LARP Phase II Secondary Collimator RC-0 and RC-1

Slides:



Advertisements
Similar presentations
CIEMAT technological contributions to linear colliders Fernando ToralGandía, 3/12/2005.
Advertisements

Coll Eng E Doyle 1/18 LARP Phase II Secondary Collimator RC1 Prototype Engineering Status 6/21/06 Jaw-hub-shaft concept - continued Permanent.
4m Undulator Design Concepts Amanda J Brummitt CCLRC RAL On behalf of the HeLiCal Collaboration.
Status of the LARP Phase II Secondary Collimator Prototype 30 September 2013 LHC Collimation WG Meeting Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US.
Status of the LARP Phase II Secondary Collimator Prototype 14 October 2013 LHC Collimation WG Meeting Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US LHC.
SLAC rotating collimator for HiRadMat beam tests 14 March 2014 S. Redaelli, A. Bertarelli, CERN T. Markiewicz, SLAC US LHC Accelerator Research Program.
LARP Rotatable Collimator Prototype Assembly completed and all mechanical tests successful: Cooling tubes now twist, under vacuum, as jaws turn, with R~1.
LARP Rotatable Collimator Prototype Assembly completed and all mechanical tests successful: Cooling tubes twist, under vacuum, as jaws turn, with R~1 m.
LARP Rotatable Collimator Prototype Assembly completed and all mechanical tests successful: Cooling tubes twist, under vacuum, as jaws turn, with R~1 m.
LARP Rotatable Collimator Prototype Assembly completed and all mechanical tests successful: Cooling tubes now twist, under vacuum, as jaws turn, with R~1.
MECHANICAL DESIGN OF TCSP COLLIMATORS Secondary Collimators Embedding BPMs L. GENTINI, A. Dallocchio, A. Bertarelli, F. Carra, M. Garlasche.
LHC Phase II Collimator teleconference - 4 March 2008LHC Rotatable Phase II Collimators 1 beam LARP Phase II collimator Progress and Plans 4 March 2008.
PETS EuCARD. Present status and precision assembly L. Sánchez, F. Aragón, J. Calero, J.L. Gutiérrez, E. Rodríguez, F. Toral, CIEMAT 26/10/2011.
1 LARP Phase II Secondary Rotatable Collimator Evolution of design changes 3 rd March, 2010.
Engineering Department ENEN Status of TCSP manufacturing Collimation Working Group (CWG) 24 June 2013 A. Dallocchio, A. Bertarelli, F. Carra, L. Gentini,
LHC Phase II Collimator Compact jaw simulations New FLUKA => ANSYS mapping scheme New 136mm x 950mm jaw –60cm primary collimator –Helical cooling channel.
LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 06 June 2006 No 1 /17 LARP Phase II Secondary Collimator RC1 Collimator Test Program Plan Forward Revised.
LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 16 May 2006 No 1 /22 LARP Phase II Secondary Collimator RC1 Collimator Test Program Revised 5/15/06.
SLAC RC Status Report 30 August 2010 LHC Collimation Working Group Meeting Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US LHC Accelerator Research Program.
SLAC R&D Mtg November 2007LHC Rotatable Phase II CollimatorsSlide # / 17 beam LARP Rotatable Collimators for LHC Phase II Collimation 12 November.
LARP LHC PHASE II COLL RC1 - S. Lundgren 1 April 2009 No 1 /6n LARP Phase II Secondary Collimator RC-1 Mechanical Design Review 01/04/09.
The Stripping Foil Test Stand in the Linac4 Transfer Line
Main features of PETS tank J. Calero, D. Carrillo, J.L. Gutiérrez, E. Rodríguez, F. Toral CERN, 17/10/2007 (I will review the present status of the PETS.
Lavs Issues Lav 12. Tube Planning future activities. Conclusions.
Collimation Overview 28 October 2008 LARP CM11, Fermilab Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US LHC Accelerator Research Program 1)Short Status.
LARP LHC PHASE II SECONDARY COLLIMATOR CD1 REVIEW. - E. Doyle 15 Dec /25 LARP Phase II Secondary Collimator RC1 Review SLAC 12/15/05 Prototype Engineering.
LHC Collimators Phase 2 - Visit to Plansee 28th August Materials for Phase II collimators.
LARP Rotatable Collimators for LHC Phase II Collimation 09 July 2007 SLAC R&D Status Meeting Gene Anzalone, Eric Doyle, Lew Keller, Steve Lundgren, & Tom.
SPHENIX MECHANICAL D. Lynch September 11, AGENDA Global Design Concept – Updated Global Assembly Concept – Updated Inner HCal Installation concept.
A. Bertarelli – A. DallocchioWorkshop on Materials for Collimators and Beam absorbers, 4 th Sept 2007 LHC Collimators (Phase II): What is an ideal material.
LARP Rotatable Collimators 19 June 2006 ILC R&D Status Meeting Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US LHC Accelerator Research Program.
LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 30 Jan 2007 No 1 /13 LARP Phase II Secondary Collimator RC1 Collimator Development and Test Program Status.
LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 10 Dec 2007 No 1 /12 LARP Phase II Secondary Collimator RC1 Collimator Development and Test Program Status.
LARP LHC PHASE II COLL RC1 - S. Lundgren 21 Sep 2009 No 1/17 LARP Phase II Secondary Collimator RC-1 Collimator Development Status and Outlook Revised.
Summary Session Advanced Collimation CARE-HHH-APD BEAM'07 R. Assmann.
1 SLAC RC Status Report 19 July 2010 LHC Collimation Working Group Meeting Jeff Smith/SLAC BNL - FNAL- LBNL - SLAC US LHC Accelerator Research Program.
Prototype Cryomodule FDR Ken Premo 21 – 22 January 2015 High Power Coupler Design.
LARP Phase II Secondary Collimator Status Report SLAC ILC R&D Summary Meeting 24 April 2006 T. Markiewicz/SLAC.
First Wall Panel - Overview
News and Introduction from CERN June 15th, 2005
LARP Phase II Secondary Collimator RC1, ETC - Status 4/10/06
Status of material tests
BSS Prep work at CERN and Acceptance of Parts
LARP Phase II Secondary Collimator RC1
Complementary ISTC Projects #3888, 3889p
Progress and Issues with VTS Upgrade
LARP Phase II Secondary Collimator RC1
LARP Phase II Secondary Collimator RC1
Preliminary Y-chamber specifications – First draft
LARP Phase II Secondary Collimator RC1 Review SLAC 12/15/05 RC1 Construction and Test Plan LARP LHC PHASE II COLL REVIEW – RC1.
LARP Phase II Secondary Collimator RC-1
Far Detector Activities Late 2017 – Early 2018
Recommendations of 12/16/05 review committee & SLAC response
23 April 2012 Tom Markiewicz/SLAC
¼ meshed models for Omega3P calculations
Brief Status Report on Fabrication of ATF2 Quads
LARP Phase II Secondary Collimator RC1
Phase II Collimators : design status
LARP Phase II Secondary Rotatable Collimator
LARP Phase II Secondary Rotatable Collimator
LARP Phase II Secondary Rotatable Collimator
LARP Phase II Secondary Collimator RC-1
LARP Phase II Secondary Collimator RC-1
LARP Phase II Secondary Collimator RC-0 and RC-1
LARP Rotatable Collimators for LHC Phase II Collimation
LARP Phase II Secondary Collimator RC-1
Micro Status Report of SLAC Phase II Plan Tom Markiewicz SLAC
Possible Methods for Reducing the Trapped Mode Effect in the SLAC Rotatable Collimator for the LHC Phase II Upgrade Liling Xiao 1.
Engineering Update E. Doyle 5/16/06
US LHC Accelerator Research Program
Presentation transcript:

LARP Phase II Secondary Collimator RC-0 and RC-1 Collimator Development Status Revised 01/29/09 LARP LHC PHASE II COLL RC1 - S. Lundgren 29 Jan 2009 No 1 /5

RC-1 Status 1st Mandrel is currently being machined @ local vendor w/promised delivery early February. 1st Hub has been partially machined and is awaiting Mandrel ID dimension for subsequent plating and final machining to meet the tolerances required for brazing. 1st Shaft Assembly is planned for brazing in early February. 1st Mandrel/Coil Assembly is planned for winding in late February. Drawing package of remaining machining operations for 1st RC -1 Jaw Assy. will be released for quotation next week. 2 more Half Shafts arrived @ SLAC. The 2 remaining Shafts are still due from vendor. No promise date yet. Glidcop for the Jaws is delayed @ vendor. Promised delivery mid-March!! LARP LHC PHASE II COLL RC1 - S. Lundgren 29 Jan 2009 No 2 /5

Tank design concept defined Tank constructed from a standard 355.6mm dia. x 6.35mm wall type 304 Stainless Steel pipe. Combining the CERN bellows/tank base plate design with a modified pipe seems to make the most sense for us at this time. With the top portion of the pipe cut away, the collimator Jaws are installed. A water-cooled cover plate is then welded in. This cover geometry reduces the tank c-x to nearly rectangular (in the proximity of the Jaws) and should substantially lower the tank “Q”. Simulation of the fully cylindrical geometry previously proposed showed unreasonably high “Q” and heat load Weld-in cover will also contain view ports for observing Jaw facet damage. Flanges on each end provide access to the RF foils, end supports and ratchet mechanisms after the appropriate cool down period. LARP LHC PHASE II COLL RC1 - S. Lundgren 29 Jan 2009 No 3 /5

90 Degree Collimator orientation used for Robustness Test Existing CERN Cross Roller Dives with upgraded motors Existing CERN Interface Plate & Stand Use 90 Degree orientation in LHC Tunnel ? LARP LHC PHASE II COLL RC1 - S. Lundgren 29 Jan 2009 No 4 /5

Main Constraints Transport Stay Clear 1406mm 394mm 503mm Survey LARP LHC PHASE II COLL RC1 - S. Lundgren 29 Jan 2009 No 5 /5