Richard Fairholme E.ON UK

Slides:



Advertisements
Similar presentations
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Advertisements

Long Term Entry Capacity & User Commitment Transmission Workstream 7 th August 2008.
The Treatment of “Spare / Sterilised” Capacity – follow up Draft for discussion purposes only.
Capacity trade and transfer mechanism and the next AMSEC auction Nienke Hendriks Head of Gas Transmission Policy, Enforcement and Compliance 9 May 2007.
Transfer & Trades Special Transmission Workstream
Capacity Release Processes and Investment Planning Transmission Planning Code Workshop 2 1 st May 2008.
Transfer & Trades Special Transmission Workstream
Auctions recommendations GTE+ Capacity Product Coordination (CPC) Workshop on 26 November 2008 Matthew Hatch National Grid.
Entry Capacity Substitution Workshop 7 – 10 th February 2009.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Entry Capacity Substitution Workshop 9 – 7 th July 2009 DRAFT PRESENTATION.
Transfers and Trades Transmission Workstream
Discretionary Release of Non Obligated NTS System Entry Capacity Transmission Workstream 1st May 2008.
Assignment of NTS Entry Capacity Transmission Workstream 06 November 2008.
Classification: Statoil Internal Status: Draft Mod 156/156a Questions regarding the proposals…
Update on Entry Capacity Substitution Transmission Workstream 6 th March 2008 Summary of consultation responses.
Entry Capacity Substitution Workshop 2 7 th May 2008 Substitution Example.
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
Initial Thoughts on the Release of Non Obligated NTS System Entry Capacity Transmission Workstream 3 rd April 2008.
Optimisation of Entry Capacity Strawman Transmission Workstream 4 th May 2006.
Implementation of Trades and Transfers National Grid NTS 5 th June 2008.
Entry Capacity Trading Transmission Work Stream, 5 April 2007.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Entry Capacity Substitution Workshop 4 9 th July 2008 Entry Capacity Substitution Methodology Statement: Discussion Paper.
Facilitating Release of Non-obligated Entry Capacity Draft – for discussion purposes only 22 November 2007.
Trades and Transfers Workshop, 6 th November 2007.
Mod Entry Capacity Transfers Transmission Work Stream, 5 April 2007.
Transfers and Trades Special Transmission Workstream
Transmission Workstream 6 January 2011
Proposer: Matthew Hatch Panel Date: 20/10/16
Entry Capacity Overrun price calculation
Assignment of Entry Capacity – A Shipper / Trader Perspective
Transmission Workstream, 01 October 2009
Non-approved draft Transmission Workstream, 6th December 2007
Transmission Workstream, 2nd March 06
RRC arrangements for Storage sites
Transmission Workgroup – 1st December 2011
Entry Capacity - update
DRSEC Update August 4th 2009.
0350 – Combining the NTS entry capacity and exit capacity credit checks Chris Shanley.
Recovery of Costs due to Invalid Ex-Ante Contracted Quantities in Imbalance Settlement 12th December 2017.
Capacity Methodology Statements: Impact of Mod 452
Exit Overruns in the Enduring Regime - draft MOD principles
NTS Entry Charging Review Update
Capacity Methodology Statements
Publication of Historical Gas Operational Data by National Grid NTS
UNC Modification Proposal “Allocation of Daily NTS Entry Capacity Within-Day” Richard Fairholme.
COR1072 Enduring Transfer and Trade Arrangements
Exit Capacity Substitution and Revision
Transmission Workgroup June 7th 2012
Enduring Offtake Arrangements (Including an alternative daily interruptible capacity release mechanism to facilitate use of spare capacity) Peter Bolitho.
0350 – Combining the NTS entry capacity and exit capacity credit checks Chris Shanley.
Development of Entry Capacity Substitution
Transmission Planning Code Review
Modification 501 slides for Workgroup
Long Term Non Firm Capacity Update
Transmission Workstream – Partial Assignment
LTSEC Auction Timetable
Richard Fairholme E.ON UK
Transmission Workstream 2nd December 2010
Review of Trade and Transfer Winter 09/10
Entry Capacity Transfer and Trade
Modification Proposal 0133 – “Introduction of AMTSEC auction”
Optimisation of Entry Capacity Modification Proposal
CAM: Next Steps UNC Transmission Workgroup Lisa Martin 9 January 2014.
Transmission Workstream 1st February 2007
Incremental Entry Capacity Release Methodology Statement
Entry Capacity Transfers - Constrained Period
Gemini Contingency Guidelines
Further Considerations
Presentation transcript:

Richard Fairholme E.ON UK Draft Modification Proposal: Entry Capacity Transfers to Sold Out ASEPs Richard Fairholme E.ON UK

Overview Based on Modification Proposal 0133 – includes NG’s model for unsold Entry Capacity transfers. Resolves the outstanding Licence obligation to facilitate sold capacity transfers in 2007. Only for transfers to sold out ASEPs (i.e. to solve a problem). Transfers only with a defined window of once [or twice] yearly (to minimise the administrative burden). Transfers within one User account only (to minimise the implications for Gemini). A straightforward, transparent solution – can be implemented ahead of next Winter.

Sold Capacity Transfer Process (“SCTP”) User A: ASEP 1 (Donor) User A: ASEP 2 (Recipient) Existing Process Gemini Full Transfer Mechanism User B: ASEP 1 (Donor) User B: ASEP 2 (Recipient) NG NTS NEW Process

Timeline AMSEC Auction Sold Capacity Transfer Process (“SCTP”) AMTSEC Auction (“Unsold” Capacity) Additional August SCTP (Pre-Winter)?

Why Sold Capacity before Unsold Capacity? Allows Users to optimise their own portfolio before entering the market for unsold capacity. Will allow the transfer of capacity from any other ASEP, not just those that have unsold baseline, and thus the AMTSEC, if initiated before the Sold Capacity Transfer Process, may miss the most efficient ASEP (i.e. with highest Transfer Rate). Avoids reducing the available unsold capacity at the Donor ASEPs available for purchase in the within-year auctions – the AMTSEC will likely just result in further ASEPs becoming sold out. More efficient allocation of capacity by allowing greater scope for market participants to determine at which ASEPs they most want to hold capacity.

Timeline - SCTP AMSEC Auction Ends (January) [2 days] NG issues invite to participate in SCTP Users commits to pay fixed application fee User states desired Recipient ASEPs and desired (“Available”) Months [7-14 days] NG NTS publishes transfer date, transfer rates for each Available Recipient and Donor ASEP, and max. monthly Capacity that can be accommodated at Recipient ASEP During application window, Users submit applications (8am – 5pm) NG allocates Capacity in accordance with allocation rules (Draft Mod para. 15) NG notifies Users of Allocations – End of SCTP AMTSEC (“Unsold”) process begins - Recipient and Donor ASEPs published by NG