Decommissioning in Aker Solutions Experience and challenges

Slides:



Advertisements
Similar presentations
Remedy Statistics April 2009 May 28th 2009 Paris Desktop Support Analysis only done with Remedy tickets (Incident-Task-Request) (GRS requests are not included.
Advertisements

© 2013 Sri U-Thong Limited. All rights reserved. This presentation has been prepared by Sri U-Thong Limited and its holding company (collectively, “Sri.
The following slides are approved for external use but may not be altered in any way. For additional information, contact Tom Agoston at Tom Agoston/Somers/IBM.
Regulations in the North Sea Keith Mayo, Head of Offshore Decommissioning, DECC, UK Date 1/2 October 2009.
Steve Slater “DDP” – Requirements 13 th Feb 2014.
Aker Exploration: Rig for oil Status and Outlook Bård Johansen, President & CEO.
Saxo Bank OUTLOOK 2011 Saxo Bank’s HQ in Copenhagen June 24, 2015.
Overview of Oil & Gas Sector The following slides are not a tutorial but merely an overview of the various phases involved in an oil & gas development.
© Copyright Alvarion Ltd. Proprietary Information: NG-VG: Alvarion’s Networking and Voice Gateway May 2010.
FX market program for ranking market makers in EURUSD_TOM May 2014, Moscow Viktoriya Gulavskaya Head of trading technologies and market making.
An Equity Perspective Paul Malan Global Markets 21 January 2004.
Magnox Swarf Storage Silos Programme Decommissioning Delivery Partnership Requirements February 2014 Gavin Askew.
Permission to reprint or distribute any content from this presentation requires the prior written approval of Standard & Poor’s. Copyright © 2010 Standard.
©AgustaWestland Ltd The contents of this document are the property of AgustaWestland Ltd and/or its subcontractors, and must not be copied, used by, or.
1 New standard in North Sea drilling operations..
Held in partnership with Creating Connections. Held in partnership with Creating Connections This document has been prepared for general guidance on matters.
Title Slide – Option 1. Title Slide – Option 2 Insert Text.
Economic & Market Recap May Equity and Fixed Income Markets.
Legal notice Certain statements included in this presentation contain forward-looking information concerning BG Group plc’s strategy, operations, financial.
Place Client Logo Here Oil Market Outlook Paul Horsnell Head of Commodities Research, Barclays Capital Intertanko Singapore Tanker Event 30 March 2006.
S T R I C T L Y P R I V A T E A N D C O N F I D E N T I A L 1 [ PRESENTED AT THE ASIAN BANKER SUMMIT 2011 ] April 7, 2011 LIQUIDITY MANAGEMENT POST 2008.
Oracle Fusion Applications 11gR1 ( ) Functional Overview (L2) Manage Inbound Logistics (L3) Manage and Disposition Inventory Returns.
2009 Coal Seam Gas Safety Forum Paul Zealand, Executive General Manager Upstream Oil & Gas Friday 14 August 2009.
© 2014 Gartner, Inc. and/or its affiliates. All rights reserved. Gartner is a registered trademark of Gartner, Inc. or its affiliates. This publication.
1 1 Presenter / date if required Independent, integrated thinking.
YOUR RELIABLE PARTNER BINTANG SUBSEA.
1 Experience of a Russian bank in collaboration with Chinese partners Evgeny Kravchenko Head of Export Finance 29 th January 2015.
Q Regional Scenario Analysis PwCAutomotiveInstitute RegionX Scenarios 2008 – 2015 (Millions) In our volatile marketplace, blind reliance upon a single-point.
October 2012 Admission of professional participants – non-credit institutions to trading on the Moscow Exchange FX market.
What’s the future of decommissioning globally?
Copyright © 2012, Oracle and/or its affiliates. All rights reserved. Oracle Proprietary and Confidential. 1.
1 The Power of Dividend Growth DISCLOSURE This information has been provided by RBC Global Asset Management Inc. (RBC GAM) and is for informational.
Part of Aker © 2008 Aker Solutions Trailer Loading/Unloading Procedures.
Use this title slide only with an image Session 1: What Is IP Dr. Jim S. Zeng May 8, 2014.
Casualty Actuarial Society – Chicago, IL November 2007
BP Global Environmental Products
Decommissioning Opportunity for City of Dundee
Connectivity to bank and sample account structure
RaboDirect Financial Health Barometer 2016
Achieving innovation to meet new market challenges: Global Commodity Financing GTR MENA Oscar Wehtje, Head of Product Development February 2017.
Developing the Overall Audit Plan and Audit Program
Integrated DECOM A specialist team to deliver Decommissioning Programmes.
<Insert Picture Here>
Training Course on Integrated Management System for Regulatory Body
LNG: Reliable Gas Supply for the Northeast U.S.
Rising Momentum Trumps Policy Uncertainty
Valuation Creation Through Strategy
BU IS GIG Chemical, Oil & Gas
R&D; Goodwill; Intangible Assets and Brands
Presentation Title Sector First Last, Senior Analyst
Disclaimer The information in this presentation is confidential and proprietary to SAP and may not be disclosed without the permission of SAP. Except for.
, R&D expenditure showed 6% growth annually
Tom McGovern and Chris Hicks Newcastle University Business School
DISCLAIMER and COPYRIGHT RESERVATION
Kurt Adams EVP&CDO Restructuring Roundtable
R&D; Goodwill; Intangible Assets and Brands
Environmental Upgrade Finance
The Economics of Proper Measurement
MER and Decommissioning
TITLE PRESENTATIONDATE AUTHOR JOBTITLE.
ACCELERATE THE GROWTH OF YOUR BUSINESS
High Level Operations Transition Timeline
R&D; Goodwill; Intangible Assets and Brands
26 April 2019 Aksha Engineering & Consultancy.
R&D; Goodwill; Intangible Assets and Brands
TITLE Source: Footnotes:. TITLE Source: Footnotes:
© 2013 Sri U-Thong Limited. All rights reserved
2265 A Street, Santa Maria, CA Al Segal Senior Vice President
Blueberry.
Emotional Intelligence: The Core of Family Offices
Presentation transcript:

Decommissioning in Aker Solutions Experience and challenges INSTOK & SDI Technology Partnership Event, Aberdeen - 26.11.2015 Torleif Gram, Senior Vice President, Aker Solutions MMO

Content Industry context Our history Our business 25 April, 2019

Overall market in North Sea 42 platforms removed since 1996 Assuming 90% of the installations to be removed coming 30 years 25 April, 2019

Split between UK / Norway 25 April, 2019

Cessation cost distribution - UK Resource breakdown structure average UKCS expenditure (2014-2022) Kilde: Oil & Gas UK 25 April, 2019

Typical timeline for a cessation project -5 -4 -3 -2 -1 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 Management anticipation CoP (5-10 years in advance) Basic engineering Basic Engineering (removal) Establish strategies and goals Retrieve & organise platform data Carry out inspections Studies/Method Statements Risk Assessments Input to decisions and plans Cessation plan / decommissioning programme to Authorities Sourcing Cessation of production P&A (incl. conductors) Facility / pipeline making safe and topsides preparation Removal Recycling CoP 25 April 2019

Traditional Model - Tier 1 Contractors in UK O&M contract Disposal Decommissioning service contract De-energise platform Clean and remove oils and fuels Install temporary systems Prepare platform for NUI mode Technical Authority Removal contract E&C contract P&A contract Subsea contract Time 25 April, 2019

DSC part of O&M O&M contract Disposal Removal contract E&C contract Decommissioning service contract De-energise platform Clean and remove oils and fuels Install temporary systems Prepare platform for NUI mode Technical Authority Removal contract E&C contract P&A contract Subsea contract Time 25 April, 2019

DSC part of E&C contract O&M contract Disposal Decommissioning service contract De-energise platform Clean and remove oils and fuels Install temporary systems Prepare platform for NUI mode Technical Authority Removal contract E&C contract P&A contract Subsea contract Time 25 April, 2019

Content Industry context Our history Our business 25 April, 2019

Decommissioning – Our reference list Esso Odin EPRD Phillips Maureen A EPRD TOTAL Frigg & MCP01 EPRD 1995-1997 1998-2002 2004-2009 BP Old Valhall DSC TENAS Yme DSC CNRI Murchison DSC ExxonMobil Jotun B DSC Continuous business for 20 years Partnership with Saipem for 15 years to 2011 2010-2015 2012-2015 2013-2016 2015-2016 25 April, 2019

Maureen A Substructure prior to installation 25 April, 2019

The BTA method is proven through Frigg DP2 jacket removal 12.000 tonnes Decommissioning in Aker – Our perspective

Positive experiences Continuous HSE focus works – last eight years without LTI (three million man-hours) Well-defined platforms were a success All major marine and heavy lift campaigns on all projects successfully performed offshore and onshore Maureen A: High focus (technical and commercial) on re-floating the platform from seabed – worked as planned Innovative solutions - BTA and FlexSeaFast® solved challenges We are prepared for the known risks – How to be sufficiently prepared for the unknown risks? 25 April, 2019

Unknown risks in our decommissioning projects Odin (1995 - 1997) Cutting of piles Maureen (1998 – 2002) Lack of HSE culture by tug supplier (2 fatalities) Cleaning of wax in tanks prior to reuse MCP01 & CDP1 (2004 – 2009) Platform deterioration caused by low maintenance for more than ten years More hazardous materials than declared Was not hydrocarbon free (planned with cold work) QP Asbestos in ceiling preventing use to use as planned General Frigg Consequence costs for more complex preparation work offshore (flotel, revised lifting schedule and more man-hours) Busy market (high oil price) Preparation for removal (lifting) is the challenge 25 April, 2019

Contract models EPRD E+P+R+D Suitable for Suitable for Small/medium sized module based topsides Cost Removal > Cost Eng/Prep Reverse installation or single lift Typical HL Contractor E+P+R+D Suitable for Large complex integrated topsides Cost Removal < Cost Preparations Various removal methods 25 April, 2019

Content Industry context Our history Our business 25 April, 2019

Decommissioning of North Sea Our decom mission is to create value to our Clients by solving their decom obligations in the North Sea. 25 April, 2019

Service offering today – balanced risk Products Description 1) Cessation obligations assessment High level study to reveal regulations and estimate decom costs Typical utilisations: Corporate balance sheets, valuation of assets at sales or acquisitions 2) Decom engineering services Consulting services Engineering studies, all levels as appreciation, concept, FEED and detail 3) Decom service contracts (DSC) Engineering down inclusive cleaning, hydrocarbon free and energy free Material management Modifications and preparations for removal 4) New: project execution assistance Services to Company or removal contractor Project execution systems Project execution management and engineering services 5) New: removal service contracts Services to a removal contractor Preparations for removal 25 April, 2019

DSC as part of decommissioning process Production CoP Eng down Prepare for removal NUI Removal DRILLING Drilling Well operations P&A Cleaning Conductors FACILITY OPERATIONS Logistics Safety Catering Logistics Safety (cases) Catering PRODUCTION Maintain & upgrade systems Maximise throughput Engineering down Modifications Shutdown REMOVAL Temporary systems Preparations Removal Decommissioning service contract 25 April 2019

Copyright and disclaimer Copyright Copyright of all published material including photographs, drawings and images in this document remains vested in Aker Solutions and third party contributors as appropriate. Accordingly, neither the whole nor any part of this document shall be reproduced in any form nor used in any manner without express prior permission and applicable acknowledgements. No trademark, copyright or other notice shall be altered or removed from any reproduction. Disclaimer This Presentation includes and is based, inter alia, on forward-looking information and statements that are subject to risks and uncertainties that could cause actual results to differ. These statements and this Presentation are based on current expectations, estimates and projections about global economic conditions, the economic conditions of the regions and industries that are major markets for Aker Solutions ASA and Aker Solutions ASA’s (including subsidiaries and affiliates) lines of business. These expectations, estimates and projections are generally identifiable by statements containing words such as “expects”, “believes”, “estimates” or similar expressions. Important factors that could cause actual results to differ materially from those expectations include, among others, economic and market conditions in the geographic areas and industries that are or will be major markets for Aker Solutions’ businesses, oil prices, market acceptance of new products and services, changes in governmental regulations, interest rates, fluctuations in currency exchange rates and such other factors as may be discussed from time to time in the Presentation. Although Aker Solutions ASA believes that its expectations and the Presentation are based upon reasonable assumptions, it can give no assurance that those expectations will be achieved or that the actual results will be as set out in the Presentation. Aker Solutions ASA is making no representation or warranty, expressed or implied, as to the accuracy, reliability or completeness of the Presentation, and neither Aker Solutions ASA nor any of its directors, officers or employees will have any liability to you or any other persons resulting from your use. Aker Solutions consists of many legally independent entities, constituting their own separate identities. Aker Solutions is used as the common brand or trade mark for most of these entities. In this presentation we may sometimes use “Aker Solutions”, “we” or “us” when we refer to Aker Solutions companies in general or where no useful purpose is served by identifying any particular Aker Solutions company. 25 April, 2019