Polygons & Stands: Staying in Sync GIS and Forest Management: A Practitioners Forum October 29-30, 2003 Wilsonville, Oregon James D. Arney, Ph.D. Forest.

Slides:



Advertisements
Similar presentations
Someone hands you a a diskette that has data about schools in the City of Cleveland. They tell you that the school file is in a a dBase format. How do.
Advertisements

Introduction to GIS II. The software We will use ESRIs ArcGIS desktop - ArcView. ArcView, ArcEditor, and ArcInfo In each of the three you find: –ArcMap:
Cultural heritage asset management plans (CHAMP) Project Project data sources, transformation and submission Jay Carver- Task Manager.
Concepts of Maintaining Your Data Simple Ways to Edit Your Data By Lorne Woods.
Geographic Information Systems Applications in Natural Resource Management Chapter 6 Obtaining Information about a Specific Geographic Region Michael G.
“Working Forest” Silviculture 2012 Reforestation Council October 11, 2012 James D. Arney, Ph.D. Forest Biometrics Research Institute
GIS UPDATE? ARE YOU TAKING NOTES? How will you remember what you did if you do not take notes. Lab 9 this week: Music Festival 3: Vector Analysis.
The Landscape Project Skylands Pinelands Piedmont Plains Delaware Bay Coastal.
Geographic Information Systems Applications in Natural Resource Management Chapter 8 Combining and Splitting Landscape Features, and Merging GIS Databases.
From portions of Chapter 8, 9, 10, &11. Real world is complex. GIS is used model reality. The GIS models then enable us to ask questions of the data by.
Forest Surveys and GIS Applications on the Nez Perce Reservation GIS on Fire! Worley - Plummer, Idaho May 11, 2005 Rich Botto, Nez Perce Tribe
Learning the concepts of GIS through Powerpoint and Excel GIS is a powerful tool that demands consistency and an understanding of spatial scales, as well.
Vector-Based GIS Data Processing Chapter 6. Vector Data Model Feature Classes points lines polygons Layers limited to one class of data Figure p. 186.
Naikoa Aguilar-Amuchastegui  Forest Carbon Scientist  REDD+  Forest and Climate Initiative olutions/mitigation/Pages/climate_REDD.a.
Introduction to Cartography GEOG 2016 E
West Hills College Farm of the Future. West Hills College Farm of the Future Where are you NOW?! Precision Agriculture – Lesson 3.
Technology Overview Geographic Information Systems.
Spatial Data FE Lecture 1b OSB 111 The Door your student card opens it don’t open for others don’t leave it open 20 seconds Machines at least two.
Lecture by Austin Troy © 2005 Lecture 13: Introduction to Raster Spatial Analysis Using GIS-- Introduction to GIS Lecture Notes by Austin Troy, University.
What is Where? Lecture 5 Introduction to GISs Geography 176A Department of Geography, UCSB Summer 06, Session B.
CS 128/ES Lecture 5a1 Raster Formats (II). CS 128/ES Lecture 5a2 Spatial modeling in raster format  Basic entity is the cell  Region represented.
The Rural Technology Initiative –“Better technology in rural areas for managing forests for increased product and environmental values in support of local.
January 30, 2006Site Selection - IAP 2006 Site Selection – Making Spatial Decisions Using GIS IAP 20061/30/06.
Geographic Information Systems : Data Types, Sources and the ArcView Program.
GIS A geographic information system. A GIS is most often associated with a map. A GIS is most often associated with a map. The map is a display of a data.
1 Spatial Databases as Models of Reality Geog 495: GIS database design Reading: NCGIA CC ’90 Unit #10.
What is Where? u Getting Started With Geographic Information Systems u Chapter 5.
©2005 Austin Troy Lecture 9: Introduction to GIS 1.Vector Geoprocessing Lecture by Austin Troy, University of Vermont.
Wallingford Software What’s New in InfoWorks CS v9.0 Andrew Walker Wallingford Software.
XP New Perspectives on Microsoft Office Access 2003, Second Edition- Tutorial 1 1 Microsoft Access 2003 Tutorial 1 – Introduction To Microsoft Access 2003.
Attribute databases. GIS Definition Diagram Output Query Results.
Intro. To GIS Lecture 6 Spatial Analysis April 8th, 2013
Geographic Information Systems Applications in Natural Resource Management Chapter 7 Buffering Landscape Features Michael G. Wing & Pete Bettinger.
@ 2007 Austin Troy. Geoprocessing Introduction to GIS Geoprocessing is the processing of geographic information. Perform spatial analysis and modeling.
Editing Basics (in ArcGIS 9.2) By Alma Vargas. Levels of Desktop ArcGIS Arc View Version that most clients will use The version that this session will.
Slope and Aspect Calculated from a grid of elevations (a digital elevation model) Slope and aspect are calculated at each point in the grid, by comparing.
Basic Spatial Analysis
Esri UC 2014 | Technical Workshop | Data Alignment and Management in ArcMap Lisa Stanners, Sean Jones.
Getting Started With Toolkit Simple Steps to Follow.
NR 422: Topology Jim Graham Fall 2010 See: odatabase-topology.pdf.
Bringing stand level fire risk to the landscape level: Fire risk assessment using FFE-FVS with the Landscape Management System. Kevin Ceder And James McCarter.
Applied Cartography and Introduction to GIS GEOG 2017 EL
DAY 15: ACCESS CHAPTER 2 Larry Reaves October 7,
GIS2: Geo-processing and Metadata Treg Christopher.
Chapter 3 Sections 3.5 – 3.7. Vector Data Representation object-based “discrete objects”
Project Data and Information Management: Moldova Soil Conservation Project BioCarbon Fund Workshop February 5 - 8, 2008 Harnessing the carbon market to.
Comparing Stand Age 140 Basal Area per Acre Outputs from the DFC, FVS and ORGANON Models Steve McConnell Forest Integrity Spokane, WA Growth Model Users.
An Introduction to The Network for a Healthy California GIS Viewer Welcome to Webinar Anthony Barnes Bhavdeep Sachdev 9:00am to 10:30am.
Major parts of ArcGIS ArcView -Basic mapping, editing and Analysis tools ArcEditor -all of ArcView plus Adds ability to deal with topological and network.
Introduction to Raster Spatial Analysis Using GIS-- Introduction to GIS Raster Query Map Calculation Zonal statistics Terrain functions Viewshed.
Photo Link Manager – Part One ► Open the Photo Link Manager form ► Understand Form Layout ► View Photos.
Copyright © 2006 by Maribeth H. Price 8-1 Chapter 8 Geoprocessing.
CFR 250/590 Introduction to GIS, Autumn 1999 Creating and Modifying Tables © Phil Hurvitz, intro.ppt 1 Overview Using ArcView tables Querying.
Vegetation Mapping An Interagency Approach The California Department of Forestry and Fire Protection and the USDA Forest Service Mark Rosenberg: Research.
Geographic Information Systems in Water Science Unit 4: Module 16, Lecture 3 – Fundamental GIS data types.
Fundamentals of GIS Lecture Materials by Austin Troy except where noted © 2008 Lecture 13: Introduction to Raster Spatial Analysis Using GIS-- By.
IMPROVING GIS SPATIAL ACCURACY WITH THE GEOGRAPHIC COORDINATE DATABASE Adjusting GIS Data to the GCDB 1.
CFR 250/590 Introduction to GIS, Autumn 1999 View Basics © Phil Hurvitz, intro.ppt 1 Overview Getting data into ArcView Displaying themes Theme.
Map overlays & Geoprocessing Learn about spatial analysis functions overlays, clipping & buffering Use overlays to analyze multiple spatial criteria Understand.
Integrated Land and Resource Registry Integrated Land Management Bureau.
PowerBuilder Online Courses - by Prasad Bodepudi Database Painter Primary & Foreign Keys Extended Attributes PowerBuilder System Tables Database Profiles.
Juanita Cano City of Sacramento Spring 2014 Geography 375.
Roads without trails Streams Mameyes Watershed Boundary Intersect Buffer 50 meters Buffer 100 meters Intersect represents all of the areas along stream.
1 Where have we come so far? By now, you should be familiar with: –What GIS is –How GIS works –Some of what GIS can do –GIS data formats Spatial data Tabular.
WFM 6202: Remote Sensing and GIS in Water Management © Dr. Akm Saiful IslamDr. Akm Saiful Islam WFM 6202: Remote Sensing and GIS in Water Management Dr.
Soil type Vegetation type / Forest density Land Use Fire activity Slopes Support NWS Flash Flood Warning Program: Development of Flash Flood Potential.
Using the NHDPlus for drainage area delineation and site matching Kirsten Cassingham, NC Water Science Center Silvia Terziotti, NC Water Science Center.
1 Byung Sik, Kim Kangwon National University Advanced Hydrology and Water Resources Management.
WELLS AND TIME SERIES DATA. Framework Temporal Aquifers & Wells.
URBDP 422 Urban and Regional Geo-Spatial Analysis
Presentation transcript:

Polygons & Stands: Staying in Sync GIS and Forest Management: A Practitioners Forum October 29-30, 2003 Wilsonville, Oregon James D. Arney, Ph.D. Forest Biometrics

Basic Gis Functionality Units are standard between Fps and Gis Complete Read/Write linkages both ways Fps – Microsoft Access (97, 2000, Xp) Gis linkable file structures –ArcView only dBase attribute tables –Arc 8.x - may use Microsoft Access –MapInfo 6.+- may use Microsoft Access

FPS Automated Cruise Selection Use FPS Menu –Set Sample size –Run Selection –Pass to GIS Map Go To Field

Cruise Selection

Harvest Scheduling w/Green-Up

Harvest Schedule w/o constraints

Harvest Schedule with green-up constraints

Common Parameters Fps Admin table –Gis_ID –Flag –PlanYear –Xgis & Ygis –Physical Site Index –Basin –Elevation –Aspect –Slope Gis VegPoly table –Gis_ID –Flag –Theme –Xgis & Ygis –Site Index –Basin –Elevation –Aspect –Slope

Fps Database vs Gis Database Stand boundary was shifted, what next? New harvest polygon doesnt match previous polygon boundaries? New roads have been added? Stream buffer regulations have changed? Stand boundaries split at section lines? Should Riparian buffers be polygons?

Adjusting for Road Areas

Adjusting for Stream Buffers

Lumping & Splitting Polygons

Managing Road Reductions Roads layer –Road ID –Road Label –Road Class –Class Width Roads Buffer –Vegetation ID –Area (acres/hectares)

Managing Stream Buffers Hydro Layer –Hydro ID –Hydro Label –Hydro Class –Class Width Hydro Buffer –Vegetation ID –Area (acres/hectares) –Roads included Hydro Row –Vegetation ID –Area (acres/hectares) –Road area removed

Managing Vegetation Polygons FPS Access Database Admin table –Std_ID –Gis_ID –Area_Gis (Gross) –Area_Net (-Roads) –Area_Rpt(-Rds & Hyd) GIS Access Database VegPoly table –Gis_ID –Std_ID –Acres (hectares) –Roads –Buffer (hydro)

Update Fps from Gis VegPoly (2002) – last years veg layer –Gis_ID = Old_ID VegPoly (2003) – this years veg layer –Gis_ID = New_ID VegStep (2003/2002) overlay split –Old_ID (2002) –New_ID (2003) –Area (acres/hectares) of each sliver polygon

Fps Process for Gis Update Copy CoastFps 2002 to CoastFps 2003 Open CoastFps 2003 Link CoastGis VegStep table to CoastFps Execute Run Gis Updates to Fps Menu CoastFps 2003 database now in sync w/Gis –Update Roads from RoadBuf (2003) –Update Hydro from HydroRow (2003)

Order of Flow for Updates Always start in Gis database with updates Maintain unique and consistent Gis_IDs –Std_ID may be different, but also unique Create duplicate of current Gis layer Make all edits in duplicate layer Overlay original with duplicate layers Pass resultant overlay to Fps database Process overlay updates into Fps database

Standard Update Methods New Roads? – Update Net Forested Area Modified Hydro Buffers? –Update Road & Stream Buffers in VegPoly Adjusted acres in existing polygons? –Re-Run Roads & Stream Buffers Harvest Units? –Run Lump/Split on old/new vegetation layers –Update Road & Stream Buffers in VegPoly

Spatial Pattern within an Existing DF, WH Clumpy Mature Stand

Apply 1-acre group selection thinning

Control brush & animals to facilitate natural regeneration

Apply overstory removal

Forest Projection & Planning System (FPS) Version 6.4