Measurement Error Notification Guidelines for NTS to LDZ and LDZ to LDZ Measurement Installations Review 2014.

Slides:



Advertisements
Similar presentations
United Nations Statistics Division
Advertisements

12/10/20141 Project Nexus Workgroup Settlement Issues 15 th May 2012.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Project Nexus Workgroup Unique Sites 4 th November 2014.
PN UNC AMR Topic Workgroup Meeting 19 – Meter Reading.
MP0131: Meter Error Notifications Liz Spierling – July 4 th 2007.
Gas Performance Assurance Framework 11 th January 2013 Confidential.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
1) Establish & Identify Scheme 5) Evolve Scheme 4) Review & Modify Scheme Deliverables 3) Operate the Framework 2) Manage Performance Assurance Scheme.
1 Project Nexus Market Differentiation Workplan Version 0.2 Draft.
DNPD04 LDZ Exit Capacity Charges- Discussion Report Denis Aitchison 27 th July 2009.
PN UNC Workgroup iGT Services 7 th February 2012.
1 Modification 437 – Blank MAM Identities Distribution Workgroup December 2012.
Modification Proposal 0395 & 0398 – Limitation on Retrospective Invoicing and Invoice Correction 1 st December 2011.
PN UNC Workgroup Settlement topic 4 th October 2011.
UNC Modification Proposal 0229 Guidelines document.
PN UNC Workgroup Invoicing 24 th October Objectives of the Workgroups To determine detailed business requirements Consider/review comments made.
Modification: Inclusion of as a valid UNC communication Allowing as a valid form of UNC communication in specific circumstances.
Industry Dialogue on xoserve Services 14 th September 2007.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Allocation of capacities. 2 Allocation of Capacities Determination of capacities Calculation of pipeline capacities is based on the physical laws governing.
Transitional Exit Capacity Proposals -Update Transmission Workstream, 1 Dec Nov 05.
David Addison / Steve Deery
SGN Modification Proposal Amendments to UNC TPD OCS Process Long Term Allocation of Capacity for the Transitional Period.
RBD NOTIFICATION PROCESS
Offtake Workstream : 8th September 2010
Transmission Workstream 4th July 2007
PN UNC Workgroup Invoicing 4th October 2011.
Action 0002: Meter Error Notifications
Ofgem RIA – UNC Modification Proposal 0229
UNC Trader User – Licence obligations
Revised registration for unregistered sites
UNC 0407 Analysis Scope - Update
Richard Fairholme, E.ON UK
NTS Entry Charging Review Update
Modification th July 2008.
Project Nexus Workgroup
UNC Mod 273 – Governance of Feasibility Studies
DNPC06 From 1 October 2012 the DNs will pay the NTS Exit Capacity charges to the NTS and recover the cost from shippers DNPC06 put forward for consultation.
Project Nexus Workgroup
0332 – Impact of combining the Entry and Exit Capacity credit processes Chris Shanley.
UNC Modification 0335 – Offtake Metering Error Payment Timescales
LDZ Offtake Meter Orifice Plate Error
MOD Flow Swap Scenario’s – Initial Thoughts
The Necessary Criteria for a UNC Modification Proposal
Modification 0468 – Unique Property Reference Number by Gas Transporters David Addison.
MOD National Grid NTS Initiated Flow Swaps
Modification Proposal 0101 – “Amendment to demand forecasting timings in relation to the Gas Balancing Alert”
Flow Swaps at NTS / LDZ offtakes
Project Nexus Workgroup
Flow Swap Scenarios – Agreed Logic
PN UNC Workgroup Settlement Overview
Proposed Transitional Gas Exit Arrangements
Stefan Leedham 22 November 2007
PN UNC Workgroup (Settlement topic)
Project Nexus Workgroup
MP0131: Meter Error Notifications
Offtake Workstream : 19 March 2012
Topic Register October 2009
Invoicing Proposals 20th May 2013
Proposed Changes to UNC Section Q Emergencies - Mod 035
Transmission Workstream, 1 Mar 07
Project Nexus Workgroup
Project Nexus Workgroup
SEEA Structure proposal
Gas Customer Forum 28 July 2008
Mod UNC 0674 Business Rule Development
RAASP DSC Change Management Committee update
MOD Flow Swap Scenario’s – Initial Thoughts
Presentation transcript:

Measurement Error Notification Guidelines for NTS to LDZ and LDZ to LDZ Measurement Installations Review 2014

Guidelines Review 2014 No fundamental concerns with the guidelines. No requirement for any modifications proposals (to the UNC) as a result of the review? Amendments to the guidelines are anticipated though and these can be agreed by the Workgroup and Offtake Committee (as amendments to the Guidelines). The principle of “the ITE’s decision is final” must be maintained.

Guidelines Review 2014 The flow of the guidelines (words and pictures) is not always clear – separating out each scenario and carrying it through from beginning to end would be useful (e.g. from the decision point of what type of error it is) the process should continue from that point right through to the conclusion of that type of error. Appointment of two experts – seek feedback information on how this worked in practice and any thoughts offered by the ITEs themselves.

Guidelines Review 2014 Proformas/status updates and handoffs/decision points Review Terms of reference for the ITEs Seek Shipper Views….