F. Peauger (mainly for CM components)

Slides:



Advertisements
Similar presentations
Development plan and quality plan for your Project
Advertisements

APPLICATION OF EDMS TO XFEL CRYOMODULE ASSSEMBLY AT CEA Christelle CLOUE - Catherine MADEC.
From Research Prototype to Production
Assembly Organisation and Duration. Work Site Organisation STORAGE SMA18 UNLOADING CLEAN ROOM CERN-SITE CLEANING MANUFACTURE DIRTY TRIAL ASSEMBLY ISO7.
Accelerator/WP High Beta Structures Alan Wheelhouse HIGH-BETA CAVITY DELIVERY April 21, 2015.
Manufacturing contracts for RFQ
LASA Medium-β Cavity Progress Update Paolo Michelato 2 nd ESS Collaboration Meeting - SRF Elliptical Cavities 15 th December 2015.
Accelerator/ Medium Beta Cavities Paolo Michelato INFN Milano - LASA April 21, 2015.
Medium Beta Cavities Paolo Michelato, Paolo Pierini, and Carlo Pagani INFN Milano - LASA.
Medium beta cavities Paolo Michelato, Paolo Pierini, Carlo Pagani INFN Milano - LASA.
RISK REGISTER Management & Engineering
ESS RFQ PROJECT RISKS Anne-Catherine CHAUVEAU 14 January 2016.
INTERFACES MANAGEMENT CRYOMODULES Vincent HENNION SYSTEM ENGINEERING ACTIVITIES.
ESS CRYOMODULE RISKS REGISTER ESS CRYOMODULE COMPONENTS AND CAVITY EXPERTISE Franck PEAUGER14th January 2016.
Collaborating for Quality Quality Assurance (QA) & Quality Control (QC) in the Accelerator Project (ACCSYS) Matthew Conlon ACCSYS QA/QC
SRF COLLABORATION MEETING MAY.2016 ESS MEDIUM BETA CAVITY MANUFACTURING CEA Saclay/ESS ECCTD WU Cavités | Enrico Cenni.
O. Kester, NuSTAR annual meeting, 27/02/2013
Wish list from ESS Christine Darve H-ECCTD Kick-off meeting 16 March
S. Barbanotti - DESY Requirements Conformance for SRF Cryomodules Workshop 16/10/2014 – ESS, Lund XFEL cryostat main components: Quality Assurance and.
H-ECCTD KICK-OFF DEVELOPMENT PLAN AND SCHEDULE 16/03/2016.
ESS Cryomodule Status Meeting – Introduction | | Christine Darve Introduction to Cryomodules for the ESS 2013 January, 9 th Christine Darve.
P. Bosland CEA-Saclay Collaboration Board meeting Copenhagen 14/04/ Status of the French activities under the responsibility of CEA Philippe CHOMAZ.
Scope of PCP Phase 1: Solution Design of Q4 First-of-a-kind prototype QUACO Bid Conference, CERN, 07 th July 2016 Arnaud Foussat, CERN TE MSC-LMF Helene.
Collaborating for Quality through the Project Quality Plan Matthew Conlon ESS ACCSYS QA/QC Quality Learning & Planning.
CONFIGURATION MANAGEMENT AND CONTROL PLAN ESS Quality Assurance and Control workshop (30June) V. HENNION.
ASSEMBLY OF THE IFMIF CRYOMODULE Janic Chambrillon On behalf of the SRF-Linac Team TTC Meetting - June 5th – 8th, Saclay.
ESS Program Plan and Schedule Update
WP High Beta Cavities Delivery
Status of E-XFEL Module Assembly at Saclay
Status of the M-ECCTD F. Peauger - P. Bosland
Medium Beta Elliptical Cryomodule CDR Closeout
Cryomodule test stand at ESS site
Spoke section of the ESS linac: - Status of prototypes and CDS-SL
WP5 Elliptical cavities
ESS cavity procurement via in-kind contributions
Roadmap for triplet cryostats
Medium beta cryomodule demonstrator M-ECCTD
Task T HTS Dipole Magnet Design and Construction
Task 10.3 : 5T HTS Dipole Magnet Design and Construction
Documentation (XFEL Naming convention, uploading…)
6th srf collaboration lasa 13 June CAVITY interfaces - Vincent Hennion / PIERRE BOSLAND Bonjour, Franck Peauger, Je suis Ingénieur RF.
XFEL Tuner system non-conformities Detected At saclay
ESS RF Development at Uppsala University
UK RFD Pre-Series cryomodule
WP 3 coordination meeting Saclay May 2008
XFEL Cold mass & vacuum vessel non-conformities Detected At saclay
Installation Binder / IRR – an example
Daresbury ESS In-Kind Contributions
Workshop commissioning Installation Coordination at ESS
Cryomodule ESS FAT & SAT SRF meetinG on 07/11/2017
Licensing requirements for Cryomodules
Critical design review #1 for medium beta cavity cryomodules 3-4 APRIL main evolutions between M-ECCTD and serie - Bonjour, Franck Peauger, Je.
PSS verification and validation
Identification and marking of ESSI deliverables
Cryomodule Product Breakdown Structure and configuration traceability
XFEL cryomodule production and Reliability improvement
Spoke section of the ESS linac: - Status of prototypes and CDS-SL
ESS High Beta Cavities Quality Assurance and Control - Learning and Planning Workshops, CEA Saclay, 30 June - 1 July 2016 Mark Pendleton STFC, Daresbury.
Quality assurance and Quality control organisation
How Do We Define Acceptance of a Cryomodule? - A Discussion
Pierre Bosland – on behalf of the ESSI team (ESS Irfu)
Critical design review #1 for medium beta cavity cryomodules 3-4 APRIL SAFETY AND RAMI INPUTS - Franck Peauger OLIVIER KUSTER (INSTALLATION AND.
IKCA CEA Technical ANNEXES Follow up 18th DECEMBER 2015.
Charge and Agenda of the 18th TAC meeting
SNS-PPU upgrades the existing accelerator structure
ACCSYS Collaboration Board Triestre, 3rd october 2017
East Hall under construction
CEA: Status of CEA Activities on the SRF cavities and cryomodules
10th srf collaboration LASA JUNE CAVITY interfaces - Vincent Hennion
Presentation transcript:

F. Peauger (mainly for CM components) Critical design review #1 for medium beta cavity cryomodules 3-4 APRIL 2017 - Risks management - Philippe Gastinel on belhaf of the Risk Owners F. Peauger (mainly for CM components) Th. Trublet (mainly for CM assembly)

Risks management Dispositions Risk evaluation (brainstorming with experts team): Two categories : Cryomodule components (Schedule 5.2) / Cryomodule assembly (Schedule 5.3) Several types: Top level / WP level Shared (co-responsibility) / transferred risks (risk owner is ESS) Rating before / under/ after mitigation and criticity assessed by likehood x impact = K for “criticity” Mitigations Risk owner Actions list and follow-up Update when needed (at least every 6 months) ESS/CEA Workshop in Jan 16 (baseline set for risk monitoring) More details in “RISK MANAGEMENT FOR ESSI PROJECT” - CEA-ESS-PJT-AQ-0006 A Risk registers CM components : CEA-ESS-CMS-AQ-0001 CM assembly : CEA-ESS-CMS-AQ-0002 04/04/2017 Risks management

- CM components Risk status -

Cryomodule components (current risks) Status via criticity matrix (F1) Coupler pre-series will not reach the expected performance during conditioning (K128 -> K8) (M1) Series components integrated not matching performances (assembly, tooling compatibility, alignment, thermalization, cryo performance under power …) (K64 -> K32) (F2) RF source lack of reliability at start (K32 -> K16) (new C5) - Cryogenics performance not matching requirements (K16) (F1) – Coupler pre-series (M1) – Series comp. performance 04/04/2017 Risks management

Cryomodule components (current risks) Mitigation action status (F1) Analyze schedule impacts with different procurement scenarii. (100%). Keep the companies involved in prototypes in the business (100%). 2 proto couplers tested by CEA & contractor at full performance (100%) (M1) Dummy assembly (100%) + Drawings control before proc. (50%) + Show stopper in compo. contracts after H-ECCTD assembly (50%) + M-ECCTD assembly (50% )& tests ASAP > Split CDR_M1 /_M2 (100%) (F2) Prioritize the RF source procurement (100%) + Prepare the installation in advance (50%) (C5) Internal critical review with cryogenics experts -Nov 16 (100%)- link to RR4-M1 Coupler pair for RF processing Mockup string Spaceframe insertion RF source Klystron fabrication 04/04/2017 Risks management

Cryomodule components (Transfered risks) (E1) Cavity expertise : CEA responsability is directly or undirectly engaged Transfered : ESS schedule will explicit limit of responsabilities and change instruction provisions (studies) (T2) TS /Cavity not adapted Transferred : Tests of one LASA cavity in M-ECCTD + interfaces drawings LASA Cavity for M-ECCTD received at CEA 04/04/2017 Risks management

- CM Assembly Risk status -

Cryomodule ASSY (current risks) Status via criticity matrix (M4) CM assembly tasks duration or contingency reserves not sufficient - aleas during assembly contract (K64 -> K8) (M6) Assembly contractor not fully efficient -at the starting time mainly (K64 -> K32) (A6) Too few optimization possible of the components after proto phase (K64 -> K32) 04/04/2017 Risks management

Cryomodule ASSY (current risks) Mitigation action status (M4)General schedule before In-kind signature(100%). Internal expertise to secure the assembly plan and detailed schedule before industrial contract call for tender to identify optimum cost, lessons learnt of XFEL CM assembly costs (75%). External assistance contract (75%). CM assembly hall reservation (100%). Clean room co-activities evaluation (75%) (M6) Expertise (75%) + Assembly procedure clarification (50%) + more involvement in procedure elaboration + good selection of contractors + Task force with contractor + schedule acceleration (operation shift) (A6) CM CDR as soon as possible to qualify assembly tooling and procedure (75%) & split CDR in (light and enhanced(100%). Hold points in procurement contract after pre-series components manufacturing (100%). Delay the start of CM series assembly (not possible at this moment) M-ECCTD cavity string 04/04/2017 Risks management

Cryomodule ASSY (current risks) Additional risks in major zone (K32 line - description and mitigation status) (M2) Uncontrolled interfaces design definition or uncontrolled changes from ESS or partners(K32 -> K32) CEA included in the loop of approval on system design report (interface document) (50%). Efficient Change control (25%) (M7) Unsuccessfull call for tender for assembly contract (K32 -> K32) Identify the possible descoping items (options) to match allocated budget (25%) (E2) Major non conformity on components (interfaces & performances) not detected before shipping (K32 -> K32) Extended QA control at Saclay (50%). (E5) String contamination during CM assembly (for CM not tested at Saclay) not detected before shipment (K32 -> K32) Connection procedures (75%) + training on mock-up (100%) + specific assembly and control tools (50%) CEA participation decision to first CM installation, check out (100%) 04/04/2017 Risks management

Cryomodule ASSY (Transfered risks) (M1) CM piping welding not approved (K32) Transfered : Mitigation actions in progress (Rupture disk, certification report from TUV nord, meeting with cryogenic group after cryogenic design - margin) (M3) CM Warranty period expirated before the CM acceptance Transferred : IKCA contract (warranty reserve ) (T2) frame realization and transportation out of spec Transferred : IKCA contract - Additional studies on clamping system (T4) Degradation of performance during transportation and handling for unloading Transferred : IKCA contract- Transportation studies + full size tests + (under vacuum with active pumping?) (E1) RF test stand ( ESS) not ready in due time Transferred : IKCA contract - In-kind paragraph on CEA responsibilities due to ESS test stand delay. Establish a permanent financial statement = evolution, costs evaluation and follow-up (E3) Accidental damage on CM at ESS Transferred : IKCA contract - Implement protection tools and using of handling procedures and connection procedure validated by CEA (E4) CM string contamination during beam pipe connexion with tests stand Transferred : IKCA contract - Connection procedures + training on mock-up + specific assembly and control tools 04/04/2017 Risks management

Thank you for your attention Risks management Commissariat à l’énergie atomique et aux énergies alternatives Centre de Saclay | 91191 Gif-sur-Yvette Cedex T. +33 (0)1 69 08 76 11 | F. +33 (0)1 69 08 30 24 Etablissement public à caractère industriel et commercial | RCS Paris B 775 685 019

Cryomodule components (Closed risks) (E1) Cavity expertise : CEA responsibility is directly or indirectly engaged Mitigation (even transferred) : involvement in Configuration Control Board (F3) Couplers doorknob do not respect specifications or very difficult to manufacture Design qualified by successful test in Sept 16 (F4) Unsuccessful coupler call for tender or offers out of budget Call for tender successful (C4 )Un-availability of Aluminium gaskets for assembly Alumimium materials provided doorknob 04/04/2017 Risks management

Cryomodule ASSY (Closed risks) (B2) Integrity of cmp before assy : Components failure during transportation from other site to SACLAY Quality control (visual check) before and after transportation (A1) Assy : Lack of component Anticipation of components procurement (C1) Perf demonstration : Lack of performance of cryogenic and RF utilities (Operating Temp not achieved and/or Test runs limited to few hours, RF source + Power eqt failure during tests, Vacuum eqt failure during tests) Assumed to be OK but transferred to CEA internal RR for monitoring 04/04/2017 Risks management