Installation Site Organization Target Division

Slides:



Advertisements
Similar presentations
John Boon ZUT November Procurement Systems The organisation of the interaction between the purchaser of a new building and the suppliers of goods.
Advertisements

Industry Competency Training
1 Lori Plummer 1 LCLS Office Space FAC Review – Breakout Session CONVENTIONAL FACILITIES LCLS Office Space Lori Plummer, PMP,
Progress and Plans: Target John Haines Head of Target Division Nov 5, 2014.
In-Kind Contribution Management Update Allen Weeks March 20, Lund.
Target Project Progress and Plans Eric Pitcher TAC-10 November 5, 2014.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
Response to TAC8 and Annual Review Recommendations John Haines Head of Target Division April 2, 2014.
Progress on Remote Handling Systems TAC 12 Magnus Göhran – WPM 15 th October 2015.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
Neutron Chopper Technologies Work Package
Monolith design update – Emphasis on Neutron beam extraction design
H. Danared | Cryomodule Workshop | Page 1 The In-Kind Process at ESS Håkan Danared Lund, 15 October 2014.
McDonough Bolyard Peck Educational Series HVAC Commissioning Presented by: Doug Wren Steve Baxter September 30, 2003.
WP7 Plan – Pilot TSS Cost – Risks Linda R. Coney Group Leader – Target Safety and Controls 15 – 16 February 2016.
Service Agreements Emmanuel Tsesmelis CERN / TS-LEA RRB Scrutiny Group 31 August 2006.
Target Project Progress and Plans Eric Pitcher Deputy Head of Target Division 11th TAC Meeting April 1,
Status report on ICS interfaces (Accelerator, Target, NSS, CF) and related activities Miha Reščič Deputy Project Manager, ICS
ESS | title of presentation | 2012-xx-xx | name of presenter Roles and Responsibilities sub title.
European Spallation Source Overview and Status Technical Advisory Committee 1-2 April 2015 James H. Yeck ESS CEO & Director General
Personnel Safety Systems Stuart Birch Senior Engineer, Personnel Safety Systems November 6 th, 2014.
Conventional Facilities integration: Approach and Issues Daniel Piso Fernández WP Leader (WP13 Conventional Facilities Integration Support) November 5,
Update on the ESS monolith design Rikard Linander Monolith and Handling Group ESS Target Division TAC 10, Lund, Nov 5,
Instrument Construction Phase 1 and beyond Rob Connatser Chief Instrument Project Engineer September, 2014.
Target Systems and Monolith Design Update Rikard Linander Group Leader Monolith and Handling April 2, 2014.
Site Organization and services for machine installation/commissioning Peter Rådahl June 2016.
DTU A VISION OF SUPPORTING NEUTRON CHOPPER ESS PT 1 - BUNKER SYSTEMS Discussion Document.
The ESS Target Station Eric Pitcher Head of Target Division February 19, 2016.
GUARANTEED ENERGY SAVINGS CONTRACTS
LCLS-II ES&H Requirements: Subcontractors
ESS licensing process and Readiness Reviews
Installation Procurement Package
Cryomodule test stand at ESS site
Making Difficult Decisions in a Transparent Way –
Small Sites Planning & Scheduling
FC facilitation of Installations
Documentation status in WP 5 Goal: To collect all documentation/know-how needed in a structured way for the ESS installation, commissioning, operation,
ChE 473K Plant Design R. Bruce Eldridge.
9/18/2018 Bids CONTRACTING Khamis…..
Mikael Jakobsson ESS Installation Manager
Helen Boyer OHS group leader
ESS Project Status Roland Garoby – Technical Director August 2018.
ESS Installation Binders Readiness Reviews Work Orders Mikael Jakobsson ESS Installation Manager Sep , 2018.
Installation Binder / IRR – an example
Quality Regulation for Mechanical Equipment RESSQ – Mech
Infrastructure Project and Component Installation Accelerator Project
Radiological and Environmental Monitoring System (REMS)
Workshop commissioning Installation Coordination at ESS
The Bunker Project Overview Zvonko Lazic
Target Helium Cooling System Design Code 10th Target Technical Board Meeting Ulf Odén WP2 Manager 19 April, 2019.
Remote Handling Workshop Introduction
Bunker Internal Review Welcome & Charge
Instruments Shielding Project Installation
Progress on Standardization
Receiving Inspection on incoming goods
Presenter name Presenters title
Imaging & Engineering STAP Meeting 12th-13th of April 2018
IKON 15 Talal Osman & Iain Sutton
NSS integrated installation plan workshop Introduction
Bunker Project Schedule/Budget
INSTALLATION & COMMISSIONING TAC 14
Licensing update ESHAC #7, October 2017
CDS-EL IRR Closeout 28 March 2019 J.G. Weisend II, Chairman.
TSS Management: Procurement & Installation Planning
ESHAC Meeting # Peter Jacobsson Head of ESH
Bunker Critical Design Review Welcome & Charge
Acc Collaboration board Trieste
MRV system budget and scheduling Short overview installation
Overview of the TARGET Monolith Rough Vacuum
Presentation transcript:

Installation Site Organization Target Division Tobias Lexholm Installation Coordinator, Target Division www.europeanspallationsource.se Aug 2018

Site Organization

Organization Over all site organization ESS Installation Manager Deputy ESS Installation Manager Over all QC Installation Inspection Receival inspection NDT (X-ray, PT, UT etc.) Accredited Inspection Body AIB Accredited Body AB Final quality documentation Site Admin Time Schedule Financial control Procurement inst. hardware/manpower ESH Available Temporary Services on ESS site Scaffolding Laydown Areas Crane Drivers Logistics/Transport Warehouse Heavy lifting Temporary Power & Fluids Concrete Boring/Drilling Survey/Alignment Waste Workshop ESS Project Manager Deputy ESS Installation Coordinator Mechanical Installation support Electrical Installation support Rigging support ESS Framework Agreements Welders Fitters Electrical I&C Technicians Etc. TD Installation Coordinator ACC Installation Coordinator NSS Installation Coordinator ICS Installation Coordinator CF Installation Coordinator

Organization Target project site organization Over all QC Installation Inspection Receival inspection NDT (X-ray, PT, UT etc.) Accredited Inspection Body AIB Accredited Body AB Final quality documentation Target Installation Coordinator Tobias Lexholm Deputy Target Installation Coordinator Sven Jönsson Site Admin (2-3 pers) Document control Time Schedule (Görel Hagermark) ESH (MrX) Work Permit Accommodation (Site & Hotel) Financial control Procurement inst. hardware/manpower NCR (Non Conformity Report) ESS Installation Manager Mikael Jakobsson Available Temporary Services on ESS site Scaffolding Laydown Areas Crane Drivers Logistics/Transport Warehouse Heavy lifting Temporary Power & Fluids Concrete Boring/Drilling Survey/Alignment Waste Workshop Commissioning Rikard Linander Jaime Arriagada Nils Jönsson Site Operatives Area Coordinator D02, Sven Jönsson Temporary services (2-3 pers) Temporary Service Logistic / Laydown Area Rigging / Lifting El and I&C installation coordinator ESS Framework Agreements Welders Fitters Electrical I&C Technicians ICS Installation Package Leader Monolith Systems WP2-TW, Inner/outer shielding, TMP WP3-M&R WP4-Monolith vessel, PBW, Portbl. Installation Package Leader Process Systems WP2-Helium cooling WP4-Monolith Atmosphere systems WP5-Fluid systems Installation Package Leader Target HVAC Systems WP5- Target HVAC Installation Package Leader Target Cryo Systems WP3- CMS Cryogenic Moderator System Installation Package Leader Instrument Bunker WP4- NBEX, Light shutter Installation Package Leader Active Cells WP6- Race scope Installation Package Leader TSS WP7- Target Safety Systems

Framework agreements with contractors El / Mech Framework agreements with contractors El / Mech. / Controls / Heavy Lifting Etc. Example: What if all (IK and contractors) use the same Electrical framework? Positive: Easier to coordinate work on site Less companies on site -> Less overhead More cost efficient if planned right More flexible (move manpower to different areas) Easier to control/mitigate critical path activities Safer way of working Negative: Harder to keep control of cost All contracts preferred to be ”time & material” Why not fixed price? Very hard to control if at the same time ”time and material”. More Administration - financial control (cost follow-up on PCC’s) Is it posible in reallity for IK to do this kind of procurements ”time and material” VAT?

Inkind use of ESS Installation Services & FWA Contracts Services – eg Rigging, Lifting, Tool hiring, NDE etc Framework Contracts – Electrical work, Mechanical work etc. Services - Recommendation Can use ESS existing (established) services (via ESS Contracts) Installation Package leads arranges for services during installation (signoff when used) Cost transactions are identified and tracked during use ESS continuously pays for service Cost book value is adjusted once installations complete

Inkind use of ESS Installation Services & FWA Contracts Framework Contracts - Recommendation Partners can use ESS existing FWA Contract Appointed Inkind person is responsible for setting up and running project towards contractor (time material or fixed) Cost transactions (for project) are tracked and aggregated Inkind approves invoices and ESS pays Cost book value is adjusted once installations complete