Theodolite - Instrument Checks

Slides:



Advertisements
Similar presentations
Theodolite: Introduction
Advertisements

Surveying I. Lecture 4..
Surveying I. Lecture 2..
Sz. Rózsa: Surveying I. – Lecture 2
The Abney Level Useful for simple slope profiles, horizon diagrams and height measurements Level bubble Rotating Arm Eyepiece Scale (in degrees)
Types of angles A Z MLN – Horizontal angle ALM – Vertical angle
Distance observations
Horizontal Angle Measurement Theodolites or Transits can Measure: horizontal angles vertical angles distances (stadia) elevations.
Faculty of Applied Engineering and Urban Planning Civil Engineering Department First Semester 2010/2011 Surveying Chain Surveying Part I Lecture 4 - Week.
CE 260 SURVEYING CHAPTER 5.
1 EDM Calculations ASM 215 EDM CALCULATIONS. 2 EDM Calculations HORIZONTAL DISTANCE MEASUREMENT n In plane surveying, the distance between two points.
S.H.H.S Building Construction
Topographic instruments
Re - run of fine levelling procedure Position a Bubble follows LEFT THUMB.
CIVL 102 Leveling Lab Briefing on Field Work. Instrument error  suppose Instrument error  suppose line of sight not truly horizontal as telescope is.
Manufacturer’s Recommendation for Setting up a Theodolite
Levelling: Sources of Error
Position b 90 0 to position a Bubble still follows LEFT THUMB.
TERRESTRIAL SURVEYING
Angular measurement 1. Line of sight – the join of the points S and P Horizontal direction – the intersection between the vertical plane  i where is.
Sz. Rózsa: Surveying I. – Lecture 1
CHAPTER 3 LEVELING.
Surveying I. Lecture 3..
SURVEYING Preamble Surveying is involved in a project from conceptual stage to construction and afterwards in maintenance also. Depending on the stage.
Tacheometric surveying
TOTAL STATION SET UP PROCEDURE
SETTING OUT Horizontal Angles. Ensure instrument is set to measure angles in the appropriate direction. ( refer to operators manual) Unclamp both vertical.
Surveying Techniques I. The USGS supplies 1:24,000 scale maps for all the U.S. But detailed topography at larger scales is rare and/or.
Levelling Applications:
THEODOLITE SURVEYING THEODOLITE SURVEYING
Alternate River/Valley Crossing Procedure for Theodolites Kendall Fancher Chief, NGS Instrumentation & Methodologies Branch
SUBJECT NAME : SURVEYING GROUP NO. 8 ENROLMENT NO. NAME ARCHIT MEWADA ANUJ PATEL HARDIK M PATEL JAIMIN.
Objective To use angles of elevation and depression to solve problems.
90 Vertical Horizontal Oblique line a b Angles a + b = 180 o Angles at a Point b = 115 o Angle a = 180 – 115 = 65 o.
Topic : Theodolite Traversing
THEODOLITE SURVEYING THEODOLITE SURVEYING. THEODOLITE SURVEYING THEODOLITE SURVEYING.
Levelling Horizontal Line Pull of Gravity Reduced Level Height
Traversing: Theodolite Traverse
Theodolite Traversing Mr. Vedprakash Maralapalle, Asst. Professor
ENGINEERING COLLEGE TUWA
FACULTY OF ENGINEERING TECHNOLOGY AND RESERCH, TAJPORE, BARDOLI CIVIL ENGINEERING DEPARTMENT SURVEYING ( )
Miscellaneous Measurements
Surveying I. Lecture 3..
TYPES OF LEVELS BY SUMIT M. MESHRAM.
Visit for more Learning Resources
Theodolite: Introduction
Theodolite: Introduction
S. N. PATEL INSTITUTE OF TECHNOLOGY & RESEARCH CENTRE , UMRAKH
Introduction Theodolite is used to measure the horizontal and vertical angles. Theodolite is more precise than magnetic compass. Magnetic compass measures.
THEODOLITE TRAVERSING BY S N Nanaware
Setting Out, Theodolites and Total Stations
Auto Level View though eye piece Purpose
Leveling Intro to Leveling.
Levelling Horizontal Line Pull of Gravity Reduced Level Height
Level Loop (or Closed Circuit)
SURVEYING – II THEODOLITE
Levelling Horizontal Line Pull of Gravity Reduced Level Height
Leveling By : Parveen Kumar.
TACHEOMETRY.
Leveling.
Tachometry.
Leveling.
THEODOLITE.
Leveling.
Leveling.
Some Typical Theodolite Diaphragms
Leveling.
Revise No. 1.
Leveling.
LEVELING.
Presentation transcript:

Theodolite - Instrument Checks There are 6 possible instrument errors: 1) Plate Bubble Error . This is checked every time the theodolite is set up. i.e. check the bubble drift in positions c) and d) and then eliminate the error by “ Freezing the Bubble”. 2) Non - Vertical Cross Hairs . Move the telescope up and down while sighting a well defined distant point. Any error will be very obvious ! 3) Horizontal Collimation Error . Sight a well defined point and read the horizontal circle on F/L and F/R. The difference in the minutes and seconds should be <40” 4) Trunnion Axis Dislevelment . - Spire Test. Sight a well defined elevated point (church spire) then lower the telescope onto a tape or staff about 40m away. The difference between F/L and F/R should be < 5mm for most engineering applications. It is not acceptable for PLUMBING PURPOSES e.g. verticality of columns.

Theodolite - Instrument Checks (cont) 5) Vertical Collimation Error . Sight a well defined point and read the vertical circle on F/L and F/R. The difference in the minutes and seconds should be <40” (the vertical collimation error is often larger than this and for slope corrections it is not too critical) e.g. a 60” error in an angle of 50 over a sloping distance of 100m is given by : Horizontal distance = 100 cos 50 or 100 cos 50 01’ 00 ” = 99.619 or 99.617 i.e. an error of 2mm. 6) Optical Plumb Error . Check the optical plumb alignment in two positions 1800 different. Rotated by 1800 Readjusted to mid point Initial position