Carl Steinhauer Consultant

Slides:



Advertisements
Similar presentations
1 Radio Maria World. 2 Postazioni Transmitter locations.
Advertisements

EcoTherm Plus WGB-K 20 E 4,5 – 20 kW.
Números.
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
AGVISE Laboratories %Zone or Grid Samples – Northwood laboratory
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
SKELETAL QUIZ 3.

Section 7.3 (p. 259). Vocabulary List the 3 measures of Central Tendency List the 3 measures of Central Tendency A) Mean ( ): _________________________.
Fill in missing numbers or operations
Reflection nurulquran.com.
EuroCondens SGB E.
Worksheets.
Assessing Quality of Asphalt Paving Jobs to Determine Contractor Pay Robin C. Wurl James R. Lundy 2003 Quality & Productivity Research Conference.
STATISTICS Linear Statistical Models
Addition and Subtraction Equations
Multiplication X 1 1 x 1 = 1 2 x 1 = 2 3 x 1 = 3 4 x 1 = 4 5 x 1 = 5 6 x 1 = 6 7 x 1 = 7 8 x 1 = 8 9 x 1 = 9 10 x 1 = x 1 = x 1 = 12 X 2 1.
Division ÷ 1 1 ÷ 1 = 1 2 ÷ 1 = 2 3 ÷ 1 = 3 4 ÷ 1 = 4 5 ÷ 1 = 5 6 ÷ 1 = 6 7 ÷ 1 = 7 8 ÷ 1 = 8 9 ÷ 1 = 9 10 ÷ 1 = ÷ 1 = ÷ 1 = 12 ÷ 2 2 ÷ 2 =
Disability status in Ethiopia in 1984, 1994 & 2007 population and housing sensus Ehete Bekele Seyoum ESA/STAT/AC.219/25.
By John E. Hopcroft, Rajeev Motwani and Jeffrey D. Ullman
1 When you see… Find the zeros You think…. 2 To find the zeros...
12.3 – Analyzing Data.
CALENDAR.
QUALITY CONTROL AND ACCEPTANCE
Massachusetts 2009 Child Care Market Price Study Mills Consulting Group, Inc. Goodman Research Group, Inc. The Massachusetts CCRR Network.
Prime and Composite Numbers. These are numbers that have only two factors – themselves and one. These are numbers that have only two factors – themselves.
Summative Math Test Algebra (28%) Geometry (29%)
Lecture 7 THE NORMAL AND STANDARD NORMAL DISTRIBUTIONS
ASCII stands for American Standard Code for Information Interchange
Identifying money correctly 1
Grade D Number - Decimals – x x x x x – (3.6 1x 5) 9.
The 5S numbers game..
突破信息检索壁垒 -SciFinder Scholar 介绍
A Fractional Order (Proportional and Derivative) Motion Controller Design for A Class of Second-order Systems Center for Self-Organizing Intelligent.
Sampling in Marketing Research
7/19/2002 Kenneth John Webb Page 1 COMPARING EMISSION MEASUREMENTS IN A REVERBERATION CHAMBER AND A SEMI-ANECHOIC CHAMBER By Kenneth John Webb Principal.
The basics for simulations
© 2010 Concept Systems, Inc.1 Concept Mapping Methodology: An Example.
MM4A6c: Apply the law of sines and the law of cosines.
Look at This PowerPoint for help on you times tables
Figure 3–1 Standard logic symbols for the inverter (ANSI/IEEE Std
Regression with Panel Data
1 Prediction of electrical energy by photovoltaic devices in urban situations By. R.C. Ott July 2011.
TCCI Barometer March “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
Statistics Review – Part I
Progressive Aerobic Cardiovascular Endurance Run
TCCI Barometer September “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
When you see… Find the zeros You think….
2011 WINNISQUAM COMMUNITY SURVEY YOUTH RISK BEHAVIOR GRADES 9-12 STUDENTS=1021.
Before Between After.
2011 FRANKLIN COMMUNITY SURVEY YOUTH RISK BEHAVIOR GRADES 9-12 STUDENTS=332.
Foundation Stage Results CLL (6 or above) 79% 73.5%79.4%86.5% M (6 or above) 91%99%97%99% PSE (6 or above) 96%84%100%91.2%97.3% CLL.
Numeracy Resources for KS2
1 Non Deterministic Automata. 2 Alphabet = Nondeterministic Finite Accepter (NFA)
Static Equilibrium; Elasticity and Fracture
ANALYTICAL GEOMETRY ONE MARK QUESTIONS PREPARED BY:
Resistência dos Materiais, 5ª ed.
Copyright © 2013 Pearson Education, Inc. All rights reserved Chapter 11 Simple Linear Regression.
Lial/Hungerford/Holcomb/Mullins: Mathematics with Applications 11e Finite Mathematics with Applications 11e Copyright ©2015 Pearson Education, Inc. All.
Unit 4 – Probability and Statistics Section 12.7 Day 10.
Take any two digit number between 11 to Add the numbers (Example: Number 54 : 5+4=9). 2. Now subtract the answer from original number (i.e. 54-9=45,
Biostatistics course Part 14 Analysis of binary paired data
UNDERSTANDING THE ISSUES. 22 HILLSBOROUGH IS A REALLY BIG COUNTY.
Chart Deception Main Source: How to Lie with Charts, by Gerald E. Jones Dr. Michael R. Hyman, NMSU.
Commonly Used Distributions
Introduction Embedded Universal Tools and Online Features 2.
úkol = A 77 B 72 C 67 D = A 77 B 72 C 67 D 79.
Schutzvermerk nach DIN 34 beachten 05/04/15 Seite 1 Training EPAM and CANopen Basic Solution: Password * * Level 1 Level 2 * Level 3 Password2 IP-Adr.
ERLPM Workshop Statistical Analysis
Presentation transcript:

Carl Steinhauer Consultant Statistical Analysis Carl Steinhauer Consultant

Statistical Analysis; PWL Estimate Verify Production Process: Payment Overview P 401 Test Results Statistical Analysis; PWL Estimate Verify Production Process: Payment

Theory Assumptions Normal Distribution Tools: Average and Standard Deviation Percent Within Limits (PWL) Concept

Assumptions Limited # of test results Statistical Analysis Quality characteristics of large amount of material Test result variability Components: materials sampling-ERLPM testing-ERLPM Same Process Random sampling-Lot, Sublot Normal Distribution

Specific Procedures Sublots, Lots, Partial Lots Calculations Retesting Outliers

Estimate average and % within limits Limit # of samples Statistical Analysis Estimate average and % within limits Analysis % Taller than 5’-5” % between 5’-5” and 6’-5” Average Height

96 tests n=100

x x+/- 1Sn=68% x+/-2Sn+95% x+/-3Sn+99.7%

PWL-% of test result exceeding L L=spec lower tolerance limit eg. Mat density 96.3 for P401

PWL Calculation Procedures ERLPM-page 47 Section 110-AC 1505370-10A Method for Computing PWL and Examples Section 110-02 Spec. P401 Table 5-L and U Spec. Limits (page 24)

Given x1=2 x2=4 x3=6 x4=8   X = 2+4+6+8 = 5 4

Sn = d1²+d2²+d3²=d4² n-1 Sn = 9+1+1+9 = 20 4-1 3 Sn =2.58 X=5 d1=2-5=-3 d1²=9 d2=4-5=-1 d2²=1 d3=6-5=1 d3²=1 d4=8-5=3 d4²=9 Sn = d1²+d2²+d3²=d4² n-1 Sn = 9+1+1+9 = 20 4-1 3 Sn =2.58 (calculator n-1)

Roundout Rules ERLPM-page 47 Example-last digit to be kept-nearest 10th 4.61 4.62 4.64 4.6500 4.66 4.67 4.68 4.69 Even Digit-same Odd Digit-increase by 1 This case becomes 4.6 If it was 4.7500 it would become 4.8 becomes 4.7

MAT Density Manual Appendix E, page 4 Sublot 1. = 96.0 2. = 97.0 3. = 99.0 4. = 100.0 x=98.0 Sn=1.8 QL=x-L Sn QL=98.0-96.3 = .9444 1.8 Section 110-Table l, N=4 PL=82 Section 110-02f Spec Tables 5 page 50 ERLPM

Target Density 98.0 Achieved Sn=1.8 versus 1.3 MAT Density PL = 82% 98.0 18% 96.3 Target Density 98.0 Achieved Sn=1.8 versus 1.3 Acceptable QC Value

Effect of Quality Control Sn = 1.3 Spec. pg 24 Sn = 1.8 82 PWL 90 PWL 96.3% 98% x

Air Voids App. D, page 3 Sublot 1= 2.1 2= 3.2 3=2.5 4=6.0 X= 3.4 Sn= 1.76 Spec. page 5 - 0.65

QL = x-L = 3.4-2.0 = .7955 Sn 1.76 PL(table 1) = 77% n=4 QU= U-x = 5-3.4 = .909 Sn 1.76 PU(table 1) = 81% PWL= PL + PU-100 PWL= 77+81-100 = 58

Air Voids 58% 23% 19% 2 5 3.4 PWL= PL + PU-100 PWL= 77 + 81-100 =58

Payment Spec-par 401-8.1a-page 29 MAT Density PWL=82 Air Voids PWL= 58 Lot Pay Factor Air Voids- 1.4 x 58-12= 69.2% Mat Density- 0.5 x 82+55= 96% Use lower of 2 values- 69.2% Lower value

Joint Density Appendix E, page 5 93.3 95.0 97.0 96.0 X= 95.3 Sn= 1.58 QL= (95.3-93.3) = 1.2658 1.58 PL= 93 Spec. page 21 par. 401-5.2(b)(3) if < 71% there is a 5% penalty Table 5

Partial Lots spec page 20 Section P-401-5.1c

Partial lot situation-6 sublots Corrective Action! 401-5.2(b)(2) Sample Problem Flow-Appendix D, page 5 Partial lot situation-6 sublots 8.0, 8.2, 8.5, 8.2, 8.9, 9.1 X= 8.5 Sn= 0.44 QL= x-L = 8.5-8.0 = 1.1364; PL= 88 Sn 0.44 QU= U-X = 16-8.5 = 18.75; PL= 100 Sn 0.44 PWL= 88 + 100-100= 88<90 Corrective Action! 401-5.2(b)(2)

MAT Density and Air Voids Outliers Spec -pg 23 401-5.2d -pg 25 401-5.3c MAT Density and Air Voids

Test for Outliers MAT Density 94.0 QL= 96.2-96.3 = -.0585 96.0 1.71 97.0 98.0 x= 96.2 Sn= 1.71 QL= 96.2-96.3 = -.0585 1.71 PL= <50% ASTM E 178, par. 4 T1= (x-x1)/Sn T1= 96.2-94 = 1.286 1.71

Table 1-ASTM E 178 N=4 Upper 5% significance level 1.463 Since 1.286<1.463 the 94.0 test value is not considered an outlier and is retained!

Sample Problem-Outliers Air Voids 2.0, 4.8, 4.9, 5.0 X=4.2 Sn=1.45 QL= 4.2-2.0 = 1.5172; PL= 100 1.45 QU= 5-4.2 = 0.5517; PU= 69 PWL= (100+69)-100=69 ASTM E 178 par. 4 Tn= (x-x1)/Sn = 4.2-2.0 = 1.517 Table 1, ASTM E 178, N=4, 5% significance T= 1.463<1.517 therefore 2.0 is the outlier and it is discarded

Resampling 401-5.3 page 25 MAT Density ONLY (Appendix E-pg 4) Prior MAT Density- 96, 97, 99, 100 PWL 82 4 new cores 96, 96, 97, 98 AVG-all 8, 97.4 Sn= 1.51 QL= x-L = 97.4-96.3 = .7337 Sn 1.51 Table 1, N= 8 PWL= 77

Questions?

Thanks!