What are these kinks on dipole ramp and the associated beam loss?

Slides:



Advertisements
Similar presentations
12 PERIOD HYBRID WARM-COLD SYNCHROTRON FOR THE MUON COLLIDER Al Garren November 10, 2011.
Advertisements

Tevatron Beam Diagnostics: Boosting Collider Performance Vladimir Shiltsev, Ron Moore, Andreas Jansson FNAL/Accelerator Division.
Proton Beam Measurements in the Recycler Duncan Scott On Behalf of the Main Injector Group.
SESAME – TAC 2012: M. Attal Maher Attal SESAME Booster Characterization.
PLANS JINR PARTICIPATION for JINR PARTICIPATION FAIR PROJECT: in the FAIR PROJECT: - ACCELERATOR TECHNOLOGY A.Kovalenko 103 session of the JINR Scientific.
G. Velev 1/24/ Ferrite Tests for Mu2e Beam- Line Extinction Uses G. Velev Technical Division Magnet Systems Department.
MST: Red Rule, Blue Rule. 2 MST Instance
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
RHIC Status Haixin Huang Time Meeting 01/18/2011.
May 17, 2005Wednesday Experiment Meeting BNL, Upton Acceleration beyond 100 GeV  Goal To evaluate the spin dynamics beyond 100 GeV  What’s the impact.
J-PARC Accelerators Masahito Tomizawa KEK Acc. Lab. Outline, Status, Schedule of J-PARC accelerator MR Beam Power Upgrade.
ION COMMISSIONING REVISITED 1 Thanks to: John Jowett, Walter Venturini. Matteo Solfaroli.
RHIC Status: Startup Run 12 V. Schoefer RHIC Spin Collaboration Meeting 1/13/12.
Part III Commissioning. Proof of Principle FFAG (POP) study The world first proton FFAG –Commissioned in March –From 50 keV to 500 keV in 1ms. –Proof.
J-PARC Spin Physics Workshop1 Polarized Proton Acceleration in J-PARC M. Bai Brookhaven National Laboratory.
Cold test of SIS-300 dipole model Sergey Kozub Institute for High Energy Physics (IHEP), Protvino, Moscow region, Russia.
HYBRID WARM-COLD SYNCHROTRON FOR THE MUON COLLIDER Al Garren July 28, 2011.
Second Harmonic capture in the IPNS RCS: Transition from SH to fundamental rf operation during the acceleration cycle using CAPTURE_SPC Jeff Dooling Presented.
Dave Johnson July 12, 2010 NOvA/ANU Recycler Upgrades Review Optics, Apertures, and Operations Nova-doc 4930.
Orbit related issues of the spin tune control at RHIC V.Ptitsyn, M.Bai, W.MacKay, T.Roser.
1 Fast kicker study Machine Time 2011/10/18~10/29(2 weeks) TB meeting 2011/01/14 T.Naito.
The Introduction to CSNS Accelerators Oct. 5, 2010 Sheng Wang AP group, Accelerator Centre,IHEP, CAS.
Principals of fast injection and extraction R. Apsimon.
Hybrid Synchrotron Arc: 2 Dipoles per Half Cell J. Scott Berg Advanced Accelerator Group Meeting 28 July 2011.
“ Decay & snapback in main LHC dipoles vs injection current”, LUMI-05, Arcidosso, 1 September 2005, Page 1/4 During ramps, boundary-induced.
Run 10 Start-up Status
Thomas Roser SPIN 2006 October 3, 2006 A Study of Polarized Proton Acceleration in J-PARC A.U.Luccio, M.Bai, T.Roser Brookhaven National Laboratory, Upton,
Status of RHIC Polarization Studies. Summary of Polarization Studies during Run09 Tune scans: – Nearby 0.7 – Near integer tune Polarization ramp measurement.
ApEx needs for CeC PoP Experiment December 11, 2015.
Plan for 500 GeV Development Vadim, Mei. Goals 1.Explore polarization transmission to the 500 Gev CM energy. 2. Inspect the luminosity aspects (with 2.
The reading is 7.38 mm. The reading is 7.72 mm.
Wakefield of cavity BPM In ATF2 ATF2 Project Meeting K.Kubo.
RHIC Status Haixin Huang Time Meeting 01/25/2011.
Polarized Proton Acceleration in the AGS with Two Helical Partial Snakes October 2, 2006 SPIN 2006 H. Huang, L.A. Ahrens, M. Bai, A. Bravar, K. Brown,
Aperture measurements during LHC commissioning 2017
Beam test of slow extraction from the ESR
Friday Access in shadow of SPS interventions (RF, extraction septa power supply) Lead into problem on the cooling of the extraction septa in SPS Both beams.
ELENA Overview and Layout Start of ELENA Commissioning Next Steps
Monday :00 Stable beams 9_6_6_6 13:40 Access.
Discussion on Emittance Evolution through FCC-e+e-
02/08/ :35: Lost access chain in point 2 (PX24 PAD)  Dump after ~14.5 hours ~100 nb-1.
Beam Injection and Extraction Scheme
LHC Morning Meeting - G. Arduini
CEPC Booster Design Dou Wang, Chenghui Yu, Tianjian Bian, Xiaohao Cui, Chuang Zhang, Yudong Liu, Na Wang, Daheng Ji, Jiyuan Zhai, Wen Kang, Cai Meng, Jie.
Tuesday TOTEM and transverse loss map (1) OK
CNGS Primary Beam Results 2010
Bubble Chamber – Beam Requirements
LHC Status Sun Morning 20-Mai
Cui Xiaohao, Bian Tianjian, Zhang Chuang 2017/11/07
LHC Momentum in 2008 J. Wenninger December 2008.
Friday 11/5 08:00 RF communication problem solved. Ready to inject but beam not available from the injectors. Injection line collimators opened from 4.5.
Thursday :00: Physics fill from the night shift
Energy Calibration of the SPS with Proton and Lead Ion Beams
EDLC(Embedded system Development Life Cycle ).
Monday – Morning Fill 3265 stable beams since 1:31
Wednesday Ramp single nominal bunches for loss maps
APE Update Nate Lipkowitz 9/13/2011.
Thursday 04/11 - Morning Access until ~13:00 Pre-cycle Proton checks:
Monday 8th December Morning used for RF work (IP z, injection), damper noise checks. Stable beams period with LHCb spectrometer OFF – lost beam after.
I-LHC NOMINAL ions beam in 2007
CEPC Booster 误差效应及轨道校正的初步研究
CNGS Primary Beam Results 2011
PSB magnetic cycle 900 ms MeV to 2 GeV
Beam dynamics requirements on MQT
Wednesday 6th April Injection of 50 ns up to 108 bunches (3 x 36).
Saturday 06/11 Triplet R8 tripped during ramp for collision setup.
Monday 27th August & night
Saturday Luminosity production 1380 bunches
Feasibility of Recuperation of Magnets in Decommissioned Storage Rings
Status of RCS eRHIC Injector Design
Presentation transcript:

What are these kinks on dipole ramp and the associated beam loss? Cycle to cycle hysteresis and Timing issues?  as seen from BPMs R.Singh and S.H Mirza What are these kinks on dipole ramp and the associated beam loss? Red: Dipole ramp higher injection Timing? Blue: DCCT 12.07.2018, Night shift  Orbit was moving by 2 mm at injection every 7-8 cycles 4/28/2019

The orbit changes significantly cycle to cycle in this case. Hypothesis: A longer delay between dipoles ramps causes different magnetic field seen by the beam The orbit changes significantly cycle to cycle in this case. 40 4/28/2019

Position distortion till extraction, effect on slow extraction? 40 4/28/2019