8 Feb VAC : MSRC equipment Central area links, to be discussed Ion Tmp aux.
1 VAC – Vacuum system modifications Cascina, 03Nov08 A.Pasqualetti for the VAC contributors.
Status and Integration of the Spectrometer Solenoid Magnets Steve Virostek Lawrence Berkeley National Lab MICE RAL June 15, 2007.
AdV VAC design meeting Cascina, 19 July Agenda first discussion about vacuum design of central area - and pickoff chamber design in particular -
AdV Vacuum system changes, 04Mar2010, NDRC option Preliminary Cryotrap_NI Link or tube? Cryotrap_NE Link Cryopump SR? Cryopump PR? Zeolites/27K/77K (or.
Vacuum - CONTROL SYSTEM 29 June Agenda MSRC design, first ideas and plans – Antonio quiet cooling fans test – Irene some scada SW review - Martin.
AdV VAC CTRL SYS Paris, 22 Mar Proposed Agenda - Morning (9h30 to 12h) part I general status of ctrl system activity
July LEReC Review July 2014 Low Energy RHIC electron Cooling Roberto Than CRYOGENICS SYSTEM.
AdV cryotrap: cryostat surface is partially exposed to the near mirror (input ~ end). Its seismic shaking is amplified by LN2 boiling. The rest of vacuum.
SC Project Review of NCSX, April 8-10, 2008 NCSX Cryogenics Systems WBS-62 Steve Raftopoulos NCSX Cryogenic Systems WBS(62)
AdV- VAC CTRL SYS/Cryo Interface 06Feb2013. Cryotrap cryogenics (simplified sketch) = the ‘electronic’ equipment needed to read LN2 level, temperature,
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
AdV Vacuum system changes, 23Feb2011 Central area vacuum equipment SVC 2 (mini) towers 1 new HV tower (Inj) DT,IB from HV->UHV towers (with additional.
EHN1 Cryogenic Integration Requirements David Montanari / Johan Bremer Jun 18, 2015 Rev. 1.
News from LAL on Vacuum System Racks for cryotraps: call for tender done provider selected purchase of electro-tech components in progress prototype expected.
AdV Vacuum system changes, Feb2010 ‘New stations’ generic Layout preliminary Cryotrap_NICryotrap_NE Cryotrap_WI Cryotrap_WE Cryotrap_DT ? Cryotrap_IB ?
11 T Dipole Project Cold mass integration status & plan F. Savary / TE-MSC-LMF.
Plan for test station Marta Bajko For the Technical Review of FReSCa2 June 2015 Saclay Paris.
1 Mice Collaboration Meeting CM27 STFC Rutherford Appleton Laboratory, UK 7 th -10 th July 2010 Daresbury Laboratory Electrical Infrastructure Report Authors.
A.Henriques (JCOV meeting 31/5/2001) ATLAS Calorimeter cooling project Goal: u Definition of a common frame work for the cooling of the ATLAS calorimeter.
High power RF tests places at CERN O. Brunner, CERN 4th SPL Collaboration Meeting jointly with ESS.
MAGNET#1MAGNET#2MAGNET#3 SATELLITE VB#1 SATELLITE VB#2 SATELLITE VB#3 PRECOOLER#1PRECOOLER#2 DISTRIBUTION VALVE BOX DVB CP#1CP#3CP#2 BUFFER DEWAR LHe 5m.
VAC – CTRL SYS internal meeting, 14 Dec A list of topics Start of the disassembly works: mid Jan. At first the W arm shall be off- service, then.
RESEARCH AND DEVELOPMENT FOR FUTURE LHC SUPERCONDUCTING MAGNETS POINT SUR LA STATION D’ESSAIS préparé par Jean-Marc Gheller Steering committee –September.
ITER Liquid Helium Plants Status and Test Protocol ICEC June 29th, 2015 / Grenoble / FranceY. FABRE.
TRD Gas System Layouts Production Readiness Review 03 – Nov F. Hahn.
ELENA installation progress F. Butin / ELENA collaboration.
1 Young-Ju Lee Vacuum & Cryogenic Engineering Team National Fusion Research Institute Young-Ju Lee Vacuum & Cryogenic Engineering Team National Fusion.
Alice TOF Production Readiness Review Gas Control Systems.
S A Griffiths CM42 June 2015 Electrical & Control.
WBS 1-7 System Assembly & Installation John Voirin August 10-11, 2011.
MVD COOLING STATUS MVD COOLING PROJECT: CHOICE of COOLING FLUID,
NEW RMC Rack Multi Control.
KFA45 Hydraulic System Upgrade – “Full” Option” Controls Implications
Uppsala University Contract UH2015/09 - UA2016/05 Job nr. 5973
Gaseous N2 -196⁰C Vacuum Liquid N2 -196⁰C Radiation shields Outer wall
Status & Plans for WA105 Control System
He Plant, LN2 Systems and Commissioing
IT-4189 Supply and installation of a cryogenic distribution system
Proximity Cryogenics P&IDs meeting
Uppsala University Contract UH2015/09 - UA2016/05 Job nr. 5973/7200
AEGIS Magnet System.
SPS cryogenic proximity equipment and SM18 validation
Teleconference ACS – FREIA 10th May 2017
Warm structure requirements :
Phase Camera hardware Nothing really new, only summarising status
CRYOGENICS OPERATIONS 2008 Organized by CERN
352MHz Klystron Control for the 3MeV Linac test stand
XFEL Vacuum System Commissioning
Cryogenic C&C Scope of work
Status of the cryogenic system for B180
TEST PLANS for HL LHC IT STRING
Coldex disinstallation
Undulator Vacuum System
AdV - Internal Review of VAC subsystem
A Complete System for Operation of a Superconducting Magnet*
SNS PPU Cryomodule Instrumentation
Undulator Vacuum System
Status Vacuum Control-Command for AdV
LCLS-II Cryoplant Controls Workshop.
‘New stations’ generic Layout Preliminary, NDRC or MSRC?
Cryogenic upgrade of B165 CRG Status Meeting 16th may 2019
Distribution Student Task
Cryogenic upgrade of B163, B165 & B253 Status Meeting 19th December 2018
Presentation transcript:

Periodical meeting about the 'control system ‘ AdV VAC 13Nov2012 SUMMARY Network needs , + a few others and 1500N Small cryotraps control racks work sharing Racks delivery, DCU400, Toroidal DC supply F2F meeting about cryogenic interface fro cryotrap racks

Network needs: additional control racks for AdV vacuum equipment to be included in the network New system Control Station 300m tube stations 2 new simple racks (unless it is the N1b and W1b of the schematic) Small cryotraps DT, IB Cryogenics systems of cryotraps Interface to be discussed TCS systems Should be integrated in existing racks, just P level TBC

Small cryotraps 2 LN2 cryostat for DT and IB, practically same as the present DT cryotrap. The contral rack need to re-done and integrated in the general one (cryogenic part + a very simple pumping system). Work sharing to be discussed

Cryotrap cryogenics controls being developed by Nikhef (draft): F2F meeting about interface is urgent Temperature, T1- T8 Cryostat Pressure Pc2 CL1 Level External Tank LN2 CL2 Level A1-A4 alarms PID I/O Vcryo TL1 Level Settings, TBD Phase separator system

Others EGO->LAL CTRL racks ready (packed) within Fri23 Nov DCU400 can be sent (cables TBC) LAL->EGO Plans for the toroidal DCU400? We need to test it in order to finalize the design