GLAST LAT Instrument 1 Summary of Progress  Completed TVAC with no additional reboots  Ran refresh rate test showing that the refresh rate was not an.
Advertisements

GLAST LAT ProjectManager’s Face to Face - ISOC, 17 March GLAST Large Area Telescope WBS 4.1.B Instrument Science Operations Center Manager’s Face.
GLAST LAT Project Online Peer Review – July 20, Integration and Test R. Claus 1 GLAST Large Area Telescope: I&T Integration Readiness Review.
GLAST LAT Instrument GLAST Monthly Mission Review August 6, 2007 K. Fouts, SLAC 1 Monthly Mission Review Project Status Overview August 6, 2007 Ken Fouts.
1 GLAST Large Area Telescope Monthly Mission Review LAT Flight Software Status June 6, 2007 Jana Thayer Stanford Linear Accelerator Center Gamma-ray Large.
1 GLAST Large Area Telescope Monthly Mission Review LAT Flight Software Status October 29, 2007 Jana Thayer Stanford Linear Accelerator Center Gamma-ray.
GLAST LAT Project June 6, 2007 NCRs and Waivers 1 GLAST Large Area Telescope Systems Engineering Test Status, NCRs and Verification Status Pat Hascall.
GLAST LAT Project Aug 1, 2007 NCRs and Waivers 1 GLAST Large Area Telescope Systems Engineering Test Status, NCRs and Verification Status Pat Hascall Systems.
1 GLAST Large Area Telescope Monthly Mission Review LAT Flight Software Status May 2, 2007 Jana Thayer Stanford Linear Accelerator Center Gamma-ray Large.
GLAST Large Area Telescope Instrument Flight Software F2F Meeting March 17, 2005 Jeff Fisher FSW Manager Stanford Linear Accelerator Center Gamma-ray Large.
GLAST Large Area Telescope ISOC Review 15 February 2006 FSW Activities, Organization, and Resource Needs Jana Thayer Stanford Linear Accelerator Center.
GLAST LAT Project Oct 5, GLAST Large Area Telescope Systems Engineering Test Status, NCRs and Verification Status Pat Hascall Systems Engineering.
GLAST LAT ProjectGLAST Flight Software IDT, October 16, 2001 JJRussell1 October 16, 2001 What’s Covered Activity –Monitoring FSW defines this as activity.
GLAST LAT Instrument GLAST Monthly Mission Review July 12, 2007 N. Johnson, NRL 1 Monthly Mission Review Project Status Overview July 12, 2007 Neil Johnson.
Event Context Information: Particle Data Run Information Platform, Run ID, TimeStamp Configuration Information Hardware and software configuration keys.
Section 15-1GLAST Ground System Design Review August 18&19, 2004 ISOC Organization ISOC Manager R Cameron Commanding, H&S Timeline Planning Command Generation.
GLAST LAT Project ISOC Peer Review - March 2, 2004 Document: LAT-PR Section 3 LOF Operations Concept 1 Gamma-ray Large Area Space Telescope GLAST.
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 4.11 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
GLAST LAT Project Quarterly Review, Aug. 14, 2001 Gunther Haller1 GLAST Large Area Telescope: Electronics, DAQ & Flight Software Gunther Haller Stanford.
1 GLAST Large Area Telescope Monthly Mission Review LAT Flight Software Status August 1, 2007 Jana Thayer Stanford Linear Accelerator Center Gamma-ray.
ISOC Peer Review - March 2, 2004 Section GLAST Large Area Telescope ISOC Peer Review Test Bed Terry Schalk GLAST Flight Software
GLAST LAT Project Oct 5, GLAST Large Area Telescope Systems Engineering Test Status, NCRs and Verification Status Pat Hascall Systems Engineering.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test One and Two Tower Integration Readiness Review.
GLAST Large Area Telescope ISIS Post Acceptance Test Review 28 January 2005 ISIS Completion Status Jana Thayer Stanford Linear Accelerator Center
GLAST LAT Project May 2, 2007 NCRs and Waivers 1 GLAST Large Area Telescope Systems Engineering Test Status, NCRs and Verification Status Pat Hascall Systems.
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Current Status Sergio Maldonado FSW Test Team Lead Stanford Linear Accelerator Center.
GLAST Large Area Telescope Instrument Flight Software Flight Unit Design Review 16 September 2004 LAT Housekeeping Sergio Maldonado Stanford Linear Accelerator.
GLAST Large Area Telescope Instrument Flight Software Flight Unit Design Review 16 September 2004 Diagnostics Framework James Swain Stanford Linear Accelerator.
GLAST LAT Project4 April 2005 LAT System EngineeringLAT Test Planning Meeting GLAST LAT GLAST LAT System Engineering Gamma-ray Large Area Space Telescope.
GLAST Large Area Telescope Instrument Flight Software Flight Unit Design Review 16 September 2004 Software Watchdog Steve Mazzoni Stanford Linear Accelerator.
GLAST LAT ProjectDOE/NASA Peer Review, March 19-20, 2003 GLAST Large Area Telescope: Electronics, Data Acquisition & Instrument Flight Software Flight.
1 Programming of FPGA in LiCAS ADC for Continuous Data Readout Week 5 Report Tuesday 29 th July 2008 Jack Hickish.
GLAST LAT Project LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering Manager
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Systems Engineering Mike DeKlotz GSFC Stanford Linear Accelerator Center Gamma-ray Large.
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Test Suites (Backup) Stanford Linear Accelerator Center Gamma-ray Large Area Space Telescope.
GLAST Large Area Telescope Instrument Flight Software Flight Unit Design Review 16 September 2004 Instrument Configuration James Swain Stanford Linear.
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 3.21 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
GLAST LAT ProjectCDR/CD-3 Review May 12-16, 2003 Document: LAT-PR Section 5 IOC Subsystem 1 GLAST Large Area Telescope: IOC Subsystems WBS: 4.1.B.
GLAST Large Area Telescope – ISOC Overview and StatusDOE Annual Review, 13 June GLAST Large Area Telescope Instrument Science Operations Center.
GLAST Large Area Telescope Instrument to Spacecraft Interface Simulator (ISIS) Test Readiness Review 15 December 2004 Jana Thayer Eric Hansen Stanford.
GLAST Large Area Telescope LAT Flight Software System Checkout TRR FSW Overview Sergio Maldonado FSW Test Team Lead Stanford Linear Accelerator Center.
GLAST LAT Project September 15, 2006: Pre-Shipment Review Presentation 4 of 12 Flight Software 1 GLAST Large Area Telescope LAT Pre-Shipment Review Flight.
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Test Environment Sergio Maldonado FSW Test Team Lead Stanford Linear Accelerator Center.
GLAST Large Area Telescope Instrument Flight Software Flight Unit Design Review 16 September 2004 Secondary Boot Code (SBC) D.Wood Naval Research Laboratory.
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Software Quality Assurance Kelly Burlingham SQE Stanford Linear Accelerator Center Gamma-ray.
IceCube DAQ Mtg. 10,28-30 IceCube DAQ: Implementation Plan.
GLAST Large Area Telescope Instrument Flight Software Flight Unit Design Review 16 September 2004 Instrument Configuration by File James Swain Stanford.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test Two Tower Integration Readiness Review SVAC Elliott.
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope
Boot Code Readiness Review
GLAST LAT System Engineering
GLAST Large Area Telescope
GLAST Large Area Telescope:
Proposal for LAT Year 1 Data Release Plan
GLAST Large Area Telescope
Thermal Vacuum Test: Plans and Procedures
GLAST Large Area Telescope
LAT Test Results GLAST Large Area Telescope LAT Pre-Shipment Review
GLAST Large Area Telescope
Launch and On-orbit Checkout
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope
GLAST Large Area Telescope: I&T Test Readiness Review
GLAST Large Area Telescope
GLAST Large Area Telescope
GLAST Large Area Telescope Instrument Science Operations Center
GLAST Large Area Telescope:
Presentation transcript:

GLAST Large Area Telescope Gamma-ray Large Area Space Telescope GLAST Large Area Telescope Monthly Mission Review LAT Flight Software Status July 12, 2007 Jana Thayer Stanford Linear Accelerator Center

FSW - Overall Status FQTB completed B1-0-1 upload/regression in progress…

FQTB completed All remaining FSW requirements sold off GRB detection algorithm 5.3.10.2.1 GRB Location Accuracy 5.3.10.2.2 Modification of GRB criteria 5.3.11.3.3 Process Attitude Data 5.3.11.6 GRB Alert Message Latency 5.3.11.7 LAT GRB Repoint Request Message to SC FSW Standards 5.4.1 System of Units (metric system) 5.4.2.x Coordinate Systems (3 requirements) 5.4.3 Resource Margin

B1-0-1 has arrived! Build contents relative to B0-9-0*: GRB algorithm and updates to LAT-GBM interface LCI bug correction Updates to LIM, LATC, event filter, compression Additional monitoring of LAT configuration and CPU performance through housekeeping Regression testing of B1-0-1 on Testbed is complete Standard FSW regression test suite was successful Tested portions of LAT CPT using LICOS in dataflow lab Calibration runs Physics data acquisition runs * Full list of changes available in JIRA

B1-0-1 upload/regression: 7/11/07 11:48 PM B1-0-1 upload started at 5 PM MST on Wednesday, 7-11-07 In progress SIU1 and EPU0 completed No regression tests performed on the LAT yet…

Write-back vs. write-through modes LAT responds to a flag in the secondary boot command to boot in either write-back or write-through mode Write-back mode Nominal mode for on-orbit operations Write-through Ensures cache coherency to capture non-stale information after a watchdog reboot Only useful for watchdog reboots not exception or panic reboots CPU usage is not optimized for running in this mode Approximate factor of 3 hit in CPU performance Why are we operating in write-through mode in the first place? When EMI began, LAT had only 200 reboot-free hours since fix was installed Watchdog reboots represented majority of spontaneous reboots Write-through mode leaves breadcrumbs in case of a watchdog reboot, but comes with a penalty in CPU performance Switch to write-back (nominal) mode for CPT and all future tests 400+ reboot-free hours since reboot fix was installed “Clean break”: EMI is complete CPT next week is an opportunity to get a new baseline in the nominal running mode Since mode is commandable, it requires no effort to switch to write-back

JIRA Metrics as of 11 July 2007 Open issues are divided as follows 22 items approved for B1-0-1 that were not complete in time for the build 16 items associated with a single housekeeping JIRA; split into 16 for tracking purposes 2 JIRAs dealing with configurations and/or ground software changes Of the 4 remaining, only one is crucial – addition of event summary statistics 16 planned for B2-0-0 (post L+60) 13 deferred indefinitely 2 being investigated 3 on FSW CCB agenda

Backup GLAST Large Area Telescope Monthly Mission Review Gamma-ray Large Area Space Telescope GLAST Large Area Telescope Monthly Mission Review Backup Stanford Linear Accelerator Center

B1-0-1 leftovers Configuration file changes Addition to housekeeping – tracked as individual JIRAs B1-0-1 leftovers Key Summary FSW-305 Summary/statistics telemetry stream needs to be created for on-board event processors FSW-806 Revisit rate counter implementation FSW-789 LCI event data is inconsistent if TEM errors or diagnostics present FSW-582 Capture of layer splits in LATC does not consider the FE mode registers FSW-938 LMC Delta timestamp telemetry field description is incorrect FSW-917 Implement the filter parameters described in TD-08805-01 FSW-948 Add LPA_DB instance ID to housekeeping FSW-946 Add LATC info to housekeeping telemetry FSW-950 Add GRB GBM and EPU states in housekeeping FSW-949 Add default values of LATC, LPA_DB and LATC ignore files for physics acquisitions to housekeeping FSW-947 Add LCI program file ID to housekeeping FSW-945 Add PDU/GASU power and CRU Configuration register info to housekeeping FSW-944 Add LHK configuration files in use to housekeeping FSW-943 Put LRA in charge of tracking GEM sent, prescaled, discarded, livetime, deadzone for housekeeping FSW-942 Add simulating/not simulating info for THS time tone and time hack to housekeeping FSW-941 Add memory scrub info to housekeeping FSW-918 Include Run ID in housekeeping FSW-934 Add telemetry to report on LAT power state and state/configuration of physics data acquisition FSW-951 Add "dirty" flag in housekeeping to indicate non-nominal configuration change FSW-939 Add LTC configuration file ID to housekeeping