Remote Handling Workshop Introduction

Slides:



Advertisements
Similar presentations
Best Practices for Remote Assembly and Maintenance Keith Kershaw, Sources, Targets and Interactions Group Thanks to: Alessandro Tesini and Jim Palmer of.
Advertisements

Work Breakdown Structure
Introduction to electronic resources management Workshop introduction and overview.
ICT development office ICT research, planning and training dept. Network development and administration dept. System development and operation dept. President.
09/03/2010 ADO-PO section meeting Beam Pipe Extraction/Insertion R. Vuillermet.
Electrical Engineering for NSS - Status and Planning- Thomas Gahl Electrical Engineering Group Leader February 26, 2014.
Personnel Safety Systems Stuart Birch Senior Engineer, Personnel Safety Systems November 6 th, 2014.
Enterprise Library 3.0 Memi Lavi Solution Architect Microsoft Consulting Services Guy Burstein Senior Consultant Advantech – Microsoft Division.
DTU A VISION OF SUPPORTING NEUTRON CHOPPER ESS PT 1 - BUNKER SYSTEMS Discussion Document.
Collaborating for Quality through the Project Quality Plan Matthew Conlon ESS ACCSYS QA/QC Quality Learning & Planning.
CONFIGURATION MANAGEMENT AND CONTROL PLAN ESS Quality Assurance and Control workshop (30June) V. HENNION.
News and Introduction from CERN June 15th, 2005
SOFTWARE TESTING Date: 29-Dec-2016 By: Ram Karthick.
Evaluation of Priority Gender Equality
Making Difficult Decisions in a Transparent Way –
NATIONAL QUALIFICATIONS FRAMEWORK IN SERBIA
Business Intelligence
Roadmap for triplet cryostats
Document Management June 1st 2011 Michel Lapointe Mario Poirier
Fundamentals of Information Systems, Sixth Edition
Architecture Components
EOB Methodology Overview
Enterprise Content Management Owners Representative Contract Approval
UK RFD Pre-Series cryomodule
Chapter 1 The Systems Development Environment
Validation & conformity testing
Coordinated Workstation Purchasing Update
MOSH Leading Practices Adoption System
Classified Evaluation System
Best Practices: AP Automation Dan Thomson
ESS Vision 2020 Validation: Implementation of deliverables
SISAI STATISTICAL INFORMATION SYSTEMS ARCHITECTURE AND INTEGRATION
Understanding and Planning Business Reports and Proposals
Connecticut Core Standards for Mathematics
WP2 Communication WP and tasks presentation
ESB Networks Market Release Meeting of the IGG, April 16th 2009
ESS VIP ICT Project Task Force Meeting 5-6 March 2013.
Classified Evaluation System
Item 7 - Roadmap and mandate for the Task Force on UOE Education Expenditure Data Eurostat Education and Training Statistics Working Group - Luxembourg,
Follow up workshop 14 January on streamlining
Status of Control Services ICS WP10 (accelerator integration work package) Tuesday 20th November
Location and Alignment devices
Information on projects
Towards a new tool for seasonal adjustments: Demetra+
Agenda Purpose for Project Goals & Objectives Project Process & Status Common Themes Outcomes & Deliverables Next steps.
Resource Directors Group Introduction
Workshop commissioning Installation Coordination at ESS
Safety, reliability and maintainability
Technology Department Annual Update
Progress on Standardization
ESS.VIP Validation Item 5.1
Electrical and fluid couplings
Remote Handling Fasteners
Imaging & Engineering STAP Meeting 12th-13th of April 2018
Lifting & Handling features
IKON 15 Talal Osman & Iain Sutton
Large Scale Structures
NSS integrated installation plan workshop Introduction
Bunker Project Operation aspects
Feedback from IKON 14 Spectroscopy.
CDS-EL IRR Closeout 28 March 2019 J.G. Weisend II, Chairman.
Executive Project Kickoff
ESHAC #8 Safety Readiness Review Thomas Hansson, ESH
East Hall under construction
Overview of the TARGET Monolith Rough Vacuum
Safety in the East Area Renovation Project
The new Zhaga-D4i interface standard for smart luminaires
WORKSHOP Establish a Communication and Training Plan
OU BATTLECARD: Oracle Utilities Learning Subscription
Presentation transcript:

Remote Handling Workshop Introduction Erik Nilsson Mechanical Engineer ESS Chopper Group www.europeanspallationsource.se 28 April, 2019

Introduction

What is remote handling ESS chopper extraction test FRM-II Guide replacement Image courtesy of E. Calzada ISIS Long tool test Image courtesy of P. Galsworthy

Implementation After 48-72hrs Front access Rear access After 10-15days Separation After 48-72hrs Front access RH only Rear access Hands on (hotspot removed) After 10-15days or Hands (hotspot removed) Hands on Restricted activities ‘Front’ Full-RH or Limited-RH ‘Back’ Full-RH or No-RH No in-situ RH maintenance is foreseen. Installation is not considered a RH-activity.

RH workshop 1 – November 2017 15 participants from 6 institutes Topics: Remote handling justification and guidelines Basic information on technical solution areas System solutions vs. component solutions Alignment issues for Z-alignment of guides Results: General understanding of the requirements and environment No non-ESS resources available for solution development. ESS develops all solutions and provides to partners. Report available in ESS-0191767

Action list RH-workshop 1 Area Task Note Status Administrative Create and maintain component database   In Progress Location and alignment devices Basic rules In progress Basic set of components Lifting and handling features Chain test Test to investigate possibility to remotely attach normal chain type lifting rigs to components. Completed Single lifting point standard Development and test of a series of standard single point lifting assemblies. Multiple lifting point standard Evaluation and conceptual design of multiple lifting point method. Fasteners Common design Development and release of common design of series of RH fasteners. Electrical and fluid connectors Selection and specification Select and specify standard range of connectors. Not started (Planned for end of May) Investigate shielding need. Investigate need to shield connectors within the bunker. If so, conceptual design of simple radiation shield is needed. Not started RH bellow Inflatable bellow Development and test of inflatable vacuum bellow Disregarded Mechanical bellow Development and test of mechanical bellow In Progress – Industrial solution on the way Guide positioning and realignment Conceptual design Conceptual design of guide housing realignment system. Routing Snorkel design, build and test

Workshop charge Goal: Day 1 Day 2 Workshop spirit Provide updates on relevant technical developments Show common issues and potential solutions for all instruments Discuss and solve instrument specific issues Important information required for TG3 systems Day 1 Update on guideline development Update on technical standards development Vacuum flange and below development Utilities routing and cabling Short presentations – please ask questions and comment Day 2 Instrument specific issues and challenges Workshop spirit Focus on finding solutions with a plausible way forward Open and equal discussions Transparent discussion

RH Deployment Baseline strategy Technical standards Operations strategy Development Internal validation External validation Developed with collaborators. External validation. Released as packages. Aligned with SSM application Developed internally Roll-out Compliance checks Deployment IKON Newsletter FtF meetings During detailed design During procurement phase TG3 Reduce the amount of information. Refer to the document and point out the key. Aim for 30min content. ESS-0042943 Tools development Prototypes and testing Implementation Development of foreseen tools. Prototyping of critical systems, tools and components. June-17 Jan-18 June-18 Jan-19 June-19

Thank you for your attention Questions? Add extra slides on what we are looking at. Thank you for your attention Questions?