Jörg Schulz (EUMETSAT) - Re-calibration of Meteosat archive using HIRS

Slides:



Advertisements
Similar presentations
GRWG Report Tim Hewison 1 November Outline Status Updates – For Information only –GEO-LEO IR –GEO Solar –Lunar –Archive Re-Calibration Products.
Advertisements

Combining Multiple References GSICS Web Meeting
Brief Update on Product Developments (GRWG) Jo Schmetz 1 on behalf of Tim Hewison 1 and all GSICS Research Working Group (1)EUMETSAT.
2011 GSICS Users' Workshop Tim Hewison 1 (1) EUMETSAT.
Global Space-based Inter- Calibration System (GSICS) Progress Report Mitch Goldberg, NOAA/NESDIS GSICS Executive Panel chair.
The Global Space-based Inter- Calibration System Mitch Goldberg, NOAA/NESDIS GSICS Executive Panel chair NOAA/NESDIS.
22 March 2011: GSICS GRWG & GDWG Meeting Daejeon, Korea Tim Hewison NWP Bias Monitoring Double-Differencing as inter-calibration technique.
GSICS Coordination Center Report Fangfang Yu, Fuzhong Weng, Fred Wu and George Ohring NOAA/Center for Satellite Applications and Research 8 April, 2013.
1.Bob Iacovazzi (NOAA) - Road to Pre-operational Phase Presentation 2.All – Discussion & Feedback 3.Tim Hewison (EUMETSAT) – Reminders: Korea, Conference,
2013 GSICS Joint Meeting, Williamsburg VA, USA, March GSICS Collaboration Servers Status: 2013 Peter Miu (EUMETSAT) CMA, CNES, EUMETSAT, ISRO,
Highlights (Actions) of GSICS Exec Panel 30 October 2009 Volker Gärtner.
Marianne König, Tim Hewison, Peter Miu
JMA GPRC Report GDWG/GRWG Joint Meeting at Daejeon in March 2011
Summary Outcome of the First GSICS Users’ Workshop
DCC Product Requirements for GSICS Plotting Tool
GRWG/GDWG Joint Web Meeting Agenda
Minimising Uncertainty in SBAF - Using AIRS to bridge gap HIRS/2-IASI GSICS meeting, March 2014, Darmstadt, Germany - Change title to more general one.
Jerome Lafeuille WMO Space Programme Office
Introducing Me, GSICS, and the UV Sub-Group
Review of EUMETSAT’s GEO-LEO Correction
CMA NSMC, Beijing, China 5-8 March 2012
Sébastien Wagner, Tim Hewison In collaboration with D. Doelling (NASA)
GDWG Agenda Item THREDDS Directory Structure Updates
Topics and Chairing of next web meetings
JMA’s GSICS and SCOPE-CM activities Presented to CGMS-43 Working Group II session, agenda item 3 (from MTSAT-2) Japan Meteorological Agency.
Microwave Sub-Group Updates
GSICS Products: Common Reference Channels, Reprocessing, Versions
Strategy for Re-Analysis Products
Topics & Chairing next Web Meetings
GSICS GDWG/GRWG Joint meeting, Toulouse
GSICS Data Management and Availability to Users
Report of GRWG: Review of Actions & Web meetings
SCOPE-CM: IOGEO GSICS GRWG & GDWG, March 2017, Madison, USA
Jo Schmetz1 on behalf of Tim Hewison1 EUMETSAT
GSICS Data Management and Availability to Users
Closing the GEO-ring Tim Hewison
A Strategy for the Inter-Calibration of Solar Channels within GSICS
SCOPE-CM: IOGEO GSICS GRWG & GDWG, March 2018, Shanghai, China
Building-in a Validation cycle for GSICS Products
Combining Multiple References
Annual GSICS Calibration Report for {Agency}
Masaya Takahashi (JMA), Dohyeong Kim (KMA),
2b. GSICS Coordination Centre (GCC)
Tim Hewison1 (1) EUMETSAT
Contribution to Agenda Item 8
Planning comparison study SCM IOGEO and GSICS
GSICS Collaboration with SCOPE-CM IOGEO
GSICS LEO-LEO IR Sentinel-3/SLSTR-IASI Products
Update on GSICS Product Development
SCOPE-CM: IOGEO GSICS GRWG & GDWG, March 2018, Shanghai, China
Inter-calibration of the SEVIRI solar bands against MODIS Aqua, using Deep Convective Clouds as transfer targets Sébastien Wagner, Tim Hewison In collaboration.
Special Issue of the IEEE TGRS on “Inter-Calibration of Satellite Instruments”: 01 January 2019 Report of GRWG: Aims of meeting Review of Actions Proposal.
GSICS Research Working Group Web Meeting :00-13:00 UTC Reference Instruments and their Traceability.
GRWG+GDWG Web Meeting on Calibration Change Alerts
Inter-band calibration using the Moon
GSICS Products’ Improvements and Developments
A Strategy for the Inter-Calibration of Solar Channels within GSICS
GSICS Web Meeting Tim Hewison
Bias Monitoring Web Page Design
Template for GSICS Bias Monitoring Web Pages
SCM-06: Update on Inter-calibration of imager observations from time-series of geostationary satellites (IOGEO) 4 and 8 March 2019, Frascati, Italy Rob.
IASI / AIRS / CRIS cross-calibrations 5a 0:20
Infrared Sub-Group Report Tim Hewison
GRWG Chairing Dohyeong Kim GRWG Chair.
Masaya Takahashi Japan Meteorological Agency
Ideas for NRT Microwave Imager inter-calibration products
Announcements Welcome back!
Special Issue of the IEEE TGRS on “Inter-Calibration of Satellite Instruments”: 21 May 2019 Special session on re-calibration/re-processing – Discussion.
Aid to Users Selection of GSICS Products Thoughts on need for RAC/ARC products Tim Hewison EUMETSAT.
GRWG Summary Decisions, Actions, Recommendations
Presentation transcript:

GRWG Web Meeting 2010-12-09 Review GSICS product types and strategy for LEO-LEO products Jörg Schulz (EUMETSAT) - Re-calibration of Meteosat archive using HIRS Dave Doelling (NASA) - Inter-calibration of MODIS instruments on Terra and Aqua Tim Hewison (EUMETSAT) – Users’ feedback on Common Reference Channels for GEO Hiromi Owada (JMA) - Application of GSICS Correction to Clear Sky Radiance (CSR) All - Discussion: Review of Product Types & Strategy for LEO-LEO Products

Aims Agree potential types of GSICS products. Outline possible strategies for LEO-LEO products and application of these to re-calibrate data archives of other instruments. (This meeting is primarily intended to get people thinking about these topics before the next GRWG meeting in Korea.)

Agenda Jörg Schulz (EUMETSAT) - Re-calibration of Meteosat archive using HIRS Dave Doelling (NASA) - Inter-calibration of MODIS instruments on Terra and Aqua Tim Hewison (EUMETSAT) - Feedback from potential users on Common Reference Channels for GEO Hiromi Owada (JMA) - Application of the GSICS Correction to Clear Sky Radiance (CSR) product All -Discussion: Review of Product Types & Strategy for LEO-LEO Products

Discussion Points Coordinating with GEO-HIRS climate reanalysis Coordinating LEO-LEO products Improving simple Common Reference Channels Name for new CRC Products Agenda items for GRWG/GDWG Meeting 22-25 March 2011, Daejeon, South Korea