C5.21L Three Phase Dead End Insulator Changeout

Slides:



Advertisements
Similar presentations
Hazards Of Electricity
Advertisements

MABAS Division 10 - Com Ed Program1 Electrical Safety Reference: The Power of Training Electrical Safety Commonwealth Edison Company.
Qualified Persons Working On Or Near Energized Equipment
Material Handling. Introduction Handling and storing materials include a wide variety of tasks like: Hoisting tons of steel with a crane Driving a truck.
Electrical Safety Safety Training Series
Safety and PV Module 16 Fall Working Safely with PV Common Sense aspects: –Cluttered workspace leads to tripping –Working on sloped roofs, secure.
Module 3 Worksite Inspection Checklist Days to a Safe and Healthy Workplace - Days
Elkhorn Construction Inc..  A BJSA is a tool in which we plan our work, identify hazards, mitigate the hazards, and assign the responsible people. 
Electrical Safety, Subpart K
Personal Protective Equipment
A4 Insulator Changeout.
Cutting an In-Line Dead-end Single Phase
Voltage Regulator Bypass
Wye/Wye 120/208 4 wire Transformer Bank
Wye/Delta 240/480 4 wire Transformer Bank
Voltage Regulator Bypass
Protective Grounding Three Phase Tangent
A 3 Insulator Changeout with Jib
Project Committee - JSA’s
Wye/Delta 120/240 4 wire Transformer Bank
C 4 Insulator Changeout With Hoists
Protective Grounding Single Phase Tangent
Emergency Action Plans
Wye/Delta 120/240 4 wire Transformer Bank
Wye/Wye 120/208 4 wire Transformer Bank
A4 Insulator Changeout © 2018 Iowa Association of Electric Cooperatives.
Cutting in Bells Single Phase
Cutting in Bells Three Phase
C3 Insulator Changeout With Jib
A 3 Insulator Changeout With Hoists
Wye/Delta 120/240 Open 4 wire Transformer Bank
Relocating a Three Phase Transformer Bank
A1 Pole Changeout Energized
URD Radial Feed Transformer Changeout
Adding an A5 tap to an A1 © 2018 Iowa Association of Electric Cooperatives DISCLAIMER: This job hazard analysis (JHA) has been made available for informational.
Voltage Regulator Bypass
A 3 Insulator Changeout with Jib
C3 Insulator Changeout With Jib
C3 Insulator Changeout With Hoists
Wye/Wye 277/480 4 wire Transformer Bank
Line Down Single phase © 2018 Iowa Association of Electric Cooperatives.
Wye/Wye 120/208 4 wire Transformer Bank
Cutting an In-Line Dead-end Single Phase
A1 to A6 Conversion Tangent to Double Dead End
A5 Insulator Change Transformer Pole
A2 Pole Changeout Energized
A1 Pole Changeout Energized
A 3 Insulator Changeout with Jib
Wye/Wye 277/480 4 wire Transformer Bank
Open Wye-Wye 120/208 4 wire.
Installing a single phase tap on an existing C1.11
C1 Insulator Changeout © 2018 Iowa Association of Electric Cooperatives DISCLAIMER: This job hazard analysis (JHA) has been made available for informational.
A1 Insulator Changeout Energized
A4 Insulator Changeout © 2018 Iowa Association of Electric Cooperatives DISCLAIMER: This job hazard analysis (JHA) has been made available for informational.
Cutting an In-Line Dead-end Single Phase
Protective Grounding Single Phase Tangent
A5 Insulator Change Transformer Pole
C5.21L Three Phase Dead End Insulator Changeout
Wye/Delta 120/240 4 wire Transformer Bank
Pad mounted 120/240 open 4 wire service
Adding an A5 tap to an A1 © 2018 Iowa Association of Electric Cooperatives.
Voltage Regulator Bypass
Wye/Delta 120/240 4 wire Transformer Bank
A2 Insulator Changeout Energized
C1 Insulator Changeout © 2018 Iowa Association of Electric Cooperatives.
Single Phase Pole Mounted
Wye/Delta 120/240 4 wire Transformer Bank
A1 Insulator Changeout Energized
Relocating a Three Phase Transformer Bank
Wye/Wye 277/480 4 wire Transformer Bank
Presentation transcript:

C5.21L Three Phase Dead End Insulator Changeout © 2018 Iowa Association of Electric Cooperatives

Why are we doing this energized? Take some time to decide if it is necessary to do this job energized. Could the job be done de-energized and grounded? What would be the impact? Would it be safer?

OSHA Required Tailgate Discussion Topics Hazards Associate with the job Work Procedures Involved Special Precautions Energy Source Controls PPE Required The five topics required by OSHA to discuss in the tailgate. First letter from each topic = How Well Should Everyone Plan

Work Procedures Involved Hazards associated with the job Special Precautions Energy Source Controls Personal Protective Equipment Be sure to record your emergency location and post in a location everyone on the crew knows. Have your PPE and First Aid kit available Be sure your AED is accessible. A safe job begins with a thorough inspection of… Tools Be certain all of your tools are in good shape. Equipment Make sure your trucks are all in working order take time to preflight your equipment and insure there are no surprise. Line/Structure Look over the line and structure. Are there any potential hazards? (Broken insulators, damaged wire, clearances over roads or from trees?) Be aware of your work area, be sure to cover anything you can reach touch or fall into. And anything that can reach touch or fall into you! Discuss all PPE needed for the job and wear your PPE. Be sure to inspect your equipment prior to use. Identify all voltages you are exposed to. Be sure to have all of your Arc-Flash protective gear on. Identify a dedicated observer Working in traffic exposes you to hazards that are difficult to control. Give the vehicles plenty of time to see and avoid you! Follow the manual of traffic control for your area. Slips trips and falls are some of the most common injuries, look for hazards that could cause this. Be sure to inspect and wear your fall arrest harness. Here are the five topics again with signs and bubbles to jump start tailgate discussion!! Click on the icon to bring up a text box. Click on the icon again to make the text box go away Gets the crew involved. Gives the feeling of knowing it is ok to ask questions, give suggestions, see something, say something! The next slides will get directly into the task at hand. Visual, written and audio will all be used here! There are suggestions in the notes as to what to discuss. This will get the Team involved, creating communication channels to open!

Be certain to complete Your tailgate Be certain to complete Your tailgate. Inspect the structure as well as the spans leading to the structure for hazards. Be certain to complete Your tailgate. Inspect the structure as well as the spans leading to the structure for hazards.

Bond the truck to the system neutral.

Disconnect the pole ground if possible Disconnect the pole ground if possible. If the pole has an underground riser or lightning protection you will nee to keep this connected. Disconnect the pole ground if possible. If the pole has an underground riser or lightning protection you will nee to keep this connected.

Cover the neutral. Cover the neutral.

Cover the guy wire. Hold the cover up by the use of a hot tap on the guy wire.

Cover the nearest phase and bells Cover the nearest phase and bells. Be certain to cover any tails of wire that may be exposed. Cover the nearest phase and bells. Be certain to cover any tails of wire that may be exposed.

Cover the center phase and bells Cover the center phase and bells. Be certain to cover any tails of wire that may be exposed. Cover the center phase and bells. Be certain to cover any tails of wire that may be exposed.

Cover the cross arm and place a sling around it as an anchor point for your hoist.

Place the hoist inline with the handle away from the pole and an insulating link between the hoist and the sling. Place the hoist inline with the handle away from the pole and an insulating link between the hoist and the sling.

Take slack out of the line to the bells to be replaced.

Be sure to support the tail before releasing it from the bells. DON’T LET IT DROP! Be sure to support the tail before releasing it from the bells. DON’T LET IT DROP!

Remove the bad insulators. Be careful of sharp edges!

Replace The insulators.

Let the slack off of the hoist.

Remove the hoist. Remove the hoist.

Remove the sling and blanket from the arm.

Remove the cover from center phase.

Remove the cover from the nearest phase.

Remove the cove from the guy wire.

Remove the cover from the neutral

Reconnect the ground wires.

Remove the truck bond. Remove the truck bond.

The job is completed. The job is completed.