P09701: Corning Tropel LightGage Metrology System

Slides:



Advertisements
Similar presentations
TI Pharma intranet How to access and use the intranet.
Advertisements

P10511: Miniaturization of Xerography Derek Meinke (ME, PM) Matthew Liff (ME) Tony Zhang (EE) Zaw Htoo (ISE)
Derek Meinke (ME, PM) Matthew Liff (ME) Tony Zhang (EE) Zaw Htoo (ISE)
Week 3: End of Day P Progress Edge Organized page for ease of additional document addition Added New Documents.
Robotic Football Group E1 Jesse Brawer Zach Eberbach Rob Mineo Laura Peveler Susan Sinclair.
Team HazardHawk Team HazardHawk The HazardHawk Team HazardHawk 2008.
P09701—Corning Tropel LightGage™ Metrology System Matthew Bradley May 20,
EDGE™ Final Project Plan P09701 – Corning Tropel LightGage™ Metrology System Matthew Bradley (ME) Images Courtesy of Corning Tropel.
EDGE™ Project Review P Automation/Improvement of Wegmans Cookie Line Packaging Project Team: Stephanie Rager (IE), Bruno Coelho (ME), Mark Voss (ME),
P13621: Conductive Heat Transfer Lab Equipment MSD II: Final Project Review 10 May, 2013 RIT KGCOE.
Engineering H193 - Team Project Gateway Engineering Education Coalition P. 1 Spring Quarter Final Report – An Overview Week 4 Day 2.
P10511: Miniaturization of Xerography Derek Meinke (ME, PM) Matthew Liff (ME) Tony Zhang (EE) Zaw Htoo (ISE)
Chapter 2 Essentials Review PAGE 17. Essential Vocabulary At the top of p. 17 list 10 essential vocabulary or concepts from chapter 2. You may use your.
Meet with groups and guide1 day9/11/2009 Identify team leader1 day9/11/2009 Decide on team norms and behaviors5.5 days9/11/20099/18/2009 Decide group.
Test slide upload.
Joseph Ferrara Team Lead (ME) Joseph ChurchDesign Engineer (ME) Joshua Van Hook LabView Engineer (EE) Jamie Jackson Electronics (EE) Joelle Kirsch Project.
BUS 611 Week 1 Assignment Article Review Article Review. Write a 2-3 page, APA-style article review of the Rosenwinkel article (found in the reading section).
BUS 611 Week 4 Assignment Integrated Project Management To purchase this material link
MKT 450 Complete Class To purchase this material click below link Complete-Class-Guide MKT 450 Week 1 Individual.
MGT 230 Week 3 Learning Team Reflection Collaborate with your Learning Team to discuss the previous week’s objectives. Discuss what you learned, what could.
MGT 230 Week 4 Learning Team Reflection Collaborate with your Learning Team to discuss the previous week’s objectives. Discuss what you learned, what could.
MGT 230 Week 5 Learning Team Reflection Collaborate with your Learning Team to discuss the previous week’s objectives. Discuss what you learned, what could.
UOP WEB 237 Complete Class Check this A+ tutorial guideline at For more classes visit.
WEB 434 Complete Class Check this A+ tutorial guideline at Complete-Class-guide WEB 434 Learning Team Presentation.
DBM 384 Week 5 Learning Team Specialized Database Executive Summary Check this A+ tutorial guideline at 384/DBM-384-Week-5-Learning-Team-
BUS 475 Week 4 Learning Team Communication Plan Outline Develop a generic communications plan and template. This template will be used to develop a communication.
STAYER BUS 599 Week 9 Project Deliverable 5 Executive Summary and Presentation Check this A+ tutorial guideline at
HCS 325 Week 3 Learning Team Presentation Outline Create a Word document outline for what your Learning Team Power Point presentation will look like in.
BIS 220 Week 2 Learning Team Reflection Summary Collaborate with your learning team to discuss the previous week’s objectives. Discuss what you learned,
BIS 220 Week 5 Learning Team Reflection Summary Collaborate with your learning team to discuss the previous week’s objectives. Discuss what you learned,
BPA 302 Complete Class Check this A+ tutorial guideline at BPA 302 Week 1 DQs BPA 302.
BSA 500 Week 6 Learning Team Assignment Riordan Manufacturing Paper and Presentation Resource: Riordan Manufacturing Virtual Organization Finalize and.
BSHS 302 Week 2 Learning Team Write an outline together for the Learning Team assignment due in Week 3 Check this A+ tutorial guideline at
Goal: Feedback Loop Cindy Transition slide - placeholder
Performance Test 3 Week 5 Day 3 Instructor:
EE807: Software-defined Networked Computing
March 23, Days to Demo Day Syllabus
Cold Pressure Fusing II Team Fusion
Emergency Management Technical Committee
PM 598 Competitive Success-- snaptutorial.com
DBM 380 HELP Education Your Life-- dbm380help.com.
PM 571 RANK Education Your Life / pm571rank.com
PM 598 RANK Education Your Life / pm598rank.com
PM 598Competitive Success/tutorialrank.com
PM 598 RANK Lessons in Excellence-- pm598rank.com.
DBM 380 AID Perfect Education/ dbm380aid.com.
DBM 380 HELP Perfect Education/ dbm380help.com.
DBM 380 HELP Lessons in Excellence-- dbm380help.com.
PM 598 Education for Service-- snaptutorial.com
CPMGT 300 STUDY Lessons in Excellence--cpmgt300study.com.
PM 598 Teaching Effectively-- snaptutorial.com
PM 584 Education for Service/tutorialrank.com
PM 584 knowledge is divine-- snaptutorial.com. PM 584 Week 1 Individual Assignment Project Baseline (2 Papers) For more classes visit
PM 598 knowledge is divine-- snaptutorial.com. PM 598 Week 1 Individual Assignment Project Charter For more classes visit PM 598.
PM 598 RANK Education for Service-- pm598rank.com.
Team member1 Team member2 Team member3 Team member4 November 2018
SENIOR DESIGN PROJECT SELECTION TOPICS: Draft Team Formation
After the Exam.
Making Presentations.
Tuition Reimbursement 2016 Employee Briefing – KP MAS
Lesson Action Guide COURSE LOGO Lesson Title This
Team member1 Team member2 Team member3 Team member4 October 2016
Modular Motion Tracking Sensors
IOF Event Overview Tool – status Feb 2018
t ACTIVITY 1 – Teacher Guided: Fine Motor Skills Writing Handbook p. 3
Final Status Update P09006 – Upper Extremity Exerciser
P09701: Corning Tropel LightGage Metrology System
Team P09007 Derek Horton Matthew Sennett Lucas Sienk Matt Sones
Summarizing Use the following slides in order to organize your understanding of the article. After filling in the graphic organizer, then write your summary.
PROJECT MANAGEMENT WORKFLOW
Presentation transcript:

P09701: Corning Tropel LightGage Metrology System Matthew Bradley (PM, ME) Cara Portka (ISE) Benjamin Arkin (EE) Nicholas Schneider (ME)

Outline Purpose: To share MSD progress and experience in order to encourage constructive criticism/feedback and incite new ideas. Objective: Present Week 2 update with deliverables. 4/28/2019

Deliverable Status - Week 3 Final Specifications Complete Selected Concept End of Day Final Project Plan End of Day Action Items Reformat 1-Page Summary Complete Upload Documents to Edge Complete 4/28/2019

Concept 1 Granite Base (Tropel) 3 Stainless Plates 2 “Guide” Slide Rails (COTS) 1 Motorized Linear Slide (COTS) 3 Fine Adjust/Null Motors 2 LightGage Heads (Tropel) 4/28/2019

Concept 1 4/28/2019

Concept 2 Granite Base (Tropel) 4 Stainless Plates 3 Guide Rods 1 Coarse Adjust Motor 3 Fine Adjust/Null Motors 2 LightGage Heads (Tropel) For More Concepts Drawings and Team Design Process Visit: http://groups.google.com/group/msd9701 4/28/2019

Matthew Bradley mjb8482@rit.edu Cara Portka csp1106@rit.edu Benjamin Arkin bja1717@rit.edu Nicholas Schneider nms0286@rit.edu 4/28/2019