Microsoft TechNet Seminar 2006

Slides:



Advertisements
Similar presentations
IBM Software Group ® Integrated Server and Virtual Storage Management an IT Optimization Infrastructure Solution from IBM Small and Medium Business Software.
Advertisements

Minimising IT costs, maximising operational efficiency minimising IT costs, maximising operational efficiency Balance.
Windows Server ® 2008 File Services Infrastructure Planning and Design Published: June 2010 Updated: November 2011.
Daniel Kenyon-Smith UC Consultant – MCS UK. Optimize for Software + Services Deployment Flexibility Continuous Availability Simplify Administration Manage.
Mission Critical Messaging Platform Roni Havas Unified Communications Solution Specialist Specialists Technology Unit – EPG - Microsoft Israel
The System Center Family Microsoft. Mobile Device Manager 2008.
Intro to SharePoint 2013 Architecture Liam Cleary.
1 Storage Today Victor Hatridge – CIO Nashville Electric Service (615)
1 Disk Based Disaster Recovery & Data Replication Solutions Gavin Cole Storage Consultant SEE.
F5 Solution for Microsoft Exchange 2010 James Hendergart Business Development Manager Helen Johnson Solution Engineer.
Oracle Data Guard Ensuring Disaster Recovery for Enterprise Data
1 © Copyright 2010 EMC Corporation. All rights reserved. EMC RecoverPoint/Cluster Enabler for Microsoft Failover Cluster.
Business Continuity and DR, A Practical Implementation Mich Talebzadeh, Consultant, Deutsche Bank
Unified Communications Launch 2007 Microsoft Exchange Server 2007 SP1 Colin Lee Technology Specialist – Unified Communications Microsoft Corporation.
NHSmail: Technology Refresh 26 th February 2008 Mike Dolan NHSmail Migration Manager.
Jaap Wesselius May 27, 2009 Exchange Server 2010 what’s new?
Session 2: Core Infrastructure Design Andrew Hill – Consultant Rob Lowe – Consultant MCS Talks Infrastructure Architecture.
Virtual techdays INDIA │ September 2011 High Availability - A Story from Past to Future Balmukund Lakhani │ Technical Lead – SQL Support, Microsoft.
Enterprise GIS Architecture Deployment Options
1© Copyright 2011 EMC Corporation. All rights reserved. EMC RECOVERPOINT/ CLUSTER ENABLER FOR MICROSOFT FAILOVER CLUSTER.
Implementing High Availability
EXC11: Migrating to Exchange 2010 from Exchange 2003 Jim McBee Ithicos Solutions LLC
Module 8 Implementing Backup and Recovery. Module Overview Planning Backup and Recovery Backing Up Exchange Server 2010 Restoring Exchange Server 2010.
Exchange 2010 Project Presentation/Discussion August 12, 2015 Project Team: Mark Dougherty – Design John Ditto – Project Manager Joel Eussen – Project.
Introduction to Data Protection Manager Damir Bersinic IT Pro Advisor Microsoft Canada
EXL311: Exchange Server 2013 Architecture Deep Dive Scott Schnoll Microsoft Corporation EXL311.
Chapter 10 : Designing a SQL Server 2005 Solution for High Availability MCITP Administrator: Microsoft SQL Server 2005 Database Server Infrastructure Design.
Cluster Shared Volumes Reborn in Windows Server 2012: Deep Dive Amitabh Tamhane Vineeth Karinta Program Manager 2 Senior Engineer Microsoft Corporation.
Implementing Multi-Site Clusters April Trần Văn Huệ Nhất Nghệ CPLS.
Module 12: Designing High Availability in Windows Server ® 2008.
Chapter 8 Implementing Disaster Recovery and High Availability Hands-On Virtual Computing.
Module 2 Designing Microsoft® Exchange Server 2010 Integration with the Current Infrastructure.
Microsoft and Community Tour 2011 – Infrastrutture in evoluzione Community Tour 2011 Infrastrutture in evoluzione.
Module 9 Planning a Disaster Recovery Solution. Module Overview Planning for Disaster Mitigation Planning Exchange Server Backup Planning Exchange Server.
Appendix A UM in Microsoft® Exchange Server 2010.
EXC303 - Exchange Server 2007 SP1 Overview Martin Coetzer Technical Consultant Microsoft.
OSIsoft High Availability PI Replication
Read/understand sizing, scalability, capacity guidance Documentation on technet, Exchange team blog, etc. Collect data on existing deployment.
Exchange Deployment Planning Services Exchange 2010 Complementary Products.
Cluster Shared Volumes Reborn in Windows Server 2012
Module 1 Introduction to Designing a Microsoft® Exchange Server 2010 Deployment.
Exchange Server 2007 Deployment and Migration Strategies Nireshen Beerbul
Scott Schnoll m Microsoft Corporation.
Service Pack 2 System Center Configuration Manager 2007.
Complete VM Mobility Across the Datacenter Server Virtualization Hyper-V 2012 Live Migrate VM and Storage to Clusters Live Migrate VM and Storage Between.
Patrick Ortiz Global SQL Solution Architect Dell Inc. BIN209.
BE-com.eu Brussel, 26 april 2016 EXCHANGE 2010 HYBRID (IN THE EXCHANGE 2016 WORLD)
Appendix B Advanced Topics in Exchange Server 2010.
OSIsoft High Availability PI Replication Colin Breck, PI Server Team Dave Oda, PI SDK Team.
WorkDiff Mobile, Scenario-Based Collaboration Solution WorkDiff Allows Users to Work Differently While Using Familiar Functions of Microsoft Office 365.
Business Continuity for Virtual SQL Servers
Providing reliable SMB shares in Microsoft Azure
CONFIGURING A MICROSOFT EXCHANGE SERVER 2003 INFRASTRUCTURE
Software Defined Storage
Always On Multi-Site Patterns
Required 9s and data protection: introduction to sql server 2012 alwayson, new high availability solution Santosh Balasubramanian Senior Program Manager.
Always On : Multi-site patterns
2018 Huawei H Real Questions Killtest
CIS 409 RANK Lessons in Excellence-- cis409rank.com.
Microsoft Azure P wer Lunch
Windows Server 2016 Software Defined Storage
Microsoft Virtual Academy
Microsoft Exchange Server Virtualisation: Does It Make Sense?
M7: New Features for Office 365 Identity Management
Backup Monitoring – EMC NetWorker
Backup Monitoring – EMC NetWorker
Using the Cloud for Backup, Archiving & Disaster Recovery
Building global and highly-available services using Windows Azure
Windows Azure Hybrid Architectures and Patterns
Microsoft Virtual Academy
Presentation transcript:

Microsoft TechNet Seminar 2006 Session 3: Messaging Doug Gowans – Consultant Daniel Kenyon-Smith – Consultant MCS Talks Infrastructure Architecture Seminar Name

Live Meeting Information... Microsoft TechNet Seminar 2006 Live Meeting Information... Feedback Panel Questions & Answers Blog - http://blogs.technet.com/MCSTalks Seminar Name

Microsoft TechNet Seminar 2006 Session 3: Messaging Doug Gowans – Consultant Daniel Kenyon-Smith – Consultant MCS Talks Infrastructure Architecture Seminar Name

Microsoft TechNet Seminar 2006 Session Agenda Project Methodology Contoso Network Infrastructure Contoso Messaging Environment Business Drivers Proposed Infrastructure Mailbox Routing Remote Users Client Access Summary Q & A Seminar Name

Microsoft TechNet Seminar 2006 Project Methodology Envision Planning Developing Stabilizing Deploying Seminar Name

Contoso Network Infrastructure Microsoft TechNet Seminar 2006 Contoso Network Infrastructure London LAN Glasgow LAN 100MB 1GB Ireland 1000 Users Development 1MB to 8MB ADSL Manchester 25,000 Users Call Centre Glasgow 25,000 Users Manufacturing London 6,000 Users Head Office 10MB Remote VPN Users 3,000 Manchester LAN 1MB 2MB 1GB 1MB York 100 Users India 1500 Users Development Bristol Fail Over Data Centre Manchester Data Centre 10MB Newcastle 350 Users 10MB 1MB 1MB 512KB 512KB 1MB 1MB Edinburgh 400 Users Birmingham 750 Users New York 30 Users Tokyo 10 Users Paris 20 Users Exeter 500 Users Oxford 250 Users Reading 350 Users Seminar Name

Contoso Messaging Environment Microsoft TechNet Seminar 2006 Contoso Messaging Environment London 6,000 Users Head Office London LAN Bristol Fail Over Data Centre Manchester LAN Glasgow LAN Glasgow 25,000 Users Manufacturing 1GB 100MB Manchester 25,000 Users Call Centre Glasgow RG Manchester RG London RG Shared Storage Shared Storage Shared Storage Shared Storage 10MB Birmingham 750 Users Seminar Name

E2K3 Environment – Key Points Microsoft TechNet Seminar 2006 E2K3 Environment – Key Points Platform based on Exchange 2003 and Windows 2003 Relatively complex routing topology based on Exchange 2003 Routing Group configuration Back-End Servers in A\A\A\P cluster configuration (Standalone servers in Birmingham) Multiple Message Bridgehead & FE servers deployed Synchronous SAN Replication between Manchester & Bristol DR Data Centre No site resilience for Manchester, Birmingham or London Tape infrastructure in every datacentre Seminar Name

Contoso Business Drivers Microsoft TechNet Seminar 2006 Contoso Business Drivers Reduce the cost of operating the messaging platform Standardise levels of availability and resilience to site and component failure across Contoso Reduce operational overhead by standardising technology across the platform where possible Meet recently introduced Service Level Agreements Functional requirements of the service should be functionally equivalent to the current platform Create a consistent platform on which to progress the adoption of ancillary services such as Mobile device access & 3rd party archive solutions Seminar Name

Microsoft TechNet Seminar 2006 Mailbox London 6,000 Users Head Office London LAN Bristol Fail Over Data Centre Manchester LAN Glasgow LAN Glasgow 25,000 Users Manufacturing 1GB 100MB CCR Cluster SCR Target London CCR Clusters SCR Target Glasgow SCR Target Manchester CCR Clusters Manchester 25,000 Users Call Centre Birmingham 750 Users Seminar Name

Microsoft TechNet Seminar 2006 Mailbox– Key Points CCR within each datacentre – MNS 2 node clusters SCR targets in DR datacentres Reliance on expensive storage solutions eliminated – deploy DAS and reduce costs DAS means that more of the infrastructure is brought into the messaging support teams Backup via DPM which reduces the reliance on a large tape infrastructure Seminar Name

Microsoft TechNet Seminar 2006 Routing London LAN Manchester 25,000 Users Call Centre Glasgow LAN HT 1GB London 6,000 Users Head Office 100MB Glasgow 25,000 Users Manufacturing HT ADSite2 Manchester LAN Manchester Data Centre ADSite1 Seminar Name

Microsoft TechNet Seminar 2006 Routing – Key Points Routing now based upon AD site topology and therefore less complex to manage Use SubmissionServerOverrideList to control routing in Manchester & Glasgow datacentres (members of the same AD site) Seminar Name

Microsoft TechNet Seminar 2006 Remote Users Bristol Fail Over Data Centre Manchester LAN 25,000 Users Call Centre Glasgow LAN Glasgow Manufacturing 1GB 10MB Birmingham 750 Users Seminar Name

Remote Users – Key Points Microsoft TechNet Seminar 2006 Remote Users – Key Points Bringing mailboxes into central datacentres enables service to meet agreed SLA’s Birmingham users brought into central datacentre providing latency and bandwidth requirements can be met Reduction in costs of providing infrastructure in Birmingham Seminar Name

Microsoft TechNet Seminar 2006 Client Access London LAN Manchester 25,000 Users Call Centre Glasgow LAN HT 1GB London 6,000 Users Head Office 100MB Glasgow 25,000 Users Manufacturing HT ADSite2 Manchester LAN Manchester Data Centre ADSite1 Seminar Name

Client Access – Key Points Microsoft TechNet Seminar 2006 Client Access – Key Points If Contoso want a unified namespace for OWA then CAS servers in Manchester will proxy requests to London Otherwise use separate namespaces in Manchester and London Seminar Name

Microsoft TechNet Seminar 2006 Backup Solution Current Backup Solution Using traditional streaming backups – nightly full backups Proposed Backup Solution VSS backups – nightly changes plus 15 minute incremental transaction log syncs Plus tapes for longer term archival Seminar Name

Windows 2008 Operating System benefits Microsoft TechNet Seminar 2006 Windows 2008 Operating System benefits Faster log Shipping Support for multi-subnet failover cluster Improvements for Client Access Servers (CAS) Reduced downtime for hardware maintenance Near-Zero downtime for NTFS corruption Easier deployment Support for IPv6 Seminar Name

Hardware Virtualisation Microsoft TechNet Seminar 2006 Hardware Virtualisation Generally not recommended for any Exchange role Verify support stance for your chosen solution Ensure that virtualisation does not introduce additional layers of complexity in management and recoverability Seminar Name

Microsoft TechNet Seminar 2006 Considerations People Process Technology Seminar Name

Microsoft TechNet Seminar 2006 Summary Reduction in the cost of operating the messaging platform Cheaper Storage – DAS plus on storage replication No infrastructure in Birmingham Support costs reduced as less complex to operate Less reliance on expensive tape infrastructure Standardise levels of availability and resilience to site and component failure across Contoso CCR plus SCR is strategy for mailbox role resilience N+1 for CAS and Hub Transport role servers The same infrastructure across Contoso Reduce operational overhead by standardising technology across the platform where possible Seminar Name

Microsoft TechNet Seminar 2006 Summary Continued Functional requirements are that the service should be functionally equivalent to the current platform Create a consistent platform on which to progress the adoption of ancillary services such as Mobile device access & 3rd party archive solutions Reduce operational overhead by standardising technology across the platform where possible Messaging platform have more control over a standard platform – DAS, DPM, CCR\SCR across Contoso Meet recently improved Service Level Agreements SLA’s concerning resumption of service given component & datacentre failures can now be met MNS clusters, CCR, SCR, N+1 Seminar Name

Microsoft TechNet Seminar 2006 Thank you for attending this TechNet Event Find these slides at: http://www.microsoft.com/uk/technetslides Visit our blog at: http://blogs.technet.com/mcstalks Doug Gowans Blog http://blogs.msdn.com/douggowans Daniel Kenyon-Smiths Blog http://blogs.technet.com/danielkenyon-smith Register for the next session, Messaging, at: http://msevents.microsoft.com/CUI/EventDetail.aspx?EventID=1032386416&Culture=en-GB Please fill out your evaluations! Seminar Name