Introduction to Geotechnical Engineering

Slides:



Advertisements
Similar presentations
Cofferdam.
Advertisements

CONSTRUCTION DRILLING INC. SPECIALIZING IN UNIQUE DRILLING AND CUT-OFF WALL SOLUTIONS.
Xing Zhang Yifan Zhang Fan Yang.  A Large-scale Coal Mine locates at this area.  The problem of subsidence here is quite serious.  Use TRANSIENT.
Measurement for Civil Engineering works
Foundations Purpose – To transfer weight of structure (including live loads) to the ground within allowable settlement criteria.
Foundation Engineering and Design
GEOTECHNICAL ENGINEERING Session 07 Subject: S0012 / Introduction to Civil Engineering Year: 2007.
Foundations and basements
Construction Monitoring For Earth Dams 1 Fars Science and Research Branch, Islamic Azad University.
Lateral Earth Pressures
Foundations Excavations
Foundations. Foundation supports weight of structure –Includes soil and rock under foundation –Building construction described by foundation type Slab.
SIVA 1 Introduction to Geotechnical Engineering ground Duration: 11 min 56 s.
CONSTRUCTION.
G3 – Environmental Geomechanics (Dr Sam Yuen)
SOIL, GEOTECHNICAL ENGINEERING AND FOUNDATION ENGINEERING
CE 120 Introduction to Civil Engineering
Foundation Engineering CE 483
CE 120 Introduction to Civil Engineering
Lecture 11 Advance Design of RC Structure Retaining walls
SIVA 1 Introduction to Geotechnical Engineering N. Sivakugan ground Duration: 13 mins.
Commercial Foundations
Chapter 2b Foundations Shallow & Deep Foundations.
Mata kuliah: S0892 – Ground Improvement Method Tahun: 2010 Case Study Session
C ONTACT STRESS IN CIVIL ENGINEERING. Introduction 1 Skyscrapers Bridges Dams How are these constructions supported? Why are all these large constructions.
BASICS ELEMENTS OF CIVIL ENGINNERING Prepaid by:
Other Construction Projects
 Do you have an Interest in Math and Science?  Do you have good problem solving skills?  Do you approach problems in an analytical manner?  Can.
FROM UNDERGROUND … Address: 59, 3 rd September Str. GR 10433, Athens, Greece s:
Ground Improvement Issues & Techniques
Department of Civil Engineering,
AN INTEGRATED DESIGN CONCEPT … … FROM UNDERGROUND UP TO THE TOP ODOTECHNIKI LTD CONSULTING ENGINEERS Address: 59, 3 rd September Str.
BCM 210 Foundation Issues- Fall 2000 refer to Allen Text
SIVA 1 GEOTECHNICAL ENGINEERING - II Course Overview Dr. Nasrullah Abeer ground.
CIVIL ENGINEERING. Civil engineering work includes: dams embankments motorways bridges buildings cuttings quarries tunnels mines All these need to take.
Project title : Typical design of community college Supervisors: 1-Prof.Dr.abdulmohsion W. Dhowain 2-Dr. Mohammad Jamal AL Shannag 3-Dr. Ibrahim Hamouda.
The Leaning Tower of Pisa
City of Winnipeg SOUTHWESTERN RAPID TRANSIT CORRIDOR Bidder Meeting October 16 th, 2009.
Foundation Loads Dead Load Live Load Wind Load
BUILDING CONSTRUCTION
COFFERDAMS.
SOIL MECHANICS AND FOUNDATION ENGINEERING-II (CE 311)
GROUND IMPROVEMENT TECHNIQUES
GLE/CEE 330: Soil Mechanics Introduction to Foundation Engineering
FOUNDATIONS.
BULDING CONSTRUCTION ( )
BUILDING CONSTRUCTION
Part 10-2a Micropiles and self drilling rods in soil and rock engineering V-2009 (rev. II-2013) (Part 10-2a, PP 2007, animation+p/r : compr.)
SAL INSTITUTE OF TECHNOLOGY AND ENGEENIRING RESEARCH Ahmedabad B.E (3rd Semester)-Civil-Shift 2 December-2014 Shah Disha R.( ) Gosai Beran.( )
Topic: soil investigation
Copyright February 10, Introduction to Geotechnical Engineering Prof. Basuony El-Garhy Geotechnical Engineering and Foundations Civil Engineering.
Building Foundations.
Introduction to Geotechnical Engineering
Geotechnical Engineering II
GEOTECHNICAL ENGINEERING Session 07
Substructure Groundworks - Hazards
Faculty Of Civil engineering department BMCET,SURAT.
DARSHAN INSTITUTE OF ENGINEERING & TECHNOLOGY
Construction Mr. O’Rourke
SOIL, GEOTECHNICAL ENGINEERING AND FOUNDATION ENGINEERING
Aspek Geoteknik.
Various Fields in Civil Engineering By R.Janani
B.V.Patel Institute of Technology-Diploma studies
Geotechnical Engineering II
CT Reinforced Earth Structures
Foundations.
اصول گودبرداری و ایمن سازی
PAT GEOTECHNIC INTRODUCTION TO GEOTECHNICAL ENGINEERING.
Graduation Project Bracing system for deep excavation.
Presentation transcript:

Introduction to Geotechnical Engineering ground N. Sivakugan Duration: 11 min 56 s

Typical Geotechnical Project Geo-Laboratory ~ for testing Design Office ~ for design & analysis soil properties design details soil samples construction site

Geotechnical Applications

Shallow Foundations ~ for transferring building loads to underlying ground ~ mostly for firm soils or light loads bed rock firm ground

Shallow Foundations

Deep Foundations ~ for transferring building loads to underlying ground ~ mostly for weak soils or heavy loads P I L E bed rock weak soil

Deep Foundations Driven timber piles, Pacific Highway

Retaining Walls ~ for retaining soils from spreading laterally Road Train retaining wall

Earth Dams ~ for impounding water soil reservoir clay core shell

Concrete Dams reservoir soil concrete dam

Concrete Dams Three Gorges Dam, Hong Kong

Concrete Dams

Earthworks ~ preparing the ground prior to construction Roadwork, Pacific Highway

Construction hazard ~ an unwelcome visitor at an earthwork site. What does it have to do with Geo?#! A dead Anaconda python (courtesy: J. Brunskill)

Geofabrics ~ used for reinforcement, separation, filtration and drainage in roads, retaining walls, embankments… Geofabrics used on Pacific Highway

Reinforced Earth Walls ~ using geofabrics to strengthen the soil

Soil Nailing ~ steel rods placed into holes drilled into the walls and grouted

Sheet Piles ~ sheets of interlockingsteel or timber driven into the ground, forming a continuous sheet ship warehouse sheet pile

Sheet Piles ~ resist lateral earth pressures ~ used in excavations, waterfront structures, ..

Sheet Piles ~ used in temporary works

Sheet Piles ~ interlocking sections

Cofferdam ~ sheet pile walls enclosing an area, to prevent water seeping in Cofferdams are often used in temporary works, to enclose the construction area within a continuous sheet pile wall around and protect it from water entering from outside.

Landslides

Shoring propping and supporting the exposed walls to resist lateral earth pressures

Tunneling

Blasting For ore recovery in mines

Ground Improvement Impact Roller to Compact the Ground

Ground Improvement Sheepsfoot Roller to Compact Clay Soils

Ground Improvement Smooth-wheeled Roller

Ground Improvement Big weights dropped from 25 m, compacting the ground. Craters formed in compaction

Environmental Geomechanics Waste Disposal in Landfills

Instrumentation ~ to monitor the performances of earth and earth supported structures ~ to measure loads, pressures, deformations, strains,… Finally, proof of the pudding is in the eating. Very often we monitor the performances of foundations, tie backs, embankments etc. for a long time after construction, to verify that it is performing to our expectations. Geotechnical engineering involves lots of uncertainty in the soil properties used in the designs and the theories. Instrumentation is a popular method to verify the theories, assumptions, construction methods etc.

Soil Testing Cone Penetration Test Truck – Lavarach Barracks, Townsville

Soil Testing Vane Shear Test Standard Penetration Test More Field Tests

Soil Testing Triaxial Test on Soil Sample in Laboratory

Soil Testing Variety of Field Testing Devices

Soil Testing Purdue University, USA Being Pushed around by my Supervisors

Typical Safety Factors Type of Design Safety Factor Probability of Failure Earthworks 1.3-1.5 1/500 Retaining structures 1.5-2.0 1/1500 Foundations 2.0-3.0 1/5000

Some unsung heroes of Civil Engineering… foundations soil exploration tunneling All structures need proper foundations. To design good foundations, it is essential to know the geotechnical characteristics of the underlying ground. The only way to know them is to test the soil. … buried right under your feet.

Great Contributors to the Developments in Geotechnical Engineering Hall of Fame Great Contributors to the Developments in Geotechnical Engineering

Siva’s teacher in USA – deserves gold frame WJM Rankine 1820-1872 A.Casagrande 1902-1981 C.A.Coulomb 1736-1806 Karl Terzaghi 1883-1963 Siva’s teacher in USA – deserves gold frame L. Bjerrum 1918-1973 A.W.Skempton 1914- G.F.Sowers 1921-1996 G.A. Leonards 1921-1997

Geotechnical Engineering Landmarks Challenges Geotechnical Engineering Landmarks

Leaning Tower of Pisa Our blunders become monuments!

Hoover Dam, USA Tallest (221 m) concrete dam

Petronas Tower, Malaysia Tallest building in the world

Monuments and….

CS2005: Geo-Engineering I

Geo-engineering at JCU CS2005 Geo-engineering I CS3002 Geo-engineering I CS4001 Geo-engineering I Postgrad MEngSc/PhD

Practicals ~ five practical sessions ~ closed footwear must be worn in the lab

Laboratory Staff Neville Hines & Rudd Rankine

Quizzes How? about 4-6, 50 minutes each open book Why? to reinforce main points provides a wake up call form of assessment

Past CS2005 Grades 1996 1997 1998 1999 2000 2001 2002 HD 5 1 3 ? D 4 2 9 6 C 15 12 7 P 8 10 P- N 14 13 X Total 54 33 35 39 42

Some Suggestions Attend the lectures. It takes longer to understand from the lecture notes Develop a good feel for the subject. It is practical, interesting and makes lot of sense.

Some Suggestions Work in groups.

Some Suggestions Thou shall not wait till the last minute.

Exams My mama always said, “Exam is like a box of chocolates; you never know what you are gonna get”