WFD – CIS Working group A ECOSTAT

Slides:



Advertisements
Similar presentations
Intercalibration Guidance: update Sandra Poikane Joint Research Centre Institute for Environment and Sustainability.
Advertisements

WG 2A ECOSTAT 7-8 July 2004 Task on Harmonisation of Freshwater Biological Methods Status Report AC Cardoso and A Solimini Harmonisation Task Team: JRC.
WG 2A ECOSTAT Meeting 4-5 March 2004 Meeting of the WFD CIS Working Group 2A ECOSTAT summary Presented by Anna-Stiina Heiskanen Joint Research Centre The.
ECOSTAT 8-9 October 2007 River GIGs: Future intercalibration needs/plans Presented by Wouter van de Bund Joint Research Centre Institute for Environment.
Jorge RODRIGUEZ ROMERO 1 EU Water Framework Directive Improving the communication of the intercalibration exercise WG A ECOSTAT meeting Ispra, March.
Framework for the intercalibration process  Must be simple  Aiming to identify and resolve big inconsistencies with the normative definitions and big.
WG2A meeting 7-8 October 2004 Working Group 2A ECOSTAT Agenda item 9b Discussion on final Intercalibation register.
Working Group 2A ECOSTAT Finalisation of the intercalibration register Presented by Wouter van de Bund Joint Research Centre Institute for Environment.
Working Group 2A ECOSTAT progress report Presented by Wouter van de Bund Joint Research Centre Institute for Environment and Sustainability Inland.
Task on Harmonisation of Freshwater Biological Methods
Intercalibration excersice progress report Presented by Palle Haastrup Joint Research Centre Institute for Environment and Sustainability Inland.
Intercalibration Results 2006
Common Implementation Strategy for the Water Framework Directive Working Group A ECOSTAT Ecological Status 7th Meeting Stresa, Lago Maggiore, Italy
Working Group A ECOSTAT October 2006 Summary/Conclusions
Synthesis of the intercalibration process Working group 2.5.
Working Group 2A ECOSTAT Objectives & Agenda of the meeting March 2005
Working Group 2A ECOSTAT progress report Presented by Wouter van de Bund Joint Research Centre Institute for Environment and Sustainability Inland.
Development of guidelines
Improving assessment of GES Draft conclusions and Way forward
EU Water Framework Directive
CIS General progress report WD meeting 16 June 2008 Jorge Rodríguez Romero, Unit D.2, DG Environment, European Commission.
Draft Commission Decision on Intercalibration
Task 1 - Intercalibration WG 2A ECOSTAT - Intercalibration
Working Group 2A ECOSTAT Intercalibration process - state of play Wouter van de Bund & Anna-Stiina Heiskanen Joint Research Centre Institute for Environment.
Working Group A Ecological Status - ECOSTAT WFD CIS Strategic Coordination Group meeting, October 2005 Progress in the intercalibration exercise.
Harmonisation Activity Progress report
Intercalibration Timetable
Discussion agenda Summary & proposals (30 min)
Common Implementation Strategy for the
Update on progress since last WG meeting (13-14 June 2002)
Meeting of the WFD CIS Working Group 2A ECOSTAT Introduction & objectives Presented by Anna-Stiina Heiskanen Joint Research Centre The Institute.
Working Group A Ecological Status - ECOSTAT State of play in the intercalibration exercise Water Directors Meeting, November 2005.
on a protocol for Intercalibration of Surface Water
Meeting of Water Directors Future Work Programme of the CIS
Progress Report Working Group A Ecological Status Intercalibration (1) & Harmonisation (3) Activities Presented by Anna-Stiina Heiskanen EC Joint Research.
Intercalibration Decision and Technical Report
of the Work Programme 17. March 2003
Activities of WG A Ecological Status
WG A Ecological Status Progress report April-October 2009
Water Directors meeting Mondorf-les-bains, June 2005
EU Water Framework Directive
Working Group A ECOSTAT progress report on Intercalibration Presented by Wouter van de Bund Joint Research Centre Institute for Environment and Sustainability.
Working Group 2A ECOSTAT progress report Presented by Wouter van de Bund Joint Research Centre Institute for Environment and Sustainability.
ECOSTAT 2013 – 2015 Tasks and Deliverables
Water Directors meeting Warsaw, 8-9 December 2011
WG 2.3 REFCOND Progress report for the SCG meeting 30 Sep-1 Oct 2002
Water Directors meeting Spa, 2-3 December 2010
Legal issues and compliance checking in WFD implementation SCG meeting 5-6 November 2008 Jorge Rodríguez Romero, Unit D.2, DG Environment, European.
Working Group 2A ECOSTAT Guidance for the intercalibration process Wouter van de Bund Joint Research Centre Institute for Environment and Sustainability.
River groups with extension
WG A ECOSTAT Intercalibration guidance : Annexes III, V, VI
Guidelines to translate the intercalibration results into the national classification systems and to derive reference conditions Presented by Wouter.
Standardisation/Harmonisation
Working Group A Ecological Status - ECOSTAT WFD CIS Strategic Coordination Group meeting, 22 Febraury 2006 Progress Report.
Common Implementation Strategy for the
WG A Ecological Status Progress report April-October 2010
EU Water Framework Directive
Reporting template for milestone reports
Common Implementation Strategy for the
Planning to develop the CIS Work Programme
EU Water Framework Directive
WFD CIS WG ECOSTAT meeting on 8-9 October 2007 Objectives What do we need to achieve during this meeting?
WG A ECOSTAT Draft Mandate
Harmonisation Activity Progress report
Working Group 2A ECOSTAT progress report Presented by Wouter van de Bund Joint Research Centre Institute for Environment and Sustainability Inland.
Intercalibration round 2: finalisation and open technical issues – RIVERS ECOSTAT October 2012.
EU Water Framework Directive
EU Water Framework Directive
WG A Ecological Status Progress report October 2010 – May 2011
Why are we reviewing reference conditions in intercalibration?
Presentation transcript:

WFD – CIS Working group A ECOSTAT Brussels 12-13 October 2006

Objectives of the 10th meeting Agree on results to be included in the draft Commission decision on intercalibration Detailed timetable for finishing exercise by June 2007 QEs that will be completed by June 2007? Agree on the work programme CIS 2007-9;

Final MI6 results from GIGs 1) July06 QEs (green boxes) Task Who does Who receives Status? Update version 3.1 of GEP “Alternative methodology…” paper WGLs (U. Irmer) ECOSTAT Version 2.0 proposal on standardized biological methods to Annex V of WFD for consultation Harmonisation steering group ECOSTAT, CEN Final updates on DG ENV table (GIG/ Biological QE-specific IC results 2006-2007) GIG coordinators DG ENV, IC steering group Final MI6 results from GIGs 1) July06 QEs (green boxes) WGL, DG ENV Final MI6 results from GIGs 2) Oct06 QEs (grey boxes) 1st DRAFT Commission Decision (CD) and technical IC report; ECOSTAT & GIGs Prepare a paper on applicability of the Boundary Setting Procedure in GIGS ECOSTAT Meeting in Brussels, Belgium JRC/ DG ENV 12-13 October Final written comments on the 1st draft CD and technical IC report 20 October 2nd draft CD and technical IC report SCG/ WFD Committee 25 October SCG/ WFD Committee meeting 8-9 November

Discussion issues proposed by SCG Are all quality elements applicable as indicated in general table? (e.g. phytobenthos for alpine lakes, macrozoobenthos for mediterranean reservoirs,…) Fixed/ same values for EQR scale (e.g. Alpine lakes) or simple ratios btw RC and observed values (e.g. Northern & Central lakes)? Further issues presented by Jorge