Project Nexus Workgroup 9 th September Background During detailed design a number of areas have been identified that require clarification with.
UNC Modification Proposal 0116 Reform of the NTS Offtake Arrangements Transmission Workstream 5 th October 2006.
Operating Margins. 2 Competitive Provision of Operating Margins Change to National Grid Gas’s Transporter Licence which:  Introduced Special Condition.
Joel Martin 23 rd November 2010 MOD 329 – UNC Rules on setting SHQs / SOQs & the Network Referral Process.
Review of Offtake Arrangements Document Section I - NTS Operational Flows 9 th July 2010 – Offtake Arrangements Workstream.
UNC (Urgent) Modification Proposal 0044: “Revised Emergency Cash-out & Curtailment Arrangements” UNC Transmission Workstream 11 th August 2005.
UNC Proposal 329 – Review of Industry Charging & Contractual Arrangements - DM SHQs and DM SOQs Joel Martin – 21/09/10.
Offtake Arrangements Document – An Overview Paul Roberts 12 th May 2005.
Performance Assurance 21 st May Value Chain. Value Chain Xoserve would like to propose an approach to further aid the development of the Performance Assurance.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Enduring Exit Regime & NTS Risk Management Processes Offtake Arrangement Workstream – OAD Section I Review Group 316.
Emergency Cashout Prices and Emergency Curtailment Quantity (ECQ) Adjustment Ritchard Hewitt Gas Code Development Manager.
PN UNC Workgroup Read Validation 4 th October 2011.
UNC Modification 0050 – Storage Monitor Adjustment.
Review of Offtake Arrangements Document Section I - NTS Operational Flows 10 th June 2010 – Offtake Arrangements Workstream.
DN Interruption Reform Transmission Workstream Mark Freeman 5 th April 2007.
Stuart Forrest, Network Planning Manager, Scotia Gas Networks 19 th October 2010 MOD Review of Industry Charging & Contractual Arrangements in Relation.
Transitional offtake arrangements – Ofgem Initial Proposals on transitional incentives 6 October 2005.
Supply Point Capacity BSSOQ and Supply Point ratchets
Workgroup meeting October 2014
Wales & West Utilities Entry – Standard Special Condition D12
Transitional Exit Capacity Proposals -Update
UNC Modification Proposal 0202 National Grid Distribution
SGN Modification Proposal Amendments to UNC TPD OCS Process Long Term Allocation of Capacity for the Transitional Period.
Modification 0282 Action 002 Update
Review of System Alerts
Offtake Workstream : 8th September 2010
Transmission Workstream 4th July 2007
MOD0166 – Reform of the NTS Offtake Arrangements Shipper Perspective
Simon Trivella – 22nd May 2008 Distribution Workstream
Modification Proposal 0283
DSR Volumetrics Workgroup 3 10 September 2014.
Enduring Offtake Arrangements (Including an alternative daily interruptible capacity release mechanism to facilitate use of spare capacity) Peter Bolitho.
Review of Physical Regime Times for Modification Proposal 461
MOD National Grid NTS Initiated Flow Swaps
DN OAD Processes: RG 0316 : Offtake Workstream
Mod_38_18 Limitation of Capacity Market Difference Payments to Loss Adjusted Metered Quantity. 12th December 2018.
Supply Point Capacity BSSOQ and Supply Point ratchets
Modification Proposal 0101 – “Amendment to demand forecasting timings in relation to the Gas Balancing Alert”
Review Group 166 End User Perspectives 20 September 2007 Julie Cox.
Flow Swaps at NTS / LDZ offtakes
Review Group 0175: DM Supply Point Emergency Arrangements
Proposals to be Reviewed
Review Group /09/2007.
Proposed Transitional Gas Exit Arrangements
Proposed Changes to UNC Section O
Stefan Leedham 22 November 2007
UNC Transmission Workstream 15th June 2005
Assured Pressures Proposal
Mark Freeman 29th January 2007
Reinstatement of NTS Interruption
Proposer: Debbie Brace Panel Date: 20th March 2014
Transmission Workstream – 6th July 2005
PN UNC AMR Topic Workgroup
MP0131: Meter Error Notifications
GT Response to Action AMR014 Project Nexus AMR Workgroup 20th July | Energy Networks Association.
Information Provision for Transitional Exit Capacity
Daily Metered Supply Points
Workgroup meeting October 2014
Tom Welch October 18, 2002 Boston, Massachusetts
195AV “Future work” – system flexibility
Modification 0043 – Limitation on offering for sale unsold capacity
Proposed Changes to UNC Section Q Emergencies - Mod 035
Modification 440 Project Nexus iGT Single Service Provision
Off-peak interruptible service to compliment universal firm/buy-back regime Peter Bolitho.
Change Management Committee
Presentation transcript:

Provision of Interruption Information by DNOs to Transco NTS Andy Malins

Proposal Modify OAD to place an obligation on DNOs to provide their best estimate of the actual daily gas flows that will be available for Interruption.

Proposal Issue Transco NTS needs information on capacity available for interruption to aid management of transportation constraints and emergencies. Information required under current Offtake Arrangements Document is insufficient to enable optimum decisions to be made. Information required for start of winter 2005/06

Impact of Retaining Current Arrangements “Spare” capacity Int. SOQ Transco NTS need (and call for) 75kWh of interruption 100 100 Further actions required kWh Available Int cap. kWh 50 50 Shortfall

Interruption Information Interruption Manager predicts expected flows based on meter readings. Gives a realistic estimate of capacity available to be interrupted. Anticipated Impact on DNOs Minimal capital or development cost implication Minimal system or process changes Information Based on SOQs Predictive Source Pre-Hivedown Yes Transco OAD No DNOs Proposal