UNC Modification Proposal 0116 Reform of the NTS Offtake Arrangements Transmission Workstream 5 th October 2006.
Advertisements

Moving the QSEC and AMSEC Auctions National Grid NTS, Transmission Workstream.
Capacity trade and transfer mechanism and the next AMSEC auction Nienke Hendriks Head of Gas Transmission Policy, Enforcement and Compliance 9 May 2007.
Proposer: Matthew Hatch Panel Date: 15 th May : EU Capacity Regulations – Capacity Allocation Mechanisms with Congestion Management Procedures.
Changes to the Network Emergency Co-ordinator (NEC) Safety Case resulting from Exit Reform UNC Workgroup 0412 Meeting – 1 st March 2012.
UNC Proposal 329 – Review of Industry Charging & Contractual Arrangements - DM SHQs and DM SOQs Joel Martin – 21/09/10.
DNPC06 LDZ NEC Charges Denis Aitchison 25 th January 2010.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Enduring Exit Regime & NTS Risk Management Processes Offtake Arrangement Workstream – OAD Section I Review Group 316.
NTS Exit Regime Transmission Workstream – 6 th July 2005.
DN Interruption Reform Transmission Workstream Mark Freeman 5 th April 2007.
Stuart Forrest, Network Planning Manager, Scotia Gas Networks 19 th October 2010 MOD Review of Industry Charging & Contractual Arrangements in Relation.
Transitional offtake arrangements – Ofgem Initial Proposals on transitional incentives 6 October 2005.
Transmission Workstream 6 January 2011
Supply Point Capacity BSSOQ and Supply Point ratchets
Workgroup meeting October 2014
Distribution workstream 29th January 2009
Transmission Workstream February 2009
SGN Modification Proposal Amendments to UNC TPD OCS Process Long Term Allocation of Capacity for the Transitional Period.
Consideration of issues raised by UNC Modification Proposal 0244
Modification Proposal 0283 Update
Transmission Workgroup 7th July 2011
Code Governance Review UNC Modification Proposals
Mod 186 Report Assumptions for 2013 DCMF 26 January 2009
Transmission Workstream 4th July 2007
UNC Trader User – Licence obligations
UNC 0407 Analysis Scope - Update
Proposer: National Grid NTS Panel Date: 17th April 2014
Capacity Methodology Statements: Impact of Mod 452
Amendment to NEA & NExA Measurement Provisions Change Process
Capacity Methodology Statements
2 hour / 5% Rule Bethan Winter.
Simon Trivella – 22nd May 2008 Distribution Workstream
0332 – Impact of combining the Entry and Exit Capacity credit processes Chris Shanley.
Operating Margins (OM) Consultation
UNC Modification Proposal “Allocation of Daily NTS Entry Capacity Within-Day” Richard Fairholme.
7th July 2011 Transmission Workgroup - Elexon
Publication of Zonal Flex Data
Update on Exit Capacity Substitution and Revision
Review of Physical Regime Times for Modification Proposal 461
0350 – Combining the NTS entry capacity and exit capacity credit checks Chris Shanley.
Supply Point Capacity BSSOQ and Supply Point ratchets
Simon Trivella –5th May 2011 Transmission Workgroup - Elexon
Modification Proposal 0101 – “Amendment to demand forecasting timings in relation to the Gas Balancing Alert”
Review Group 166 End User Perspectives 20 September 2007 Julie Cox.
Flow Swaps at NTS / LDZ offtakes
DN Interruption & Charging
Review Group 0175: DM Supply Point Emergency Arrangements
Long Term Non Firm Capacity Update
Interruptible to Firm – NTS Supply Point Transition
Review Group /09/2007.
UNC Transmission Workstream 7th December 2006
Wales & West Utilities Mod 0671 User Commitment
Proposed Transitional Gas Exit Arrangements
Revised Tender Timescale for DN Interruption Arrangements
Mark Freeman 29th January 2007
Entry Overrun Calculation
Provision of Interruption Information by DNOs to Transco NTS
Modification Proposal Amendment of IUK’s Minimum Wobbe Limit
Information Provision for Transitional Exit Capacity
Transmission Workstream DN Interruption Update - Introduction
Workgroup meeting October 2014
Stefan Leedham Transmission Workstream 2nd November 2006
Gemini Code Contingency Review
195AV “Future work” – system flexibility
Transmission Workstream, 1 Mar 07
Revised Tender Timescale for DN Interruption Arrangements
Transmission Workstream 05 November 2009
Gas Customer Forum 28 July 2008
Off-peak interruptible service to compliment universal firm/buy-back regime Peter Bolitho.
Presentation transcript:

Reinstatement of NTS Interruption 6th November 2008

Background Modification Proposal 0090 “Revised DN Interruption Arrangements” removed existing DN and NTS Interruption arrangements from October 2011 Enduring arrangements for NTS Interruption from October 2011 were to be set out in Mod 0116 “Reform of the NTS Offtake Arrangements” Competition Commission ruling on the approval of 0116V has delayed the start of the enduring NTS regime There is therefore no access to NTS Interruption beyond October 2011

Impact of the Inability to Access NTS Interruption All NTS Interruptible load effectively goes Firm Significant additional transportation capability would be required Timescales to construct this capability are insufficient GNCC would be unable to use NTS Interruption to manage system constraints Use of Operating Margins gas or entry capacity buybacks may be less economic than Interruption Efficiency of the operation of the Total System may be reduced Increased probability of a constraint leading to a Network Gas Supply Emergency

Proposed Next Steps Raise a Modification Proposal to change the UNC Transitional Document Section IIC to retain the ability for National Grid NTS to access NTS Interruption beyond October 2011 Use of NTS Interruption as an economic and efficient commercial tool for constraint management can continue until alternative tools are introduced through Exit Reform