Hybrid & Module Testing Status Week of 4/11-4/15
UCSB Hybrid Testing Status Weekly Cumulative Pass Fail % Pass L12pd 0.00% L34p 65 1 319 4 98.76% L56p 3 347 5 98.58% R5N 2 97.01% R5S 47 100.00% R6 87 98.86% R7 Total 69 865 12 98.63% Failing Hybrids Over-counted
UCSB Hybrid Testing Failures This Week 1 unknown failure Cumulative 3 with Shorts in PA Repairable 1 Major Scratch in PA 1 Smashed APV-PA Bonds 2 Failed Inspection Never should have sent 1 Broken Ceramic 1 Bad Bond Feet 1 Weak Wirebonds 1 with unknown failure
UCSB Hybrid Testing Issues Need to finish validation of new software Bruno contacted about bugs/features Need to add automatic upload of data to new software Hybrids with shorts need repairing Once repaired need to keep bookkeeping straight
UCSB ARCS Testing Status Weekly Cumulative A B F % A or B L12pu 0.00% L12pd L12su L12sd L34p 85 1 2 97.73% L56p 43 237 99.17% R5N 32 97.06% R5S R6 15 24 100.00% R7 Total 58 378 3 5 98.70%
UCSB ARCS Testing Failures This Week None Cumulative 1 with >2% Bad Channels Debris on sensor 1 Bad DCU 1 HV Shorted to CF Frame 2 with >20 mA Bias Current 1 leaky pinhole 1 scratched sensor
UCSB ARCS Testing Issues Need to confirm cuts on TEC modules Getting some confusion between 1SO/2SO Have not produced TEC R6 modules in a year Still need to validate ARCS 8.0 Currently using ARCS 7.2bugfix
UCSB Module Quality On 328 modules using HPK modules: 18 pinholes 47 shorts 45 noisy channels 86 opens Percentage of bad channels: 0.09%
UCSB LT Testing Status Weekly Cumulative Pass Fail % Pass L12pu 0.00% Pass Fail % Pass L12pu 0.00% L12pd L12su L12sd L34p 84 100.00% L56p 38 223 R5N 7 34 R5S R6 9 15 R7 Total 54 356