2001 Collimation System & FF integrated design (NLC)

Slides:



Advertisements
Similar presentations
1 Collimation Simulations and Optimisation Frank Jackson ASTeC, Daresbury Laboratory.
Advertisements

Beam-Beam Effects for FCC-ee at Different Energies: at Different Energies: Crab Waist vs. Head-on Dmitry Shatilov BINP, Novosibirsk FCC-ee/TLEP physics.
1 Crab Waist Studies for SuperB and KEKB Y. Ohnishi/KEK SuperB Workshop V Paris 10/May/2007.
Overview of Beam Delivery System Final Focus Optics Collimator Final Doublet Extraction/Dump Others S.Kuroda ( KEK ) MDI meeting at SLAC 1/6/2005.
NLC - The Next Linear Collider Project NLC IR Layout and Background Estimates Jeff Gronberg/LLNL For the Beam Delivery Group LCWS - October 25, 2000.
November 2005M. Woodley1 ILC Beam Delivery System layout with end-of-linac undulator.
NLC - The Next Linear Collider Project IR Working Group Summary Tom Markiewicz LC R&D Workshop, UCSC June 29, 2002.
IR Beamline and Sync Radiation Takashi Maruyama. Collimation No beam loss within 400 m of IP Muon background can be acceptable. No sync radiations directly.
October 31, BDS Group1 ILC Beam Delivery System “Hybrid” Layout 2006e Release Preliminary M. Woodley.
Ijaz Ahmed Ijaz Ahmed Helmut Burkhardt Andrea Latina Beam-Halo Generation Study in CLIC CLIC Beam Dynamics Meeting, CERN: 13/02/08.
New Progress of the Nonlinear Collimation System for A. Faus-Golfe J. Resta López D. Schulte F. Zimmermann.
Backgrounds in the NLC BDS ISG9 December 10 – Takashi Maruyama SLAC.
First investigations of ATF2 at SLAC Axel Brachmann, Thomas Himel, Tom Markiewicz, Janice Nelson, Toshiyuki Okugi, Mauro Pivi, Tor Raubenheimer, Marc Ross,
Global Design Effort ILC Crab Cavity Overview and requirements Andrei Seryi SLAC on behalf of ILC Beam Delivery and Crab-Cavity design teams Joint BNL/US-LARP/CARE-HHH.
28-May-2008Non-linear Beam Dynamics WS1 On Injection Beam Loss at the SPring-8 Storage Ring Masaru TAKAO & J. Schimizu, K. Soutome, and H. Tanaka JASRI.
1 O. Napoly ECFA-DESY Amsterdam, April 2003 Machine – Detector Interface : what is new since the TDR ? O. Napoly CEA/Saclay.
Collimation Baseline Configuration and Collimation Studies Frank Jackson ASTeC Daresbury Laboratory.
Taikan SUEHARA et al., LCWS2007 & DESY, 2007/06/01 R&D Status of ATF2 IP Beam Size Monitor (Shintake Monitor) Taikan SUEHARA, H.Yoda, M.Oroku,
ILC IP SR and PEP-II M. Sullivan for the ILC IR engineering workshop IRENG07 Sept 17-21, 2007.
1 O. Napoly ECFA-DESY Amsterdam, April 2003 Machine – Detector Interface : what is new since the TDR ? O. Napoly CEA/Saclay.
Optics for x-ing IR Andrei Seryi November 5, 2004.
Design challenges for head-on scheme Deepa Angal-Kalinin Orsay, 19 th October 2006.
The design of the 2mrad extraction line Rob Appleby Daresbury Laboratory On behalf of the SLAC-BNL-UK-France task force ILC European Regional Meeting and.
1 April 1 st, 2003 O. Napoly, ECFA-DESY Amsterdam Design of a new Final Focus System with l* = 4,5 m J. Payet, O. Napoly CEA/Saclay.
ILC BDS LATTICE DESIGN WITH TDR PARAMETERS
Optimization of the Collider rings’ optics
FCC-ee Interaction Region design
Near IR FF design including FD and longer L* issues
Collimation Simulations and Optimisation
MDI and head-on collision option for electron-positron Higgs factories
Dynamic Aperture Studies with Acceleraticum
Review of new High Energy Rings
Benchmarking MAD, SAD and PLACET Characterization and performance of the CLIC Beam Delivery System with MAD, SAD and PLACET T. Asaka† and J. Resta López‡
The Studies of Dynamic Aperture on CEPC
For discussion of Final Focus and IR of plasma-based collider
New algorithms for tuning the CLIC beam delivery system
CLIC-ILC BDS & MDI work.
Sha Bai CEPC AP meeting Local double ring MDI Sha Bai CEPC AP meeting
Beam-Gas Inelastic scattering in CEPC partial double ring
ILC Baseline BDS Collimation Depth Calculations
ILC BDS Emittance Diagnostics: Design and Requirements
Optimization of CEPC Dynamic Aperture
NEW DESIGN OF THE TESLA INTERACTION REGION WITH l* = 5 m
The 2mrad horizontal crossing angle IR layout for the ILC
DA Study for the CEPC Partial Double Ring Scheme
Progress of SPPC lattice design
XII SuperB Project Workshop LAPP, Annecy, France, March 16-19, 2010
First look at final focus part of super-B factory
CEPC partial double ring scheme and crab-waist parameters
Comparison of the final focus design
CEPC main ring magnets’ error effect on DA and MDI issues
CNGS Proton beam line: news since NBI2002 OUTLINE 1. Overview
Interaction Region Design Options e+e- Factories Workshop
Final Focus Optics Test at ATF
Collimation Optimisation
Final Focus optics for Possible New B-Line
S.Kuroda ( KEK ) Final Focus Optics Collimeter Final Doublet
Final Focus System: gg Interaction Region
Tune Shift Induced by Flat-Chamber Resistive Wall Impedance
Update of DA Study for the CEPC Partial Double Ring Scheme
V12 work needed (some in progress):
Beam-Beam Effects in High-Energy Colliders:
Studies of crossing angle and SR effects for CLIC TENTATIVE
LNF site 1.2 Km LER lattice: preliminary dynamic acceptance studies
Lattice design and dynamic aperture optimization for CEPC main ring
Simulation check of main parameters (wd )
Analysis of Chromaticity of WD-PDR4
Yuri Nosochkov Yunhai Cai, Fanglei Lin, Vasiliy Morozov
Option 1: Reduced FF Quad Apertures
Sha Bai CEPC AP meeting Work summary Sha Bai CEPC AP meeting
Presentation transcript:

2001 Collimation System & FF integrated design (NLC) Octupole Doublets FD A Final Focus Final Focus collimation IP A Energy collimation FD Betatron collimation A IP FD IP FD IP S SA SA SA A New scheme of the Collimation Section and Final Focus with ODs All the tracking results shown in the previous slides include the CS

2001 Collimation System & FF integrated design (NLC)

2001 NLC BDS Tail folding octupoles are ON. 16sxx51sy Tail folding octupoles are OFF. 11sxx46sy

RoadMap Report BDS (Kuroda) NLC JLC Energy collimation

RoadMap Report BDS (Kuroda) Tail folding octupoles are ON. 16sxx51sy Tail folding octupoles are OFF. 11sxx46sy

Synchrotron Radiation RM BDS Final Doublets SR TFO ON qx=2.66mrad qy=9.24mrad 16sx,IP 8.11mm 51sy,IP 6.25mm TFO OFF 11sx,IP 5.47mm 46sy,IP 5.64mm qx qy IP Last Bending q=-67.5mrad XIP=-6.08mm Final Doublets Half aperture 10mm

Energy Collimation Section SPE aperture SPE ABE Kuroda, SAD, 10000macro, IP sp=3.0-3 99.21% sp,IP= 0.2951 sp =1.0-2 57.34% sp,IP= 0.4441 sp =2.0-2 30.79% sp,IP= 0.4626 sp =3.0-2 20.60% sp,IP= 0.4616 Aperture, sp,IP=0.9% SPE Ax=1.6mm -> 3.1mm ABE Ax=3.4mm -> 5.8mm

Betatron Collimation Section Kuroda, SAD, 10000macro, IP X: –30 to 30sx Random Y: –70 to 70sy Random sp =1.0-2 Gauss Final Focus CollimationのAB10 がBeam tailのCollimationに効い ている。 AB10 Ax=17.96sx Ay=50.74sy IP Init SPE AB10