“Established on RNP” Jeff Williams – IATA

Slides:



Advertisements
Similar presentations
A PERFORMANCE BASED GLOBAL AIR NAVIGATION SYSTEM: PART II
Advertisements

Jeffrey T. Williams Manager, RNAV & RNP Group Air Traffic Organization
2017/3/28 Hong Kong PBN implmentation ICAO GNSS Implementation Seminar/Workshop 26 March 2012 ICAO FPP fdsagsdfgsdgsdgasdfsadf 1.
PBN ICAO HQ Activities Overview
Procedure Design Considerations
SC227 – SC214 ISRA – Datalink Interface. PBN Manual, Part A, Chapter On-board performance monitoring and alerting On-board performance.
By: Steve Lang Date: September 2007 Federal Aviation Administration Wake Vortex R&D Status Briefing NBAA Convention.
“Established on RNP” Jeff Williams – IATA
Ames Research Center 1October 2006 Aviation Software Systems Workshop FACET: Future Air Traffic Management Concepts Evaluation Tool Aviation Software Systems.
VISUAL APPROACHES.
Mr. Hooper Harris FAA/JAA Annual Meeting Phoenix, AZ June 3 - 7, 2002
Presented to: By: Date: Federal Aviation Administration Performance Based Navigation in USA Program Status and Processes ICAO Asia and Pacific Region Performance.
Airline PBN Operations & Desired Entry Competency Elizabeth Bjerke University of North Dakota.
Federal Aviation Administration Presented To: IPACG/39 Presented By: Dennis Addison, FAA Date: February 5-6, 2014 IP09: LOST FUEL SAVINGS DUE TO LACK OF.
PBN Airspace Concept Process
Area Nav: RNP Evolution
A- Class B airspace to 10,000 feet MSL.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-65/PIA-1 Optimization of Approach Procedures Including Vertical Guidance.
© 2003 The MITRE Corporation. All Rights Reserved. Cockpit Display of Traffic Information (CDTI) Enhanced Flight Rules (CEFR) Randall Bone October 7, 2003.
1 July 18, 2011 Runway 19 Dalton Departure Procedure Flight Crews requesting the Dalton 19 Departure MUST possess the chart and adhere strictly to the.
NTAS NextGen Videos  Satellite Based navigation  ADS-B ◦ In / Out  Performance Based Navigation ◦ RNP/RNAV  TBO  Data Link Communications.
6-1 Design of UAV Systems UAV operating environmentsc 2002 LM Corporation Lesson objective - to discuss UAV Operating Environments including … National.
1 Presented by Erwin Lassooij (ICAO, Montreal) Presented by Erwin Lassooij (ICAO, Montreal) From RNP divergence to Performance Based Navigation Convergence.
© 2011 The MITRE Corporation. All rights reserved. Advisory Vertical Guidance (Advisory VNAV) A Useful and Flexible Safety Enhancement S.V. Massimini,
ADVANCED AVIATION TECHNOLOGIES RELATED TO AVIATION CAPACITY IMPROVEMENTS Prepared for: MTC Prepared By: Don Crisp ATAC February 23, 2007.
NextGen Current System Primary Radar – Creates blip on Radar Screen Secondary Radar – Aircraft encodes identifier and telemetry data VHF Radio – Voice.
PBN Deployment – New Zealand Domestic Airspace CAA PBN Forum November Auckland.
Performance Based Navigation (PBN) Canadian Implementation Presentation to Air Transport Association of Canada 9 November 2010.
“METHODS OF OPTIMIZING THE USE OF AIRSPACE” “МЕТОДИ ОПТИМІЗАЦІЇ ВИКОРИСТАННЯ ПОВІТРЯНОГО ПРОСТОРУ” MASTER’S DEGREE THESIS KYIV 2015 MINISTRY OF EDUCATION.
Presented to: By: Date: Federal Aviation Administration ADS-C CDP Climb/Descend Procedure Implementation Project Update IPACG/39 Keith Dutch, FAA 03 –
NextGen Next Generation Air Transportation System
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-65/PIA-1 Optimization of Approach Procedures Including Vertical Guidance.
Federal Aviation Administration What’s New In Instrument Flight Procedures Jerry Lebar, Eastern Flight Procedures Office March 3, 2010 Hershey Airports.
Enhanced Flight Following. Major Concepts  “Second Opinion”  Positive Flight Following  Resource for Captain.
Basics of RNP. Outline  What is RNP?  Why implement RNP?  What does it mean for communities?
Transition to RNP 4/10 (MNPS to PBN)
Federal Aviation Administration Integrated Arrival/Departure Flow Service “ Big Airspace” Presented to: TFM Research Board Presented by: Cynthia Morris.
Performance Based Navigation in USA
FAA NAVAID Rationalization / Resiliency Overview
Holding Procedures.
Допълнение 7 на PANS-ATM (ICAO Doc 4444)
Overview of Continental En-route Navigation Specifications
Global Aircraft Tracking Initiatives
Airports, Airspace, & Radio Communication
ADS-B OUT - IATA VIEW ADS-B SITF/11 – Jeju, Korea 24 – 27 April 2012
VARIOUS KINDS OF SEPARATION
Airline PBN Operations & Desired Entry Competency
OPERATIONS ON PARALLEL OR NEAR-PARALLEL RUNWAYS
A PERFORMANCE BASED GLOBAL AIR NAVIGATION SYSTEM: PART II
Workshop on preparations for ANConf/12 − ASBU methodology
2018/6/11 Hong Kong PBN implmentation ICAO GNSS Implementation Seminar/Workshop 26 March 2012 ICAO FPP fdsagsdfgsdgsdgasdfsadf 1.
Continuous Climb Operations (CCO) Saulo Da Silva
SEPARATION Module 1, Topic 1.
Workshop on preparations for ANConf/12 − ASBU methodology
Continuous Descent Operations (CDO) Saulo Da Silva
Mr. Kevin Lam Director of Airport Infrastructure & Air Navigation
Basics of RNP.
Continuous Climb Operations (CCO) Saulo Da Silva
ASEAN PBN Routes Objectives:
DCA, A Pilot’s Perspective
Global Air Navigation Plan (GANP) Aviation System Block Upgrade (ASBU)
Workshop on preparations for ANConf/12 − ASBU methodology
RNAV and RNP Strategy in Japan
Oceanic and International Operations
CHINA GO TEAM VISIT 2014 Opening Civil/Military Session
Safety / Performance Criteria Agreeing on Assumptions
Airspace Volumes and Sectorisation Good Design Practice
PBN ICAO HQ Activities Overview
RNAV – process in Tartu How EAVA can co-operate with service providers ONE example - still in progress,,
Presentation transcript:

“Established on RNP” Jeff Williams – IATA PBN Go Team Beijing “Established on RNP” Jeff Williams – IATA

What is “Established on RNP”? Allows ATC to clear aircraft on a simultaneous RNP approach with a turn to final without providing a minimum of 1000 feet vertical or 3 miles radar separation from aircraft established on approaches to parallel runways FAA JO 7110.65 5-9-6 (Dependent), 5-9-7 (Independent) ICAO Doc 4444 6.7.3.4 (Dependent), 6.7.3.2 (Independent) Applies to both simultaneous dependent (e.g. Seattle) and independent (e.g. Atlanta) approaches to parallel runways Provides shorter, repeatable and stabilized paths to runway for RNP aircraft

Established on RNP – Seattle Simul

Single Track Through the Bay in All Weather Conditions - SEA 12 miles further Level Flight 6000 B6500 A6000 5000 Continuous 3 degree Glideslope from HEDDR(VASHN)

Established on RNP - Atlanta Simultaneous Independent Parallel Approaches

Established on RNP Concept Simultaneous Independent Triple Arrivals @ ATL Current Separation Standard - 1000 Foot of Vertical Separation To Be Maintained Between Simultaneous Approaches Until Deemed Established

© 2013 The MITRE Corporation. All rights reserved. ATL RVFPs (Source MITRE) IFR / 5 February 2014 (303 Tracks) TF and RF / 13 Jan – 7 Feb 2014 (884 Tracks) IFR TF RF © 2013 The MITRE Corporation. All rights reserved.

SELECTED: 13 Jan – 7 Feb 2014 (523 tracks)TF Only © 2013 The MITRE Corporation. All rights reserved.

SELECTED: 13 Jan – 7 Feb 2014 (361 tracks) RF Only © 2013 The MITRE Corporation. All rights reserved.

PBN Challenges Integrated Airspace Design and TFM Approach ATC Tools Strategic (TBFM) Tactical (Merging and spacing) Harmonized Operator Approach on Procedure Design Mixed Equipage Capability vs Approved TF and RF

Questions??