IT Wiring 综合布线.

Slides:



Advertisements
Similar presentations
Network Design Issues Design and Documentation Prepared by: Aline L. Mendoza.
Advertisements

Chapter 3: Planning a Network Upgrade
Antonio González Torres
Objectives: Chapter 9: Data Centre Architecture VLAN definition and benefits * VLANs and broadcast domains * Routers role in VLANs * Types of VLANs * VLANs.
Total HVAC Control from anywhere Easy control that can save a fortune
Poseidon 4002 Rack monitoring 1. Poseidon: Monitor & Control 2.
André Augustinus 16 June 2003 DCS Workshop Safety.
Mark Heggli Consultant to the World Bank Expert Real-time Hydrology Information Systems Workshop Module 4: Data Management Solutions for a Modernized HIS.
Network Engineering Taster Day Mark Clements. 30 March 2012Engineering Taster Day 2 Welcome to Engineering Taster Day: Morning Session Ambassadors Fire.
Remote Monitoring and Management Solutions ®
Telenor Tier 3 Data Center April About Telenor Tier 3 Data Center Telenor built it´s own Data Centar in accordance with the latest industrial standards.
Founded in 2007 by George Lichtblau Former GE IFS Team Based in Danbury, CT Focused on Made in America Doing it right Rooted in Security “Old School”
Cisco – Semester III Documentation. What is it most important component of a good network?  Documentation.
Robert L Renshaw, Jr.. Campus Layout Project Specifications Design a wiring plan and Networking/Internetworking solution for an Ethernet extended star.
NETWORK DESIGN Customer requirements Network topologies Cable choice Hardware TSB 75 TSB72.
1 Fiber Optics FIBER OPTIC PATCH PANELS. 2 Fiber Optics Just like our copper cable plant the fiber cable plant incorporates many of the same hardware.
How to Build a CAN Last Update Copyright Kenneth M. Chipps PhD 1.
Campus Network Infrastructure Bangladesh University of Professionals(BUP) Prepared By: Mazharul Islam Tuhin.
Ferndale Electric Company Project overview from September 2007 to present.
Dependencies on NETS Presented by UCAR Technical Security.
ACCOUNTABILITY shouldn’t mean working 24/7.
1 PAC530 | Output Controller. 2 The Output Controller (PAC530) provides the local connection on an RS-485 network between an Access and Alarm Server (PAC500)
Cisco Threaded Case Study
HORIZONTAL SUBSYSTEM. CABLING SYSTEM Horizontal Subsystem The Horizontal cabling subsystem is the part of the Signamax Cabling System that extends from.
1 Guide to Network Cabling Fundamentals Chapter 5.
Hardware Training Product: ITMS2.
Power Protection for Voice over IP, and other new, Mission-critical Network Applications wBrad Amano Market Segment Manager MGE UPS SYSTEMS.
Design and Documentation Chapter 8. Network Design Issues Your first step in the process is to gather information about the organization. This information.
1 Welcome to Chunghwa Telecom International Group’s Internet Data Center International(Internet) Data Center – Co-Lo TWGate (Taiwan Gateway) – IP Transit.
IP Surveillance Solution & Products Introduction
© 2007 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.1 Planning a Network Upgrade Working at a Small-to-Medium Business or ISP – Chapter.
Ipswich City Precinct. 6. ICC Precinct Installation Standards & Regulatory Compliance ICT Infrastructure Integration & Convergence 1. Pit & Pipe Underground.
04 Teknologi Pusat Data Data Center Design Best Practice
1 Figure 2-6: Building Security Building Security Basics  Single point of (normal) entry to building  Fire doors, etc.: use closed-circuit television.
Presentation on TCS By : 1. Ershad Islam 2. Maung Han Soey 3. Shaon Shahriar 4. Ahsanul Haque.
Threaded Case Study of Bangladesh Internet Press Ltd. (BIPL) By: Md. Ikbal Zavid Abul Kalam Asad Supervise By: Debanon Datta Legal Main Contact, CNAP Ahsanullah.
DIVISIONSPECIFICATION INPUT POWER DC 24V / 1.25A ※ Power supply from the floor distributor is not available. MAX POWER CONSUMPTION Max 30W VOICE CONVERSATION.
Physical Security Concerns for LAN Management By: Derek McQuillen.
Introduction to IP Cameras Over Coax. Replacing Analog Cameras With IP Cameras Over Coax Analog Camera RG59U Coaxial Cable 18/2 Power Cable Low Voltage.
© 2007 Cisco Systems, Inc. All rights reserved.Cisco Public ITE PC v4.0 Chapter 1 1 Planning a Network Upgrade Working at a Small-to-Medium Business or.
West Cambridge Data Centre Ian Tasker Information Services.
EGEE is a project funded by the European Union under contract IST HellasGrid node hosting requirements & SLA Nektarios Kozyris - Christos Aposkitis.
Physical Security at Data Center: A survey. Objective of the Survey  1. To identify the current physical security in data centre.  2.To analyse the.
U-PROX SMART HANDLE Fully incorporated Wireless Handle and Furniture Locking Set.
LOGO Electronics security ING. El Kalamouni Samer.
CANOVATE MOBILE (CONTAINER) DATA CENTER SOLUTIONS
Industrial 1-Port 802.3at PoE+ to 2-Port 802.3af PoE Extender
An overview of the major components
Poseidon 4002 Rack monitoring.
CMV-NET Chigo VRF Network Centralized Control System
1-Port Ultra PoE to 4-Port 802.3af/at Gigabit PoE Extender
IP-based 8-port Switched Power Manager
Maintain, Manage And Monitor Outdoor Systems Remotely
Product Introduction --AP Controller M3 Yaojun 26/12/2015
Industrial Ethernet Solution
Industrial Ethernet Solution
Data Center Service Brian Messenger 11/15/2016.
Data Management Solutions for a Modernized HIS
IT Set-up Plan Corporate Process Innovation Dept. Date: June 2014
Mobile Cellular Communications System
CORPORATE PROFILE JUNE 2016
Application # 1: Networking with DSL
Module 5 - Switches CCNA 3 version 3.0.
HELIOS AMX5000 Minimax GmbH & Co. KG © Minimax 2009.
Physical Security.
Total HVAC Control from anywhere Easy control that can save a fortune
Data Centre Environment

Fiber Optic Media Converter Unit
Presentation transcript:

IT Wiring 综合布线

Agenda Overview Background and Requirement System Design Project Schedule BOM and Product Introduction ITR Brief Introduction

Aerial View of New Plant of EUROIMMUN Overview EUROIMMUN is planning to build a new plant in Tianjin China. The whole of IT infrastructure is scheduled to design in two stages. Stage I: Main parts of IT infrastructure that include but not limited to IT Room, CCTV System, Access Control System, Electric Fence and Backbone of Cabling System. Stage II: Rest parts of IT infrastructure that include but not limited to Data Network System, Wireless Network System, Communication System and Rest Parts of Cabling System. Goal The foundation of IT infrastructure must be done in Stage I, the security men can be working. Aerial View of New Plant of EUROIMMUN

Agenda Overview Background and Requirement System Design Project Schedule BOM and Product Introduction ITR Brief Introduction

The Whole of Layout of New Plant There are four areas in this new plant which include Parking, Office, Workshop and Warehouse. : Guard room : Parking Area : Office Building Area : Workshop Building Area : Warehouse Area Note: Warehouse Area is not included in this design.

Sectional Elevation of New Plant Outdoor 1.Parking Area Indoor 1.Guard Room - Total of one room. 2.Office Building Area - Total of five floors. - Total of 13110m2, each floor is 95m x 27.6m. - Each floor high is 5m. 3.Workshop Building Area - Total of two floors. - Total of 10868m2, each floor is 96m x 56.6m. 4.Warehouse Area - N/A.

Layouts of Office and Workshop Areas Office Building Area - F1 & Workshop Building Area - F1 Office Building Area - F2 & Workshop Building Area - F2 Office Building Area - F3 & Workshop Building Area - F2 Roof Office Building Area - F4 Office Building Area - F5

Requirement EUROIMMUN requested for proposal of IT infrastructure for all areas except warehouse in this project. This request is only for Stage I. IT infrastructure consists of seven parts in Stage I. IT room building CCTV system Access control system Cabling system (Backbone and used for CCTV & ACS) Raceway of Cabling system Network system (Used for CCTV & ACS) Electric fence system

Agenda Overview Background and Requirement System Design Project Schedule BOM and Product Introduction ITR Brief Introduction

Overview of Design Based on requirements of Stage I, we have designed the whole of IT infrastructure including seven parts as below: 1.1 Decoration 1.2 Power supply 1.3 UPS 1.4 Air-condition 1.5 EMS 1.6 Fire protection IT Room Building 2.1 IP cameras 2.2 Video 1080p 2.3 Two months records CCTV System 3.1 IP controllers 3.2 Fingerprint + IC reader Access Control System 4.1 Cat6 UTP 4.2 Backbone: ring + star 4.3 Backbone: 10G OM3 multimode fiber Cabling System 5.1 Up-line pulling 5.2 Galvanized metal raceway Raceway 6.1 Two layers 6.2 Single 1G multimode fiber uplink 6.3 100M RJ45 port POE access Network System 7.1 Alloy cable 7.2 Six-line fence Electric Fence System 01 02 03 04 05 06 07

1 IT INFRASTRUCTURE (STAGE I) IT Room Building

Overview of Design of IT Room Building IT room as MDF is located at fourth floor in Office Building Area. IT room is about 50m2. The IT room building consists of six parts as below: Decoration. Power supply. UPS. Air-condition. EMS. Fire protection. IT Room

Design of Layout and Decoration Main components include: Brand: All local. Ground Wall Raised floor Ceiling Lighting Door Layout Example Ground Wall Raised Floor Ceiling Lighting Door

Design of Power Supply Power Supply Main components include: Brand: Almost all local, only breakers are Schneider. Power distribution box x 1 - Voltage: 380V in, 380V out - Current: 300A in, 250A out Output breaker - 63A x 4 (for Air-condition) - 32A x 3 (for UPS) - 16A x 18 (for Rack) - 10A x 6 (for Normal) PDU - 8 ports, C13-C14, 10A - Two PDU for each rack

Design of UPS UPS Main components include: Brand: Emerson. 150KVA modular UPS x 1 (30KVA modules in Stage I) Battery box x 1 12V/120AH battery x 32 (1 hour backup time) SNMP management card x 1 Note: We recommend that all of UPS and Batteries must be placed at first floor because of the over-weight.

Design of Air-Condition Main components include: Brand: Emerson and Dakin. Primary AC x 1 - Emerson - 30KW wind cooling - Constant temperature and humidity - Down-supply air - Auto reboot when repower Standby AC x 1 - Dakin - 8.5KW (3P) wind cooling - Horizontal-supply air Note: We recommend that all of outdoor units of air-conditions must be placed at first floor because of the water-leakage.

Design of EMS EMS Main components include: Brand: Emerson. Monitoring appliance x 1 Temperature & Humidity sensor x 6 Fluid sensor x 4 Alarm: E-mail, SMS, acousto-optic

Design of Fire Protection Main components include: Brand: Local. FM200 x 1 Heptafluoropropane gas x 128KG Optical smoke detector x 2 Heat detector x 2 Alarm: Acousto-optic

2 IT INFRASTRUCTURE (STAGE I) CCTV System

Main roads & Parking (outdoor) Overview of Design of CCTV System CCTV system is designed for “office building”, “workshop building” and “outdoor” areas. All IP cameras with 1080P that they are monitoring key areas as below: Office and Workshop buildings The in/out doors (Gun camera) Elevators (Dome camera) Outdoor Parking and main roads (PTZ camera) Fences (Gun camera) All cameras of the in/out doors of workshop building are working with passenger flow statistics server. These cameras can collect passenger flow to help making analysis. All cameras of fences can set up the virtual fences that could automatically alert to guards if someone moves into the virtual fences. Area Dome Camera Gun Camera PTZ Camera Office 3 55 Workshop 22 Main roads & Parking (outdoor) 9 Fences (outdoor) 24

Design of CCTV System CCTV System Main components include: Brand: Either Hikivision or Dahua. IP camera (powered by POE switch) - 1080p, 300W pixels - Dome camera x 3 - Gun camera x 101 - PTZ camera x 9 64-line NVR x 2 6T HDD x 32 (2 months records by H.265) Passenger flow statistics server x 1 Management software x 1 6-screen 22’’ TV wall x 1 Alarm: E-mail, screen popup, acousto-optic Note: All monitors and NVRs are authorized to place at guard room by EUROIMMUN administrator.

Camera Layout (Key Area Point) Office Building Workshop Building Outdoor Face to IT room Elevator The in/out door Parking and Main road The in/out door Fence

Camera Layout (All) Office Building - F1 Office Building - F2 Workshop Building - F1 Workshop Building - F2 Office Building - F4 Outdoor Office Building - F5

3 IT INFRASTRUCTURE (STAGE I) Access Control System

Overview of Design of Access Control System Access Control system (ACS) is designed for “office building” and “workshop building” areas. All controllers that they are managed by IP and controlling key areas as below: Office and Workshop buildings The in/out doors Note: Not designed for IT room. All readers include both of IC and fingerprint identification functions. Each portal with double door, our design is as below: - Single door controller x 1 - Double door electromagnetic lock x 1 - Reader x 1 (for in) - Button x 1 (for out) Area Controller Reader Office 17 Workshop 9

Design of Access Control System Main components include: Brand: ZKTeco. Single door controller x 26 Double door electromagnetic lock x 26 Reader x 26 (IC and fingerprint identification) Button x 26 Management software x 1 Card issuing x 1 Alarm: E-mail

Reader Layout (Key Area Point) Office Building Workshop Building The in/out door The in/out door

Reader Layout (All) Office Building - F1 Office Building - F2 Workshop Building - F1 Workshop Building - F2 Office Building - F4 Office Building - F5

4 IT INFRASTRUCTURE (STAGE I) Cabling System

Overview of Design of Cabling System Cabling system is designed for CCTV system, Access Control system and backbone between MDF and IDFs. Total number of cabling points of CCTV and ACS is 139. MDF x 1 (located at fourth floor in Office building) IDF x 8 (five in Office building, two in Workshop building and one in Guard room) Cabling system consists of five subsystems: Working area subsystem Horizontal area subsystem Equipment area subsystem Administration area subsystem Vertical area subsystem Working area, Horizontal area, Equipment area and Administration area subsystems: All cabling points are Cat6 UTP. Vertical area subsystem: Backbone between MDF and IDFs: uses Ring + Star structures, 12-core 10G OM3 multimode fiber. Star structure is designed to redundant link 1+1.

Door Access (double reader) Cabling Points Statistics IDF# Area Qty of Point IDF1 - F1SR Camera (Gun Camera) 8 Camera (dome Camera) 3 Door Access (double reader) IDF2 - F2SR 10 IDF3 - F3SR 2 IDF4 - F4SR IDF5 - F5SR 19 IDF6 - P1SR 13 IDF7 - P2SR 9 1 IDF8 - Door Guard 24 Camera (PTZ Camera) Total 139

Cabling Topology

Design of UTP of Cabling System Main components include: Brand: Leoni. All Cat6 RJ45 information module x 139 2-port faceplate x 139 X86 box x 139 2m patch cord x 300 UTP x 42boxes (305m per box) 24-port patch panel x 9 Cable management x 9 42U rack x 9 (7 in IDFs, 2 in MDF) 12U rack x 1 (wall-mounted, 1 in IDF of 5th floor)

Design of Backbone of Cabling System Main components include: Brand: Leoni. Fiber - 1/10G OM3 multimode - 12-core - 3450m length 48-core LC patch panel x 13 Cable management x 13 3m LC patch cord x 30

Design of Fiber for Outdoor CCTV Main components include: Brand: Leoni. For 24 of fence cameras Fiber - 1/10G OS2 singlemode - 6-core - 2000m length 48-core LC patch panel x 1 Cable management x 1 3m LC patch cord x 50 Fiber-to-RJ45 adapter x 48

5 IT INFRASTRUCTURE (STAGE I) Raceway

Design of Raceway Raceway Main components include: Brand: Cablofil and Local. For IT room - Up-line pulling - Cablofil, galvanized metal, mesh - 300Wx100H - 30m length For horizontal area - Local, galvanized metal, enclosed - 1665m length

Raceway Layout Office Building - F1 Office Building - F2 Workshop Building - F1 Workshop Building - F2 Office Building - F4 Office Building - F5

6 IT INFRASTRUCTURE (STAGE I) Network System

Overview of Design of Network System Network system is designed for CCTV and Access Control systems. It consists of two layers: Core switch Access switch All access switches are POE switches which be used for accessing IP cameras and IP controllers, and could be powered to IP cameras. Star structure, single core switch, single 1G multimode fiber uplink, 100Mbps RJ45-port access.

Network Topology

Design of Network System Main components include: Brand: Cisco. Core switch x 1 - Layer 3 - All ports are 1G - 24-port SFP Access switch - Layer 2 - RJ45 port access (100M), SFP port uplink (1G) - PoE - 24-port switch x 7 - 48-port switch x 1 1G multimode fiber module x 16 1G RJ45 port module x 8

7 IT INFRASTRUCTURE (STAGE I) Electric Fence System

Design of Electric Fence System Main components include: Brand: Yanrong. Alloy cable x 4800m Six-line Every 75m per zone Main controller x 1 Management software x 1 Electric fence 2-zone controller x 6 Electric fence 1-zone controller x 3 Warning sign x 120 Alarm: Acousto-optic

Agenda Overview Background and Requirement System Design Project Schedule BOM and Product Introduction ITR Brief Introduction

Project Schedule 1 day 30 days 30 days 5 days 1. Sign contract. 2. Order and delivery equipment. 3. Installation, configuration and testing. 4. Acceptance

Agenda Overview Background and Requirement System Design Project Schedule BOM and Product Introduction ITR Brief Introduction

BOM Please see the appendix.

Product Introduction Please see the appendix.

Agenda Overview Background and Requirement System Design Project Schedule BOM and Product Introduction ITR Brief Introduction

Overview China’s largest and oldest IT turnkey solutions provider, long-term IT-partner in China, for the design, implementation, and ongoing maintenance of their physical IT systems: Server & Networking Data Center Structured Cabling Physical Security IT Workplace Management Voice Systems Audio-Video

IT Group

Thank You