Ch. Boccard, M. Krupa, G. Schneider, R. Veness, M. Wendt

Slides:



Advertisements
Similar presentations
All experimenters meeting – July 7, 2014 LHC Crab Cavity Overview Tom Nicol – Fermilab All Experimenter’s Meeting July 7, It’s a group effort –
Advertisements

H. MAINAUD DURAND, A. HERTY, A. MARIN, M. ACAR PERMANENT MONITORING OF THE LHC LOW BETA TRIPLETS: LATEST RESULTS AND PERSPECTIVES.
SLAC rotating collimator for HiRadMat beam tests 14 March 2014 S. Redaelli, A. Bertarelli, CERN T. Markiewicz, SLAC US LHC Accelerator Research Program.
Aluminum bellows for experiments
CERN/CEA Collaboration agreement No. KE2275/TE WP5 – HTS insert Kick-off meeting 07/07/2014.
Engineering Department ENEN Status of TCSP manufacturing Collimation Working Group (CWG) 24 June 2013 A. Dallocchio, A. Bertarelli, F. Carra, L. Gentini,
1 Status of the CLIC two-beam module program A. Samochkine, G. Riddone Acknowledgements to the Module WG members 4 February 2014 CLIC Workshop 2014 (3-7.
1 Progress of IR Vacuum Chambers Chen Peng May 11,2007.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
 YE+4 disks = 2 Nos. (12 Sectors each)  Support Structures = 2Nos.  AISI 1045 steel bar = 1 No. for checking dimension of 680 mm (0/-0.5)  Fasteners.
Workshop Chamonix XV27-January-2006 DivonneMassimiliano Ferro-Luzzi 1 State of LHCb for the Sector Test  Overview  Agreement  Status of –VELO –exit.
CERN General Infrastructure Services Department CERN GS Department CH-1211 Geneva 23 Switzerland Db Futures Workshop
Hi-Lumi Conductor Procurement A.Ballarino, B. Bordini, L. Oberli HL-LHC/LARP International Review of Superconducting Cable for the HL-LHC Inner Triplets.
Lavs Issues Lav 12. Tube Planning future activities. Conclusions.
A. BallarinoEucard, 8 th WP7 HFM Annual MeetingWarsaw,24/04/2012 High-Tc Superconducting Link Status of Task 7.5 Eucard 2012, 8 th WP7 HFM Collaboration.
AFP-HPS /03/ D. D. INFN To/CERN PH UCM HPS240. Integration of Moving Beam Pipe and detector box. 1. Re-collection Layout of moving beam pipe.
L. Serin CNRS/IN2P3 AIDA Second Annual Meeting 1 Deliverables M1 - M128 M13-M246 M25-M367 M37-M4833 Y1 : All achieved, a few ones with 6 months delay Y2.
A. Faus-Golfe, J.V. Civera, C. Blanch and J.J. García-Garrigós whit the help of the CTF3 Collaboration 1 CTF3 meeting Jan-09.
Beam Vacuum Interconnect Design Options Ray Veness.
LCLS-II Button-type BPM (Review) Nikolay Solyak Review, FNAL, Dec. 12, 2014.
Wolfgang Vinzenz FAIR Proton Linac 10 th FAIR MAC November 25 th and 26 th 2013 Proton Linac 1 Status Buncher Design  Rectangular design, longitudinal.
DTL prototype summary and production sequence F.Grespan LNL _06_22 CDR.
February 4 th, Quality assurance plan: production, installation and commissioning N.Vauthier TE-CRG Technical Review on Beam Screen Heater Electronics.
High Energy Dump of the Super Proton Synchrotron at CERN – Present and Future designs A. Perillo-Marcone (EN-STI) Contributions from several colleagues.
Fabrication of LHC cavities at CERN N. Valverde Alonso, G. Favre,T. Tardy, F. Pillon, R. Claret, S. Mastoura, E. Rigutto,J. Geisser
F. Peauger - CEA DSM IRFU SACM 18 May 2008 CA.BHB 0400CA.SNH 0110CA.SNI 0120 CA.VVS 0100 CA.DHG/DVG 0130 CA.VVS 0200 CA.MTV 0215 CA.BPM 0220 CA.DHG/DVG.
ISTCInternational Science and technology Center, MoscowOfficial Coordinator BINPBudker Institute of Nuclear Physics of Siberian Branch of Russian Academy.
CERN – ENGINEERING DEPARTMENT: A. Dallocchio on behalf of EN-MME
ALIGNMENT OF THE NEW TRIPLETS
CERN – ENGINEERING DEPARTMENT: A. Dallocchio on behalf of EN-MME
Quality assurance for Manufacturing Dressed Cavities for SPS prototype cryomodule C. Parente (HL-LHC Technical Quality Officer) Date:
on behalf of the CLIC active pre-alignment team
Roadmap for triplet cryostats
Ultra-vacuum components and systems
Crab Cavities Contribution from the U.S.
TAXS and TAXN ABSORBERS - OVERVIEW
STATUS OF CIEMAT CONTRIBUTION TO CTF3 ( )
11 T Dipole Integration & Plans M. Karppinen
Testing of SC Magnets Status - November 2010
LIU Wire Scanner Milestones June 2017
Status of material tests
LEP cryostat Procurement strategy and plans
Cryostat procurement, status and plan, QA/QC
Manufacturing of the first FCC-hh beam screen prototype for ANKA
Complementary ISTC Projects #3888, 3889p
LARP Phase II Secondary Collimator RC1
Preliminary Y-chamber specifications – First draft
on behalf of the RF group
BINP, Sergey Pivovarov, Panda magnet meeting at GSl, June 07, 2016
PANDA Collaboration Meeting , BINP Sergey Pivovarov.
Cedric Garion, TE-VSC-DLM, WP12
(Procurement, testing of magnets)
HL-LHC-UK: UK contribution to HL-LHC Crab Cavities and evolution
Accelerator and Experiment Interface Session: LS2, LS3
GE alternative and outcome
Steering Meeting of EuCARD
Steering Meeting of EuCARD
Parts exchange for HL-LHC AUP Q1&Q3
Beam Wire Scanners (PS prototype and LIU series)
Status of the PANDA Solenoid Magnet Production in BINP
HIE-LINAC status report
ELENA Magnet Installation Planning
Update on beam screen issues
LARP Rotatable Collimators for LHC Phase II Collimation
Crab – RFD prototype: Fabrication Status Update
East Hall under construction
HL-LHC - WP15 modifications Coffrets Prise C4L8
Production Cryo HL-LHC BPMs
WP13 outsourcing: Hollow Electron Lens
Outsourcing for the BGC
Presentation transcript:

Manufacturing Plans for Inner Triplet Beam Position Monitors for HL-LHC Ch. Boccard, M. Krupa, G. Schneider, R. Veness, M. Wendt 08.03.2019 G. Schneider BE-BI

Content Deliverable Supplier Schedule 08.03.2019 G. Schneider BE-BI

Installation example BPMQSZTB 08.03.2019 G. Schneider BE-BI

Example of BPM, here BPMQSTZB 08.03.2019 G. Schneider BE-BI

Quantities: 08.03.2019 G. Schneider BE-BI

HL-LHC BPMs BPMQSTZA BPMQSTZB BPMQSWZA/B BPMQBWZA/B TOTAL Series 4 20 8 36 Spares 2 Prototypes M. Krupa / Cryo BPMs status and plans / 08/03/2019 / WP13 meeting

Quantities: 38 Cold BPMs of 3 types 6 Warm BPMs 08.03.2019 G. Schneider BE-BI

Collaboration Agreement with BINP under preparation EDMS 2082290 CERN delivers material Many skills required: Precision machining Gold plating Copper plating without organic additives (100 microns) Electron beam welding Laser welding Brazing to tungsten Precision tube bending Precision metrology UHV Cleaning 08.03.2019 G. Schneider BE-BI

Proposed delivery Schedule Design readiness by CERN: Q4 2019 Detailed technical specification by CERN: Q1 2020 Detailed manufacturing plan by BINP: Q2 2020 Start of prototype production by BINP: Q2 2020 Start of series production by BINP: Q1 2021 or 1 month after prototype acceptance by CERN BPM delivery to CERN: Q1 2022 or 12 months after start of series production 08.03.2019 G. Schneider BE-BI

Thank you 08.03.2019 G. Schneider BE-BI