P17452 Dresser-Rand System Health Monitor Detail Design Review

Slides:



Advertisements
Similar presentations
P08027: Winter Quarter Schedule Week 1: Submit IRB test request Week 4: Completion of IRB Test GUI Week 6: Begin IRB testing MSD 2: Prototype Construction.
Advertisements

Ninth Lecture Hour 8:30 – 9:20 pm, Thursday, September 13
MapleLeaf, LLC SDLC Methodology. MapleLeaf, LLC, has established standard phases and processes in regards to project management methodologies for planning.
Team Advisor: Professor Marinos Vouvakis Douglas Imbier EE Team Leader wireless, sensors Edmons Zongo EE Treasurer display, sensors Nicholas Ferrero EE.
Team Thermasense Thermal Wireless Sensor. Where Does Thermasense Fit In? Re-Entry problems: Space vehicles are heavily instrumented. Wires can introduce.
MSD-II Project Review Modular Motion Tracking Sensors 1.
Design Reviews.1 KGCOE Multidisciplinary Sr. Design Borkholder 2007 R I T Design Reviews Objectives of the Design Review Participants for a successful.
Chapter 3: The Project Management Process Groups
Design Reviews.1 KGCOE Multidisciplinary Sr. Design Borkholder 2006 R I T Design Reviews Objectives of the Design Review Participants for a successful.
P08009 Audible Memo Board Phase II Monday, October 22, 2007 P08009: Audible Memo Board Phase II Sponsor: Tala Hopkins Jon GosligaAudio Output Lead Loic.
ULTRASONIC TRANSMITTER Amanda Hellberg, Brandon Ravenscroft, Jonathan Owen, and Kai Gustafson TEAM B-CDR.
Phase II Review MSD II P Size is too big and not comparable with original testing Hinge is not possible with rapid prototyping, metal hinge would.
UML - Development Process 1 Software Development Process Using UML (2)
RUP Fundamentals - Instructor Notes
1 ISA&D7‏/8‏/ ISA&D7‏/8‏/2013 Systems Development Life Cycle Phases and Activities in the SDLC Variations of the SDLC models.
P14452: SYSTEMS DESIGN REVIEW Take Two. OVERVIEW Updates Engineering Specifications Morph Chart Concepts Development Presentation Selections Action Items.
Automatic Shift Controls for ATV Sponsored by: Joel Notaro Polaris Industries Advised by : Professor George Slack Project Family: Modular, Scalable, Open.
Apply Project Scope Management Techniques Project Scope Processes – Part 2 Certificate IV in Project Management Qualification Code BSB41507 Unit.
ENL1819T Progress Report Confidence in Our Success.
Fifth Lecture Hour 9:30 – 10:20 am, September 9, 2001 Framework for a Software Management Process – Life Cycle Phases (Part II, Chapter 5 of Royce’ book)
PLUG IT IN 6 Project Management. 1.Project Management for Information Systems Projects 2.The Project Management Process 3.The Project Management Body.
FOUR CHANNEL ULTRASONIC RECEIVER TEAM C BRIAN MARKUS (TEAM LEAD) DANNY VISELMAN CHEN JIA.
Optical Heart Monitor / Jump Drive Group 6 Sponsor: Calit2 Mentor: Paul Blair, Ph.D. Team: Kari Nip, Matt Chandrangsu, Jeffrey Chi.
Senior Design SD1107 Solar Module Observation Device Students:Collin Howe, CprE Jacob Rasmuson, CprE Arthur Fiester, CprE Alex Rannow, EE Timothy Fox,
ECE445: The Design Review Sept 2, Documentation Roadmap Request for Approval Proposal Design Review Final Paper &Presentation Sept 10Sept 16Sept.
Validate Scope What we have: Requirement Traceability Matrix Verified Deliverables What we do: Inspection What we get: Accepted Deliverables.
Traumatic Brain Injury Eyewear “TB-Eye” Todd Biesiadecki, Matthew Campbell, Matthew Vildzius ECE4007 L03 EM1 Advisor: Erick Maxwell October 31, 2011.
P16221 – FSAE Shock Dynamometer Preliminary Detailed Design Review November 13, 2015.
Path The purpose of this project is to design a universal data recording device to monitor the health of a Dresser-Rand compressor during operation. In.
MSD II Week 7 Update P13265: Motorcycle Safety Lighting and Portable Electronics Charging System.
P16680: AATech Universal Oil and Bag System System Design Review 9/29/15.
CHAPTER 6 Contract An agreement between parties that defines the benefits and responsibilities for those concerned (client & developer) Why need a contract?
Preliminary Detailed Design Review Group P16228: Mike, Zach, Joe, Elijah & Bernie.
Team-Based Development ISYS321 Managing the Information Systems Project.
Complete Design & Gate Review. Complete Design Detailed Design Review (DDR) 1.“High and medium technical risk” areas –Design Review (Prelim-DDR): standard.
What has been accomplished at the end of MSD 1 & 2?
RUP RATIONAL UNIFIED PROCESS Behnam Akbari 06 Oct
1 Chapter 3: The Project Management Process Groups: A Case Study.
The Project Management Process Groups
Adaptive Software Development Process Framework. Version / 21 / 2001Page Project Initiation 2.0 Adaptive Cycle Planning 5.0 Final Q/A and.
Prof. Shrikant M. Harle.  The Project Life Cycle refers to a logical sequence of activities to accomplish the project’s goals or objectives.  Regardless.
BSBPMG502A Manage Project Scope Manage Project Scope Project Scope Processes Part 2 Diploma of Project Management Qualification Code BSB51507 Unit.
Subsystem Build & Test Review
TK2023 Object-Oriented Software Engineering
Process 4 Hours.
Director’s Progress Review Closeout Meeting
Project Management Systems
Chapter 3: The Project Management Process Groups: A Case Study
Chapter 3: The Project Management Process Groups: A Case Study
Lifecycle Services for Advanced Wireless LAN (LCSAWLAN) practice-questions.html.
Chapter 3: The Project Management Process Groups: A Case Study
CPMGT 300 Competitive Success/snaptutorial.com
CPMGT 300 Education for Service/snaptutorial.com.
P17082 Biomechanical Elbow Model Build and Test Review
Director’s Progress Review Closeout Meeting
Concept Generation: ID-3D Design’s Initial enclosure concepts are generated based on specifications, requirements and preferences from the client as well.
P17452 Dresser-Rand System Health Monitor System Level Design Review
P17082 Biomechanical Elbow Model Build and Test Prep
Welcome W 15 Introduction to Engineering Design II (IE 202)
Adaptive Product Development Process Framework
PMI-SVC Scheduling Forum
Electrical traditional Chinese Instrument - Xun
Wireless Electrocardiogram System Senior Project
Circuits II EE221 Unit 6 Instructor: Kevin D. Donohue
Time Scheduling and Project management
Detailed Design Review (Phase 4)
Detailed Design Presentation
Detailed Design Review: P18001
P18325: Automated Breast Pump Cleaning System (Team ABC’s)
Preliminary Detailed Design Review: P18001
Presentation transcript:

P17452 Dresser-Rand System Health Monitor Detail Design Review Anthony Ballister Dylan Boberg Jehad Al Dabbous Matthias Galley Fernando Soto Andrew Gordon

Agenda Team Vision (2:00 - 2:01) Decisions Thus Far (2:02 - 2:09) Final Design (2:10 - 2:15) Signal Conditioning Circuit (2:15 - 2:25) Bill Of Materials (2:26 - 2:29) Test Plans (2:30 - 3:39) System Level Use Case (2:40 - 2:44) Risk Management (2:45 - 2:49) Gantt Chart (2:50 - 3:05) Questions

Team Vision This phase revolved primarily along finalizing design plans for our project. MSD II test plans, component simulations, prototyping etc. Primary focuses were spent finalizing documentation for smooth transition next semester, and executing ADC test plans to confirm sampling rates on multiple channels Tony

Decisions Thus Far Sampling: 1kHz, 9 Channels, 2 seconds, 1/hour Storage: SD Card Wireless: Bluetooth Encasing: ABS Plastic Sensors: Existing sensors Accepting: Mini XLR, BNC Connectors Processing: Raspberry Pi Display: LED Mount: Rubber feet Power: AC power Receiver: Tablet Base Tech: Java Script (through HTML 5 or Native) Framework: Ionic 2 Graphics: D3 Tony

Final Design Matthias

Signal Conditioning Circuit Layout Dylan

Signal Conditioning Circuit Dylan

Amplifier/Voltage Divider Circuit (Acceleration) Dylan

Amplifier/Voltage Divider Circuit (Pressure) Dylan

Low Pass Filter Circuit Jehad

BOM Matthias

Andrew

200Hz Sine Wave Sampled at 1kHz Andrew

20kHz Sine Wave Sampled Andrew

Andrew

Fernando

Dylan

Revisiting the System Level Use Case Fernando

Risk Management Tony

Plans for the Next Phase Plans for MSD II: • Upon completion of the phase review, address final concerns • Prepare final presentation for Gate Review -- Test Plans -- Scheduling -- Costs Plans for MSD II: • Verify the completion of all MSD I phases and that they are properly updated • Properly document all remaining progress to ensure smooth transitioning • Construct a WBS for next semester Tony

Gantt Chart Mathias

Gantt Chart (MSD II) Mathias

Questions?