354th Contracting Squadron “Icemen Buy, Eielson Flies!”

Slides:



Advertisements
Similar presentations
Tam Valley School Modernization - Phase 1 Summer 2011.
Advertisements

UNIVERSITY OF ALASKA FAIRBANKS Capital Projects Update Admin Services Open Forum October 11, 2011.
MARPLE NEWTOWN SCHOOL DISTRICT FACILITIES. Maintenance & Small Projects Planned for Summer 2007 New carpet at Worralls office New fencing at Worralls.
Recent Bond Accomplishments. Bordeaux Elementary Remodel.
COMING NOVEMBER 2012 SHAWNEE HEIGHTS BOND REFERENDUM MORE INFORMATION WILL BE AVAILABLE SOON ON THE SHAWNEE HEIGHTS DISTRICT HOMEPAGE.
Or... What happens when Sponge Bob meets Bob the Builder??? 1.
Update on FCPS Construction/Renovation Projects August 2009.
Del Mar Union Schools Facilities Master Plan Update September 19, 2012.
Cambrian School District 5-year Facilities Maintenance Plan Update 8/25/11.
Current Project Update October 25th 2012 Good Evening!!!
Greenbush School Maintenance Calendar. JULY Week 1 ❏ Check clock systems ❏ Fertilize athletic fields ❏ Drag and roll baseball/softball fields ❏ Clean.
Finance and Facilities. DuPage County, IL EAV Growth History (Five Year Average: -2.15%)
Public Works Institute April 8, 2014 Bob Hartnett Deputy Director of Public Works Steve Aldridge City Architect.
75th Civil Engineer Group BE AMERICA’S BEST Operations Squadron Projected Requirements Harry Briesmaster III 75 CEG/CL
Cassidy Elementary – Renovation Architect: Tate.Hill.Jacobs: Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010.
BAYSIDE UNIVERSITY OF MASSACHUSETTS BOSTON MAIN CAMPUS UNIVERSITY OF MASSACHUSETTS BOSTON 1 Administration & Finance Facilities Department FY13 Budget.
MCPS MAINTENANCE AND CAPITAL IMPROVEMENTS 2015 – 2016 BUDGET.
Facilities Improvements and Bond Construction Update Facilities Advisory Committee Long Beach Community College District Septmeber 24, 2009 EDUCATE  ENGAGE.
Russell Cave Elementary – Renovation Architect: Pearson & Peters Architects General Contractor: Congleton-Hacker Construction Substantial Completion Date:August,
Russell Cave Elementary – Renovation Architect: Pearson & Peters Architects General Contractor: Congleton-Hacker Construction Substantial Completion Date:August,
Maryland Transportation Authority (MDTA)
Facilities Maintenance Department LtCol Todd A. Kerzie Facilities Maintenance Officer (760) 725 – 3807 Mr. Jeff Hunt Maintenance Control Director Marine.
Architect Drawing of New Entrance. Location Location of Phase II Construction Project – Old tennis courts west of the existing building.
Albemarle County Public Schools Design for Vehicle Maintenance Facility Improvements September 10, 2009 R A N C O R N W I L D M A N A r c h i t e c t s.
Brentwood Union Free School District 2006 Bond Referendum Capital Improvement Program Pool Phase, Phase IA, II, III, and IV. April 28, 2008 Prepared by:
Board of Education Presentation 2015 Referendum Projects September 9, 2015 Update.
We provide and maintain all utilities such as Electricity, Water, Waste Water, Heating and Cooling Services, Refuse Collection, and the Garrison Recycling.
HISTORICAL INFORMATION Professional Staff at Peak of Enrollment 1 Superintendent 1 Assistant Superintendent 1 Director of Secondary Education.
COMPULSORY PRE-BID MEETING. AGENDA  WELCOME & INTRODUCTION  PRESENTATION  INDUCTION SESSION  SITE VISIT  QUESTION & ANSWER SESSION  SIGNING OF SITE.
Sinking Fund Millage Renewal Election- May 7, 2013.
1 Drivers for Building Life Cycle Integrations Jim Sinopoli.
Return With Honor Zappalá Return With Honor Zappalá-2001.
Wal-Mart Superstore in San Angelo Texas. Wal-Mart Threat Assessment Vandelism Theft of merchandise Theft of store supplies Illegal entry into facility.
2014 construction bond planning Needs assessment- what are we missing Site visits- in and out of district Safety concerns Life cycle evaluations- where.
11th Wing The Chief’s Own! Lt Col Rockie Wilson, PE Commander, 11th Civil Engineer Squadron SMART Procurement Conference: Joint Base Andrews Infrastructure.
GTPE 04/06/15 L. Scibile 04/06/ EDMS:
Steering Committee 69 “Training and Developing Tomorrow’s NATO Air Warriors Today!” FY15 Wing Commander Projects Colonel Gregory Keeton Wing Commander.
Building Renovation Updated Plans. Welcome History Original structure was built during Civil War Past renovations – 1961 – 1978 – 2001.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Headquarters U.S. Air Force Air Force Design & Construction Mr. Robert Gill, P.E. 1.
Gates County Schools Maintenance Department Maintaining and Renovating Today’s Schools For Tomorrow’s Students.
Energy Huntsville Opportunity Report and Government Collaboration June 2016.
FY2017-FY2026 GDRSD Capital Plan-June 22, 2016 Jared Stanton, Director of Business and Finance.
Big Cypress Basin Capital Project Update Jeffrey Kivett, P.E., Director Operations, Engineering and Construction Division Jeffrey Kivett, P.E., Director.
Department of Public Works FY Capital Improvement Program (CIP) Budget Adoption & Amendments to FY 16 CIP May 16, 2016.
Madison Elementary School District
Infrastructure Revitalization Project
Vassar strong vision Inspire Future Excellence…Learn, Achieve, Succeed
***No expected disruptions to normal CDC operations***
Apalachicola Regional Airport
Woodland Public Schools
VIRGIN ISLANDS PORT AUTHORITY
WAYNE STATE UNIVERSITY
2015 School Bond Construction Program
Five Year Capital Projects Plan Through
CITY OF NORFOLK, NEBRASKA
Cornwall Central School District
Capital Improvements Presentation
Siskiyou Power Authority
Joint Base Langley – Eustis Overview
Hopewell Valley Regional School District
The summer of 2018 and all the work that has taken place
College Council Meeting September 7, 2018
Community Life at St. Giles
PUBLIC INFORMATION SESSION
Recent Bond Accomplishments
413th CSB REGIONAL CONTRACTING OFFICE – ALASKA &
Public Works 2020 Budget and CIP Review.
377th Mission Support Group/ Contracting Division Construction Branch
Society of Military Engineers Monthly Meeting, October 11, 2018
Project focus areas FY20+ Potential contract opportunities
Presentation transcript:

354th Contracting Squadron “Icemen Buy, Eielson Flies!” Mr. Greg Johnson 907-377-2464

Mission Partners 354th Fighter Wing 168 WG ASOG – Multiple Locations F-35 program RF-A / Aggressors CES, LRS, MXG, MDG… 168 WG ASOG – Multiple Locations Det 1 - “Cool School” Arctic Survival Clear AFS - ASPC Det 460 (AFTAC) Patrick AFB AFOSI, Det 632

Construction at a Glance 5-Year Obligation History FY 18 134 $23M FY 17 160 $16M FY 16 210 $15M FY 15 180 $11M FY 14 202 $17M

Anticipated Contracts FY19 (1 Oct 18- 30 Sep 19) Anticipated Contracts FY19 Project Title Magnitude Remarks Method DSN‐ Repair CHPP Electrical Pnls&Circuits PH C (B6203) Between $100,000 and $250,000 Design A-E Design DSN‐ Repair Hursey Gate Final Denial Barrier DSN‐ Renovate CAC (B1300) Between $250,000 and $500,000 DSN‐ Repair Oscar Row Apron DSN‐ Repair Water Diversion Box at CHPP (B6203) Renovate PDF Rooms in B4370 Between $25,000 and $100,000 Construction SABER Replace Water Lines and Heat Trace from Well to B1099 Upgrade Flightline Ramp Lighting Replace Lights with LEDs in LRS Warehouse (B3426) Construct Storage for Snow Barn Between $500,000 and $1,000,000 F‐35 Renovate Muns Inspection Fac (B1324) for Blast Prot IFB Repair CHPP Reverse Osmosis Systems (B6203) Anti-Vehicle Cable and Fencing Along Richardson Highway Between $1,000,000 and $5,000,000 Ph B Repair Low Bay & Office Lighting & Controls (Multi) Repair Thunderdome Roof (B1140) Install Audible Fire Alarm Devices in CDC (B5182) F‐35 Renovate Engine MX Fac (B1346) for Metals Tech, NDI Repair Black Start Generator (B6203) Repair CHPP Electrical Pnls&Circuits PH B (B6203) Repair Runway Edge Lights F‐35 Renovate Permanent Party Dorm (B2262) Between $5,000,000 and $10,000,000

Anticipated Contracts FY20/FY21 Anticipated Contracts FY20 Project Title Magnitude Planned Fiscal Yr Replace Sewer Line and Add Heat Trace from B1147 to B1148 Between $250,000 and $500,000 2020 Repair Opacity Readers on Boilers (B6203) Repair CHPP Electrical Pnls&Circuits PH C (B6203) Between $1,000,000 and $5,000,000 Repair Complete HVAC System (B1138) Construct Hursey Gate Final Denial Barrier and Road Repair Structural Columns of the Thunder Dome (B1140) Construct Storage for Snow Barn Repair Parachute Shop (B1161) Between $5,000,000 and $10,000,000 Repair South Ramp Entrance Taxiway T39A (B8021) Repair Storage Area for Contractors (B2204) Between $100,000 and $250,000 2021 Repair Fire Pump at Base Supply (B3426) Renovate Nose Dock 7 Exterior (B1232) Repair Roof: Maintenance Hangar Nose Dock 7 (B1232) Repair Concrete and Generator (B2258) Repair Boiler Stack in CHPP (B6203) Between $500,000 and $1,000,000 Install Locks on Utilidor Manhole Lids (B9000) Repair Concrete Pads on Runway Repair CEMAS Parking Lot (B9060) Repair Water Diversion Box at CHPP (B6203) Repair Fire Suppression System (B3425) Repair South Loop Taxiway Phase 1 Repair Papa Quebec Pavement Repair Oscar Row Apron

Questions