Allocation of Risk Arising from Subsurface Conditions

Slides:



Advertisements
Similar presentations
A GIA is a contract between a surety company and a contractor (or subcontractor)/principal. A GIA is a standard, typical document in the construction.
Advertisements

Construction Contracting
Managing Construction Risks
CARLIN LAW GROUP, APC Grounds for Additional Time and/or Compensation A.Express Changes B.Constructive Changes C.Differing Site Conditions D.Express Suspension.
Construction Cost Estimating Class #2: Contract Documents Prof. Ralph V. Locurcio, PE.
Fixed price contract: A contract that provides a price for each procurement item obtained under the contract.
Construction Engineering 380 Subsurface Conditions.
Modern Application of the Spearin Doctrine
CARLIN LAW GROUP, APC (619) Know Your Indemnity Obligation Know Your Risk Know Your Insurance Company by KEVIN R. CARLIN, ESQ.
DPW General Conditions Articles 32 through 37. Articles Covered Today  32 Owner’s Right to Withhold Payment  33 Owner’s Right to Stop Work and Terminate.
Latent Conditions : Site Investigation and Dispute Avoidance
Community Facility Loans/Grants Architect Flow Chart Owner has need for project. RD Area Office is contacted. RD visits project site and discusses project.
Disposing of a Property Asset Russell Martoo Managing Director RCP Project Management – Development Management – Project Programming – Delay Claim Advisory.
Time for a new standard - AS General Conditions of Contract
THE PROJECT TEAM TYPICAL REQUIREMENTS AND RESPONSIBILITIES OF THE PROJECT TEAM TRADITIONAL TEAM ORGANIZATION AND VARIATIONS THE OWNER’S TEAM THE DESIGN.
1. Identify Stakeholders 2. Establish the Criteria 3. Identify Potential Sites 4. Initial Screening/ Evaluations & Short List 5. Specific Site Study 6.
Insurance provisions under JCT 1998 and JCT Standard Building Contract 2005 Brian Lewis – QBE CAR.
Mikael Wahlgren NCC Construction Sverige AB ESCL Conference August 25th 2006 – Risk in Construction and how to deal with them. Duty for the contractor.
1 A SDB contractor was awarded a $6.2 million contract to construct two buildings in Hawaii that were 300 yards apart and 700 yards from the ocean. The.
SPDES General Permit for Stormwater Discharges During Construction Activity GP Mike Jurkowski, CPESC, NYSDOT - Summary of Changes From GP
1 Contractual Risk Allocation Provisions Presented by: Rolly Chambers & Gene Rash Smith, Currie & Hancock, LLP March 5, 2013.
© 2009 Gibbs, Giden, Locher & Turner LLP - All Rights Reserved 1 The Spearing Doctrine and Definitions of “Complete” Construction Documents Presented by.
S10 CONS5Q25 Lara Tookey. Review of estimators workings Decision on what margin to apply Bid submission details Submit your Tender.
Compensation events and claims Presented by Prof. Khem Dallakoti.
Risk Assignment in The Delivery of a Project  RISK! –Construction projects have lot of it –Contractors manage it –Owners pay for it.
FAR Part 31 Contract Cost Principles and Procedures.
CONSTRUCTION CONTRACTS PRIME CONTRACTS Format and Major Components CHAPTER - 4.
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
7 Plant, Materials and Workmanship. 7.1Manner of Execution The Contractor shall carry out the manufacture of Plant, the production and manufacture of.
Angelica R. Armenta FAR Study Group – Jan Only contracting officers acting within the scope of their authority are empowered to execute contract.
Conditions Of Contract For Construction Conditions Of Contract For Construction Presented BY : Arch. INA’AM J. El TAWIL FIDIC 1999Conditions of Contract.
CHANGES AND WHAT THEY MEAN FOR YOU 2013 EJCDC CONSTRUCTION DOCUMENT SERIES Matthew Skidmore, P.E. NC AWWA-WEA 95 TH ANNUAL CONFERENCE.
Pre-Construction Activities to include: - Provide effective overlap period and oversight of effort - Estimates during - CPM Schedule - Identify lead-time.
1 A SDB contractor was awarded a $6.2 million contract to construct two buildings in Hawaii that were 300 yards apart and 700 yards from the ocean. The.
BIDDING PRIVATE AND PUBLIC WORK Major Differences between Private and Public How to determine whether a project is Public or Private: "Who owns the dirt"
Differing & Unforeseen Conditions Differing Site Conditions- actual conditions differ from the representation made in the contract documents (MSP airport)
CVE 4070 Construction Engineering Changes & Extra Work Prof. Ralph V. Locurcio, PE.
© Hendrick, Phillips, Salzman & Flatt, P.C. – March 8, 2016 What Roofing Contractors Should Look Out For and Include in Contracts and Warranties March.
Article 4 [Obligations of Applicant] 4.1. As a sole and exclusive owner of the Application, Applicant warrants that.
Amendments to the Public Works Contracts
MACDC Intercounty Drain Procedures Training
Insurance in Construction
Mike Ellis Executive Director – Property + Projects
Waller Lansden Dortch & Davis
PRE-SUIT CONSIDERATIONS
What Small and Emerging Contractors Need to Know Introduction to Construction Risks and Contracting Practices © Copyright 2017 NASBP.
Things to look for in owner contracts
Bills of Quantities Introduction to FIDIC - Bills of Quantities -
AUDIT LECTURE 6 AUDIT EVIDENCE HOLY KPORTORGBI
Particular Conditions of Contract & Appendix to Tender
Administration of a FIDIC Contract - Pre-Contract Phase -
Case Road Sewer Joe Mouawad, P.E. October 27, 2016.
The Role of Experts in Construction Arbitration
Real Estate Law
Extension of time and how it is granted to a contractor (Referencing JCT 2005)
What Small and Emerging Contractors Need to Know Understanding General Agreements of Indemnity © Copyright 2017 NASBP.
Particular Conditions of Contract & Appendix to Tender
9/18/2018 Bids CONTRACTING Khamis…..
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
Architecture during Construction ‘observation administration’
Speaker: Sarah Chambers, Esq. Claims Counsel| Professional Liability
THE ROLE OF THE PLANSET IN CONTRACT DOCUMENTS
Prime Contractor Performance
Top 10 types of claims— and tips to avoid them
ESTIMATION Estimation is the scientific way of working out the approximate cost of an engineering project before execution of the work. It is totally different.
Balancing and Managing Risk From the Design Builder’s Point of View
Unique General Conditions of the Alabama Building Commission (ABC)
BUILDING DEFECTS: a legal perspective
2265 A Street, Santa Maria, CA Al Segal Senior Vice President
GBRs - Ground models you can just make up ?
Presentation transcript:

Allocation of Risk Arising from Subsurface Conditions Richard H. Allen, Attorney & Shareholder, Capell & Howard P.C.

Traditional Rule Absent contract provisions allocating the risk differently, the traditional rule is that the contractor bears the risk for any unforeseen contingencies that made performance of its contract more difficult and expensive. See Commercial Contractors, Inc. v. Sumar Constructors, Inc., 302 So.2d 88, 91 (Ala. 1974); United States v. Spearin, 248 U.S. 132 (1918). To avoid increased cost to owners caused by contingency pricing, most construction contracts now allocate the risk for “changed conditions” or “differing site conditions” to the owner rather than the contractor, or at least shared risk. Always open to negotiation. Alabama Construction Law Summit – Dec. 5, 2017

Concealed or Unknown Conditions § 3.7.4 Concealed or Unknown Conditions. If the Contractor encounters conditions at the site that are (1) subsurface or otherwise concealed physical conditions that differ materially from those indicated in the Contract Documents or (2) unknown physical conditions of an unusual nature, that differ materially from those ordinarily found to exist and generally recognized as inherent in construction activities of the character provided for in the Contract Documents, . . . if the Architect determines that they differ materially and cause an increase or decrease in the Contractor’s cost of, or time required for, performance of any part of the Work, will recommend an equitable adjustment in the Contract Sum or Contract Time, or both. This type of clause typically permits the contractor to recover for two types of differing site conditions: Type 1 conditions are those differing materially from the conditions indicated or referred to in the contract documents. Type 2 conditions are those differing from the conditions ordinarily expected in the kind of work required by the contract. Alabama Construction Law Summit – Dec. 5, 2017

Reliance on Geotechnical Reports § 7.2.9 Unless required by the Design-Build Documents to be provided by the Design-Builder, the Owner shall, upon request from the Design-Builder furnish the services of geotechnical engineers or other consultants for investigation of subsurface, air and water conditions when such services are reasonably necessary to properly carry out the design services furnished by the Design-Builder. In such event, the Design-Builder shall specify the services required. Such services may include, but are not limited to, test borings, test pits, determinations of soil bearing values, percolation tests, evaluations of hazardous materials, ground corrosion and resistivity tests, and necessary operations for anticipating subsoil conditions. The services of geotechnical engineer(s) or other consultants shall include preparation and submission of all appropriate reports and professional recommendations. Consider whether to include allowing, or disallowing, the contractor/design-builder from relying on “accuracy and completeness” of those reports. Alabama Construction Law Summit – Dec. 5, 2017

Site Investigation Clauses § 3.2.1 Execution of the Contract by the Contractor is a representation that the Contractor has visited the site, become generally familiar with local conditions under which the Work is to be performed and correlated personal observations with requirements of the Contract Documents. As a general rule, provisions of this nature only obligate the contractor to make a reasonable visual inspection of conditions on or above the site, and do not obligate the contractor to undertake any special investigation to discover hidden conditions above or below the surface. If intent is to put risk of subsurface conditions on contractor, this clause should be modified to require contractor to perform more than visual inspection. Alabama Construction Law Summit – Dec. 5, 2017

Richard H. Allen Attorney & Shareholder Capell & Howard P.C. (334) 241-8019 Richard.Allen@chlaw.com Richard Allen Alabama Construction Law Summit – Dec. 5, 2017