Research as a new activity of the CIS WG 2B

Slides:



Advertisements
Similar presentations
Overview of WFD key issues and research needs in Europe Activity leaders: NL and ES Marc de Rooy, RIZA, NL Jornadas sobre la Aplicación de la Directiva.
Advertisements

CIS Work Programme WFD Team, DG ENV.D.2, European Commission.
Pilot River Basin Network: Environment Directorate
European Commission DG Environment
WG B Progress report Water Directors meeting Mondorf May 20 and 21
New Work Programme and mandates 2005/2006
Marine Strategy Framework Directive (MSFD)
WG 2.B Integrated River Basin Management
WG 2.B Integrated River Basin Management
Progress report on activities and outputs of DG eco 1
Philippe Quevauviller, Johannes Grath
Agenda item 6e) Update on progress elaboration of Article 4.7 Guidance
Proposed CIS Workshop on WFD Economic Issues
INTEGRATED TESTING OF GUIDANCE DOCUMENTS IN PILOT RIVER BASINS
Improving the SCG added value : Food for thoughts
on Priority Substances Strategic Coordination Group
Strategic Co-ordination group “Integrated River Basin Management”
Strategic Coordination Group
JRC-Institute for Environment and Sustainability
Water Directors’ Meeting Common Implementation Strategy
“WFD &Hydro-morphology”
CIS Work Programme WFD Team, DG ENV.D.2, European Commission.
Commission's activities
Meeting of Water Directors WFD Common Implementation Strategy
Activity on environmental objectives and exemptions
WGB Activity on Information exchange and research needs
WFD, Common Implementation Strategy   Water Scarcity and Droughts Expert Network Brussels, July 2, 2009.
Horizontal Guidance on Wetlands What happened since the last Meeting
WG C Groundwater Draft Mandate
NATURA 2000 and Water Framework Directive (CIS )
Update on progress since last WG meeting (13-14 June 2002)
INTEGRATED TESTING OF GUIDANCE DOCUMENTS IN PILOT RIVER BASINS
WFD, Common Implementation Strategy  Water Scarcity and Droughts Expert Group Madrid, February 17, 2010.
Strategic Steering Group
Meeting of Water Directors Future Work Programme of the CIS
Harmoni-CA initiative
WG 2.B Integrated River Basin Management
The Common Implementation Strategy – an overview
1st Implementation Report of the Water Framework Directive
WG 2.B Integrated River Basin Management
WFD and Hydro-morphology
Green Paper on Adaptation and
CIS Strategic Steering Group on Climate Change and Water
Implementation EU White Paper Climate Change Adaptation Specific actions DG Environment Feedback from Expert Group Climate change and water Jacques Delsalle.
8-c) Expert Group & River Basin Network on WFD & Agriculture
Legal issues in WFD implementation WD meeting 16 June 2008 Jorge Rodríguez Romero, Unit D.2, DG Environment, European Commission.
WGB Activity on Information exchange and research needs
Pilot River Basin exercise.
Pilot River Basin Water Framework Directive.
EU Water Framework Directive
Work Programme of the CIS
Activity on WFD and Agriculture
Water Directors meeting Mondorf-les-bains, June 2005
Integrated Testing in Pilot River Basins
CIS work programme Supporting the implementation of the first river basin management plans Water Directors' Meeting 30 November and 1 December.
Common Implementation Strategy for the Water Framework Directive
Organisation Water Directors Strategic Co-ordination Group
7.e) Expert Group on agriculture
Water Science-Policy Interface (CIS-SPI) Progress report
WG C-1 activity Berlin – 3 May 2007
Jacques Delsalle, DG Environment, Unit D.1
EIONET and EUROWATERNET Common Implementation Strategy
WG2B Activity Sheet Information exchange and research needs
Concept paper on the assessment of WFD River Basin Management Plans
Planning to develop the CIS Work Programme
Brussels – 20 April 2007 European Commission - DG Environment
WFD Expert Group on agriculture A new mandate for
SCG May 2005 CIRCA review.
History EU+Norway Water Directors meeting in Paris Oct 2000 Member States and the European Commission agreed in Paris to developed a Common Strategy.
Environmental Objectives and Exemptions State of Play
Presentation transcript:

Research as a new activity of the CIS WG 2B Manuel Menéndez Scientific and Technical Coordinator Centro de Estudios Hidrográficos del CEDEX

Strategic Coordination Group “Integrated River Basin Management” CIS since beginning of 2003 Water Directors Chair: Presidencia, Co-chair: Comission Expert Advisory Forum 1) Priority substances 2) Aguas subterráneas Chair: Commission Art. 21 Comité Strategic Coordination Group Chair: Commission Working Group 2.A “Ecological Status” Lead: D, UK Working Group 2.B “Integrated River Basin Management” Lead: F,SP Working Group 2.C “Groundwater” (after end of EAF GW) Lead: Comision Co-lead: A Working Group 2.D “EAF Reporting” Lead: Comision

Integrated river basin management Working group 2B (Since beginning 2003) Presented to WD in June 2004: Economic Analysis Baseline scenario Cost recovery Eco I Inf sheets Eco II Env. costs. In progress Pilot River Basins From in. Ch to RBMPs In progress Workshop and Plenary meeeting 21-22 October 2004

Working Group 2B. Future Activities (2005-2006) France, Spain with specific activity leaders as The Netherlands and United Kingdom The Netherlands, Spain Art. 5 and research Pilot River Basins Agriculture United Kingdom Cost- efficiency PRB leaders. Technical Secretary: JRC France

Working Group 2B. Future Activities (2005-2006) Now in process of elaborating mandates (information sheets) for each activity: Recommendations from WD meeting in Dublin (June 2004) Meeting of “brainstorming group”: F,D,N,S,UK, Comission, JRC in Brussels (8 Sept) PRBs discussion in Ghent. (4-5 October) General discussion in plenary meeting in Paris (21-22 October) Presentation and discussion in SCG ( 27-28 October)

WG 2B Activity 1: exchange of information and highlighting best practices and research needs on key issues of IRBM European relevance Article 5 reports (including PRBs experiences) are a good basis to know major issues in order to meet the objectives of the WFD For each problem identified it is foreseen to define activities that may merit a EU approach in the way of reference products: information papers, information exchange activities, etc. The process will serve, as well, to develop an overview of knowledge gaps that need further research

EU-wide resolving approach Be as specific as the level needs or as general as the level can be Certain issues can be dealt with optimally at EU level

Role of PRBs PRBs may pick up a subject identified as a key issue and contribute to prepare a EU wide reference (information papers, information exchange activities including workshops, etc). A reference product can be tested by PRBs according their specific characteristics/interests for example: Defining ways to improve the processes for validadtion of tools and methodologies Providing information on restrictions in the use of research results as lack of available data, trained staff, etc

Specific activities in 2005 January-March 2005: Collection of provisional topics from all Member States April 2005: Workshop for “technical” endorsement of the list and “pyramid check”. Plenary meeting and consequences in other WPs of WG 2B (as PRBs). Workshop for first tentative translation to research topics. May-September 2005: Discussion activities between WFD implementers (including PRBs) and research community to translate WFD demands into research topics October 2005: Discussion of results in plenary meeting of WG2B. November 2005: Presentation to SCG December 2005: Presentation to WD