HMA-Testbed Project Call

Slides:



Advertisements
Similar presentations
GEOSS ADC Architecture Workshop Workflow Session Pier Giorgio Marchetti European Space Agency
Advertisements

Agenda Session (75 minutes duration, Friday sessions are 90 minutes) Co-lead introduces the session (5 minutes) –repeat of one chart from opening plenary.
HMA CDR, 5-6 September 2006, Frascati Slide 1 HMA Catalogue Update Presented By Paul Kopp On behalf of Jolyon Martin, ESA Summarising many presentations.
HMA Sep 2009 – Slide 1 Daniele Marchionni Elsag Datamat HMA Follow On – Task 4 - Workplan.
HMA AWG Slide 1 GIGAS Pier Giorgio Marchetti - European Space Agency
05 October 2010 HMA-FO Task 2: Feasibility Analysis Service HMA Follow On Activities Task 2: Feasibility Analysis Service (Sensor Planning Service) Monthly.
3 November 2009 HMA-FO Task 2: Feasibility Analysis Service HMA Follow On Activities Task 2: Feasibility Analysis Service (Sensor Planning Service) Monthly.
1 HMA Follow-on – Negotiation Meeting - Task 4 ESRIN – 24/06/2009 Issue: 1.0.
Page 1Overview of the HMA Project, 8 March 2010 Overview of the HMA Project OGC TC Opening Plenary Pier Giorgio Marchetti European Space Agency.
28 May 2010 HMA-FO Task 2: Feasibility Analysis Service HMA Follow On Activities Task 2: Feasibility Analysis Service (Sensor Planning Service) Monthly.
Frascati, 2-3 July 2008 Slide 1 CITE tests for and HMA-T Phase 2 KO Meeting 2-3 July 2008, Frascati Nicolas LESAGE, IGN.
HMA-FO ODA, January 2011 HMA Follow-On Task 3 Online Data Access in the frame of ESA's Heterogeneous Missions Accessibility (HMA) initiative Acceptance.
Welcome to the 2009 SSE Service Providers Workshop ESA - ESRIN, Frascati, Rome.
ESRIN, 15 July 2009 Slide 1 Web Service Security support in the SSE Toolbox HMA-T Phase 2 AR Meeting 15 July 2009 S. Gianfranceschi, Intecs.
Page /06/2014HMA-S Final Presentation - 11/06/2014 HMA for Science Executive Summary Y. Coene, Spacebel s.a. C. Gizzi, Airbus Defence and Space Final.
Hoeilaart, 19 February 2009 Slide 1 CITE tests for and HMA-T Phase 2 Progress Meeting 19 February 2009, Hoeilaart Nicolas Lesage, IGN.
Frascati, 2-3 July 2008 Slide 1 HMA User Management in G-POD HMA-T Phase 2 KO Meeting 2-3 July 2008, Frascati Fabrice Brito, Terradue Srl
HMA-T Progress Meeting 26 November 2008 Slide 1 IMAA-CNR activity report HMA-T Progress Meeting 26 November 2008 S. Nativi, E. Boldrini, F. Papeschi IMAA-CNR.
HMA-T Phase 2 KO, 2-3 July 2008 Slide 1 HMA-Testbed Phase 2 Negotiation and KO Meeting 2-3 July 2008, Frascati Yves Coene, SPACEBEL.
HMA AWG, 6 November 2013 Slide 1 HMA for Science - Status HMA AWG Meeting 6 November 2013, ESRIN Frascati Yves Coene, Spacebel s.a. Claudio Gizzi, Astrium.
Evolution and Perspectives for SSE Y. Coene, Spacebel s.a. M. Gilles, Spacebel s.a ESA - ESRIN, Frascati, Rome.
Spacebel - Hoeilaart, February 2009 SPS Mandatory I/F Development Slide 1 HMA SPS Mandatory I/F Development HMA-T Phase 2 Acceptance Review 1 18.
HMA Slide 1 Heterogeneous Missions Accessibility Follow On Pier Giorgio Marchetti - European Space Agency
ESRIN, 15 July 2009 Slide 1 Web Service Security support in the SSE Toolbox HMA-T Phase 2 FP 14 December 2009 S. Gianfranceschi, Intecs.
19 Feb 2009, Spacebel (Hoeilaart) OGC and activities HMA-T Phase 2 AR Meeting 19 Feb 2009, Spacebel (Hoeilaart) Frédéric Houbie, ERDAS.
FedEO KO 5 June 2007 Slide 1 FedEO Pilot Objectives Slides assembled from various sources, mostly HMA Final Presentation, 28 February 2006, Frascati Jolyon.
19 January 2010 HMA-FO Task 2: Feasibility Analysis Service HMA Follow On Activities Task 2: Feasibility Analysis Service (Sensor Planning Service) Monthly.
HMA-T User Management (07-118) Abstract Test Suite Dr Andrew Woolf STFC Rutherford Appleton Lab.
FedEO KO 5 June 2007 Slide 1 FedEO Catalogue Session. …
Frascati, 2-3 July 2008 Slide 1 User Management compliance testing for G-POD HMA-T Phase 2 KO Meeting 2-3 July 2008, Frascati Andrew Woolf, STFC Rutherford.
Frascati, 2-3 July 2008 SPS Mandatory I/F Development Slide 1 HMA SPS Mandatory I/F Development HMA-T Phase 2 KO Meeting 2-3 July 2008, Frascati Ricardo.
GIGAS Introduction and contribution to SIF
HMA Identity Management Status
HMA Follow On Activities
CEN 202 “Space Standardisation”
HMA AWG Configuration Management Status 1 December 2008
DREAM High-Level Architecture
HMA Follow On Activities
WPS updates from ESA Projects
HMA Identity Management Status
IMAA-CNR activity report
CITE tests for and HMA-T Phase 2, FP Meeting
EO Profile of GML and HMA Product Catalog for VITO CVB
HMA SPS Mandatory I/F Development
HMA Follow On Task 1 Standards evolutions
SMAAD Project Summary SMAAD Final Presentation – updated for
SMAAD Project Semantic Annotation and Mediation
HMA Follow On Activities
Overview of Progress HMA Standardisation Work
HMA-FO Task 1 Workplan HMA AWG 30th of September 2009 Darmstadt OGC TC
HMA-Testbed Phase 2 AR-2 Meeting July 2009, Frascati
Overview of HMA/DAIL Overview of HMA ICDs HMA implementation at ESA
HMA Follow On Activities
CEOS OpenSearch Project II
Contributions to Testing and Reference Data
Standardisation Status Update
DREAM Project CSA-ESA Bilateral Meeting 16 February, Frascati
CITE tests for and HMA-T Phase 2 Progress Meeting
Session 2: Metadata and Catalogues
HMA-FO Task 1 Status Frédéric Houbie, ERDAS Steven Smolders, GIM
HMA Follow-on Kickoff Meeting
HMA-T: “EO GML” and “EO ebRIM CSW” for VITO CVB
OGC and activities HMA-T Phase 2 KO Meeting
CITE tests for and HMA-T Phase 2, FP Meeting
Status OpenSearch Standardisation Activities - HMA-S Project
Pier Giorgio Marchetti - European Space Agency
HMA for Science Task 1 – Project Management
Web Service Security support in the SSE Toolbox
CNR-IMAA Proposal ( and )
EO profile for WMS progress report
Presentation transcript:

HMA-Testbed Project Call HMA Architecture Working Group Meeting 4 June 2008, Potsdam (Germany) Yves Coene, SPACEBEL Slide 1

HMA-T Objectives ITT and Proposal information Schedule and Reviews Evolution CITE Uptake Open-source implementations Schedule and Reviews Slide 2

HMA-T Objectives Permit evolution and test of HMA interoperability standards in parallel with EODAIL-Implementation and implementation of I/F with Partner G/S. Permit conformance testing of any HMA adopted standards. Support take-up of HMA defined standards by European Institutional Users and geospatial software product developers Slide 3

ITT Phase 2 Closing date 14 April 2008 11 (partial) Proposals selected by TEB. Allocated budget approximately 475 KEUR. Become subcontractors of SPACEBEL. Selected organisations notified 27 May 2008. KO (i.e. T0) planned 2-3 July in ESRIN Slide 4

HMA-T Phase 2 Support evolution of specifications OGC 06-131 EO Extension Package for ebRIM (ERDAS) OGC 07-038 ISO Extension Package for ebRIM (ERDAS) Slide 5

HMA-T Phase 2 Conformance Testing (CITE) OGC 06-131 EO Extension Package for ebRIM IGN CNR-IMAA OGC 07-038 ISO Extension Package for ebRIM Conterra (base level conformance + INSPIRE guidance) OGC 07-118 User management for EO Terradue Intecs Slide 6

HMA-T Phase 2 Support uptake of HMA standards OGC 06-080 EO Profile of GML applied to VITO synthesis products (GIM) OGC 06-131 EO Extension Package for ebRIM applied to VITO synthesis products (GIM) OGC 07-018 EO Profile of SPS implementation for Radar – Earth Explorer (Deimos) and Optical (Spot Image) OGC 07-063 EO Profile WMS implementation (NLR) OGC 07-118 User Management integration with G-POD Grid (Terradue) Slide 7

HMA-T Phase 2 Open-source support of HMA standards OGC 07-118 User Management - Open-source SSE toolbox implementation (Intecs) OGC 07-063 EO Profile WMS open-source implementation – based on UMN Mapserver (Infoterra) OGC 06-131 EO Extension Package for ebRIM implementation in opensource Gi-cat (CNR-IMAA) OGC 07-038 ISO Extension Package for ebRIM implementation in opensource Gi-cat (CNR-IMAA) Slide 8

Reviews Event At Proposed Date Name M21-KO2 ESRIN 02-07-2008 Phase 2 Kick-off M22-AR2 Spacebel (Brussels) T0+9M Acceptance Test Review (AR) Phase 2 M23-FP2 T0+11m Final Presentation (FP) Phase 2 Slide 9