Undulator Vacuum System

Slides:



Advertisements
Similar presentations
XTCAV X-Band Transverse Deflecting Cavity Project Overview Patrick Krejcik Yuantao Ding, Joe Frisch.
Advertisements

M. Jimenez AT/VAC Room Temperature (LSS) Vacuum Systems M. Jimenez.
Steve Lewis Direct Imager 06 Dec EPICS Controls Steve Lewis 07 December 2007 LCLS Direct Imager Final Design Review.
Hamid Shoaee LCLS FAC Controls June 17, LCLS Control System Personnel Linac & BC2 Controls progress LTU, Dump Controls.
Arturo Alarcon Undulator Controls Module Status 11/12/2008 SLAC National Accelerator Laboratory 1 Undulator Controls Module Status.
High-Vacuum Technology Course
Stephen Schuh Vacuum Controls Final Design 6 April 2006 Injector Vacuum Controls Hardware Final Design Review 6 April 2006.
IBL CO 2 cooling control system development status Lukasz Zwalinski – PH/DT/DI Maciej Ostrega – PH/DT/DI Florian Corbaz – EN/CV/DC.
ISOLDE Vacuum Controls (CERN-GSI WS), S. Blanchard TE-VSC-ICM UNICOS Vacuum Objects Specifications Review Sebastien Blanchard TE/VSC Interlocks,
Steve Lewis XTOD Controls FDR 13 March 2008 XTOD Vacuum Controls Final Design Review Steve Lewis/Keith Kishiyama 13 March 2008.
1 BROOKHAVEN SCIENCE ASSOCIATES Introspection Control System Group – Bob Dalesio presenting EPICS Meeting May 2, 2009.
Ethernet (EPICS VLAN) IOC Gauge ControllerMass Flow ControllerTurbo Pump Controller Analog and Digital Signals Beamline Gate Valves Mass Flow Unit Turbo.
Stephen Schuh Vacuum Controls Hardware 27 February 2006 LCLS Vacuum Controls Hardware Meeting 27 February 2006.
AdV VAC design meeting Cascina, 19 July Agenda first discussion about vacuum design of central area - and pickoff chamber design in particular -
Transport Layer To provide reliable process to process data delivery and recovery. Unit is segments. Sessions Layer To establish, manage and terminate.
Vacuum Controls Status MACS week December 2010 PP a-JWA-VacControlStatus.ppt Joachim Wallner 1.
Stephen Schuh Vacuum Controls SCR and 16 November 2005 Vacuum Controls System Concept Review and Preliminary Design Review.
Steve Lewis Gas Attenuator 11 December Instrumentation & Controls Steve Lewis 11 December 2006 LCLS Gas Attenuator Preliminary.
Status of and Installation Plan for DC Gas Control System and Target Work Scheduling Meeting 4 August 2006 PSI W. Molzon, Feng Xiao.
Laser Heater Controls Overview 21 August 2008 Matt Boyes Laser Heater Controls Design Overview EPICS IOC Team Meeting Matt Boyes.
Managed by UT-Battelle for the Department of Energy SCL Vacuum Control System Upgrade Derrick Williams
Steve Lewis Controls: Vacuum 5 April, 2005 UCRL-PRES LCLS Week 5 April, 2005 Steve Lewis Vacuum Standards.
Isabelle Laugier, AT/VAC/ICM Section May 6 th 2008 LHC Vacuum Control system.
LCLS Control Group FAC – 06 Installation October 27/28, Plans for 2006 Installation October 27, 2005 Installation.
April 2005OLAV Workshop Diamond Vacuum Controls Hugo S Shiers.
Krzysztof Radwan, PJAS, TE/VSC/ICM Interlocks, Controls and Monitoring Section HIE-ISOLDE Vacuum Controls INSTALLATION.
Central vacuum valve in ALICE Pros and Cons ALICE TC –
MICE Project Progress Update Power Converters Rack housing MQ1 to MQ3 magnet power converters –Marshalling for all other quadrupole & dipole units –Houses.
ESS Vacuum Standardization
RAMI Paul Aden. RAMI Analysis Reliability Visual inspection during each shutdown Service schedule for necessary components Majority of components to have.
LEDA Vacuum Interlocks Bob Dalesio. Outline Leda vacuum system – displays and interfaces PLC Interlocks as presented to the operator EPICS interlock to.
S A Griffiths CM42 June 2015 Electrical & Control.
WBS 1-7 System Assembly & Installation John Voirin August 10-11, 2011.
SANE Magnet Review ● Repaired polarized target magnet was successfully energized and put in persistent mode on 12/18/08 after the review, following the.
Cryoplant Controls Installation
Cryomodule test stand at ESS site
LEDA Vacuum Interlocks
Sub-system integration for the VBOX
BA6 – crab cavity activities in EYETS
News about the WA104 Programme
XFEL Vacuum System Commissioning
SC1R Cold Box PDR Controls
EPICS Controls Steve Lewis 13 December 2007
Undulator System Installation
LCLS Cavity BPM Electronics Undulator Week January 22, 2008
Cryoplant Installation Design Summary
BLM planning 03/03/2014.
LTU/Undulator Installation Status
Magnet PS Controls Hardware Status
Undulator Vacuum System
LERF Readiness Review Kevin Jordan
Testing Plan and Status
e-Beams Systems Update
Magnet Controls K. Luchini
KAGRA PLC System Overview
DOE Review 11 May 2005 Stephen A. Lewis
LCLS Undulator System Production Management
LTU/Undulator Installation Status
DOE Review 7-9 February, 2006 Steve Lewis
Control System Overview Hamid Shoaee LCLS Control System Manager
Hilko Spoelstra, Vacuum Group Specialized Technical Services / AD
Undulator Integration Test Status
LCLS Machine Protection System
Vacuum Controls Stephen Schuh Tom Porter 25 October 2006
Vacuum Control System for Monolith Vacuum
LCLS Control System Personnel Linac & BC2 Controls progress
KFA10 status 20/05/2019 Currently:
DOE Review 11 May 2005 Stephen A. Lewis
J. Fleiter, S. C. Hopkins, A. Ballarino
Undulator Hall Power Dissipation
Presentation transcript:

Undulator Vacuum System 6 Gauge Pairs (6 Cold Cathode + 6 Pirani) 33 Ion Pumps (one per undulator segment) 4 Pneumatic Valves (one at each end, two in middle)

Undulator Vacuum Schedule 09/2007-11/2007: Make rack profiles, specify cables (done) 12/2007-01/2008: Order equipment (done) 01/2008-06/2008: Receive equipment 05/2008-07/2009: Install cables 07/2008: Load and install racks 07/2008-08/2008: Terminate cables 07/2008-09/2008: Test system 09/2008: System ready (See next slide for detailed schedule)

Wire Position Monitor / Hydrostatic Leveling System WPM/HLS is a standalone system. Controls interface required. EPICS soft IOC already set up to read status from HLS system at SPEAR (S. Allison) Will need to set up another soft IOC for LCLS WPM/HLS system. Modify the SPEAR IOC. Very little work.