Existing Maximum Capacity = 240 (approx.) Comfortable Seating = 170 (approx. 70%) Current Sunday Attendance = 160 (approx.) During Awana Night, Every.

Slides:



Advertisements
Similar presentations
Occupancy Classifications and Loads
Advertisements

IIT – Bailey Hall – Graduate Student Housing – Existing Conditions
Architecture CAD living sleeping service SPACE PLANNING
Oakwood Presbyterian Church Feasibility Study 10/02/2012Copyright Hoffman Architecture The Trellis and the Vine Oakwood Presbyterian Church.
NEW PALTZ CENTRAL SCHOOL DISTRICT Comprehensive Facilities Master Plan – Progress Report Summary.
Congregation Survey Summary & Program Statement KATY first united methodist church August 30, 2009.
ART ROOM Expectations Ms. Rech ~ Room 118. B e Creative Use Your Imagination Try Your Best & Have Fun GOAL: to be a better, more confident artist everyday.
Building Expansion Project Update ECCC 4.9 Growth Strategy We will continue to grow as a “one site multi congregations & services” church.
Building Plan Presentation The Evangelical Lutheran Church of The Holy Trinity.
Redecorating Committee Report. Qualities of Church Abundance Unity Classic design Comfort Sharing Light Growth Beauty Joy What qualities do we want to.
My House By Marissa Esposito. The Style of my house The style of my house that I chose to do is Victorian.
Logo. PRELIMINARY SITE PLAN PROGRAM GOALS Embrace & live out our Mission Grow in commitment to Christian living through: Education, Worship, Stewardship,
ECCC Growth Strategy. Average Sunday Attendance ,006 1,120.
Church Renovation/ Expansion Proposals Willowdale.
Room Planning, and living area
Room Planning Living Area 1.
Guidelines for Living Space How to Design the Living Areas.
ADDITION & REMODEL Eugene Field Elementary School.
SCHOOLS-II PRESENTED BY: PEARL SIDHU G.P.C.G. PATIALA.
Room Relationships and Sizes
1 Advisory Group Meeting October 4, Topics to Be Discussed Overall Plan Overall Plan Review of Three Site Visits Review of Three Site Visits Congregation.
Grace Bible Church Ministry Goals & Master Plan Presentation.
©2009 Strang, Inc. Orchard Ridge United Church of Christ September 20, 2009.
United Church of God – Lafayette, Indiana Building Fund Discussion.
Living Areas & Furniture Arrangement
Code Analysis: Don’t try this at home. Identify the relevant codes  Local building code  Local accessibility code (or ADA)  Local fire code (or the.
March 12, 2015 Ss. John & Paul Catholic Church Feasibility Study.
Ideal learning environment The place you work in can make a big difference to the quality of your work.
The following slides are photos of the current construction progress on the Marvin & Joyce Whitfield Life Campus.
1535 Capel St Park West ~ Mt Pleasant ~ MLS# ~ $735,000 This beautiful elevated home is a wonderful opportunity to move into the highly desirable.
Schematic Lighting Design Natty Boh Building Baltimore, Maryland Eric Singley Penn State University Architectural Engineering.
Space Planning Objective Grouping by FUNCTION 0 When designing the layout of a house, rooms with similar functions are usually grouped together.
7 Planning the Living Area Chapter. Permission granted to reproduce for educational use only.© Goodheart-Willcox Co., Inc. Objectives Identify the three.
October 15, 2012 Oakwood Presbyterian Church Feasibility Study Design Meeting 2 Copyright Hoffman Architecture /02/20121.
Greater Mt. Zion Baptist Church 26 January 2014 Jackson Galloway Associates, PLLC.
` riddle design 25 January 2009 Emmanuel Episcopal Church Formation Addition and Renovations.
Family Life Center / Youth Center 201 Music Office 216 – 217 Children’s Classroom 202 – 203 future use 218 Kid’s Klub 204 old sanctuary 219 – 220 Storage.
 Function:  How a space will be used.  Dictates the selection and arrangement of furniture.  How can you combine functions with furniture arrangement?
New Listing - Walnut Farms Perfect for entertaining! This spacious custom built home with 4 bedrooms and 3 full baths on over a half acre wooded and landscaped.
Beth Messiah Congregation Building Committee Status March 27, 2010 Major Congregational Needs Additional Sanctuary seating Continuous enhancement of our.
Schematic Lighting Design Natty Boh Building Baltimore, Maryland Eric Singley Penn State University Architectural Engineering.
Facilities for a Quality Child Development Program Child Services II.
School Media Center Facility Designs Angela Bates SLIS 5130 – Spring 2010 April 9, 2010.
Apostolic Faith Church Washington, DC Northern Virginia Fellowship (New Location for 2016) Glade Community Building Glade Drive, Reston, VA.
R.E. Subcommittee on Growth – Jan workshop What are the triggers points where changes are needed to the program / class configurations? Sanctuary.
Please Quiet Your Cell Phones In the Sanctuary Before Service Begins Thanks.
Stainbeck Community Hall 162 Stainbeck Lane, LS7 2NF. Telephone: or Owned by St. Matthews.
Planning Living Areas. What is a Living Area? Living Room Dining Room Family Room Entryways.
+ Family Rooms, Entryways, Patios, Porches, Courts By, Brylee, Tara, Shelly, Lily.
AP Statistics Mrs. Marino. Information Card Name:____________________ Your _____________________ Parents: Name________________________ Phone Number.
Aldersgate Visioning Update “Do justice, love kindness, and walk humbly with God” - Micah 6:8.
Sauriol Bohde Wagner architects and associates, inc Garfield Road Macomb, Michigan ph fx.
The Campus 2.06 Acres or 89,734 sq ft of Land 25,058 sq ft Church Building 4,239 sq ft Sanctuary 497 sq ft Balcony 20,322 sq ft Multipurpose.
3700 Maple Hill Road Fairfax VA 22033
Cornwall Central School District
UPDATE ON DOE RUN ELEMENTARY CONSTRUCTION PROGRESS
Building Committee April 20th, 2016.
The VISION of Multiply Matthew 28:18-20 – Go therefore and make disciples of all nations, baptizing them in the name of the Father and of the Son and.
Project 105 Report to Congregation
Occupancy Classifications and Loads
Space Planning Objective 5.01.
Occupancy Classifications and Loads
Room Planning, and living area
Community Life at St. Giles
Park Place Wesleyan Gala 2019
Preparing Environments for Young Children
Phase II Committee Forrest Barber Johnny Davis Mike Hannon Brandon Harwood Kelly McKay Jim McCoy Becky Roberts.
LEE ACRES CHURCH OF CHRIST TUPELO, MISSISSIPPI
Architecture Week Two.
Presentation transcript:

Existing Maximum Capacity = 240 (approx.) Comfortable Seating = 170 (approx. 70%) Current Sunday Attendance = 160 (approx.) During Awana Night, Every Square Foot of Space is Used

Existing Building Divided Spaces New Entry/Foyer New Sanctuary Future Gym

Existing Building Expanded Sanctuary (w/ Balcony) Fellowship Hall Kitchen Enlarged Foyer Office Spaces Future Gym

Existing Building Expanded Kitchen New Classrooms Storage Area Large Classroom Expanded Open Area

Existing Building Additional Classrooms Office Spaces Expanded Sanctuary w/o Balcony Future Gym

Existing Building Expanded Kitchen New Classrooms Storage Area Water Storage for Sprinkler System

Alternative B is generally the preferred approach to expanding the church facility Some have expressed reservations regarding a balcony Open area at rear of sanctuary would be ideal for coats, seating, tables, literature displays, and coffee

Many like idea of fellowship hall on main floor – some have expressed preference for an even larger fellowship hall at the expense of a gym Some are content to have gym serve as fellowship hall and others not

Provide plenty of storage space for tables and chairs for the fellowship hall/gym Be sure locker rooms have showers Like receptionist area and cluster of office spaces at front of building

Make sure there is a space for Cubbie games that does not occupy the sanctuary Some like Alternative C with respect to the floor plan of the main building, but did not like the separation between the church and the gym Some liked Alternative A (with modifications to the foyer of the new sanctuary)

Home phone Cell Phone