HMA-Testbed Project Call HMA Architecture Working Group Meeting 4 June 2008, Potsdam (Germany) Yves Coene, SPACEBEL Slide 1
HMA-T Objectives ITT and Proposal information Schedule and Reviews Evolution CITE Uptake Open-source implementations Schedule and Reviews Slide 2
HMA-T Objectives Permit evolution and test of HMA interoperability standards in parallel with EODAIL-Implementation and implementation of I/F with Partner G/S. Permit conformance testing of any HMA adopted standards. Support take-up of HMA defined standards by European Institutional Users and geospatial software product developers Slide 3
ITT Phase 2 Closing date 14 April 2008 11 (partial) Proposals selected by TEB. Allocated budget approximately 475 KEUR. Become subcontractors of SPACEBEL. Selected organisations notified 27 May 2008. KO (i.e. T0) planned 2-3 July in ESRIN Slide 4
HMA-T Phase 2 Support evolution of specifications OGC 06-131 EO Extension Package for ebRIM (ERDAS) OGC 07-038 ISO Extension Package for ebRIM (ERDAS) Slide 5
HMA-T Phase 2 Conformance Testing (CITE) OGC 06-131 EO Extension Package for ebRIM IGN CNR-IMAA OGC 07-038 ISO Extension Package for ebRIM Conterra (base level conformance + INSPIRE guidance) OGC 07-118 User management for EO Terradue Intecs Slide 6
HMA-T Phase 2 Support uptake of HMA standards OGC 06-080 EO Profile of GML applied to VITO synthesis products (GIM) OGC 06-131 EO Extension Package for ebRIM applied to VITO synthesis products (GIM) OGC 07-018 EO Profile of SPS implementation for Radar – Earth Explorer (Deimos) and Optical (Spot Image) OGC 07-063 EO Profile WMS implementation (NLR) OGC 07-118 User Management integration with G-POD Grid (Terradue) Slide 7
HMA-T Phase 2 Open-source support of HMA standards OGC 07-118 User Management - Open-source SSE toolbox implementation (Intecs) OGC 07-063 EO Profile WMS open-source implementation – based on UMN Mapserver (Infoterra) OGC 06-131 EO Extension Package for ebRIM implementation in opensource Gi-cat (CNR-IMAA) OGC 07-038 ISO Extension Package for ebRIM implementation in opensource Gi-cat (CNR-IMAA) Slide 8
Reviews Event At Proposed Date Name M21-KO2 ESRIN 02-07-2008 Phase 2 Kick-off M22-AR2 Spacebel (Brussels) T0+9M Acceptance Test Review (AR) Phase 2 M23-FP2 T0+11m Final Presentation (FP) Phase 2 Slide 9